[Back to previous page]
Generalities
- Wind farm name: Modoushan
- Country: China
- County / Zone: Yunnan
|
|
Details
- City: Huaning
- Commissioning:
- Turbine(s): (manufacturer name not available)
- Total nominal power: 48,000 kW
- Operational
- Onshore wind farm
- Operator: China Guangdong Nuclear Power
Localisation
- Latitude: 24° 18' 51.4"
- Longitude: 102° 53' 35.1"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 30 August 2022
Complete/correct this sheet: