[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Dahme
- Commissioning:
- 2 turbines: Neg Micon NM82/1500 (power 1 500 kW, diameter 82 m)
- Hub height:
- Total nominal power: 3,000 kW
- Operational
- Onshore wind farm
Part #2:
- City: Dahme
- Commissioning:
- 17 turbines: Neg Micon NM72c/1500 (power 1 500 kW, diameter 72 m)
- Hub height:
- Total nominal power: 25,500 kW
- Operational
- Onshore wind farm
Part #3:
- City: Dahme
- Commissioning:
- 1 turbine: Neg Micon NM72c/1500 (power 1 500 kW, diameter 72 m)
- Hub height:
- Total nominal power: 1,500 kW
- Operational
- Onshore wind farm
Part #4:
- City: Dahme
- Commissioning:
- 1 turbine: Neg Micon NM72c/1500 (power 1 500 kW, diameter 72 m)
- Hub height:
- Total nominal power: 1,500 kW
- Operational
- Onshore wind farm
Part #5:
- City: Dahme
- Commissioning:
- 5 turbines: Neg Micon NM72c/1500 (power 1 500 kW, diameter 72 m)
- Hub height:
- Total nominal power: 7,500 kW
- Operational
- Onshore wind farm
Part #6:
- City: Dahme
- Commissioning:
- 1 turbine: Neg Micon NM72c/1500 (power 1 500 kW, diameter 72 m)
- Hub height:
- Total nominal power: 1,500 kW
- Operational
- Onshore wind farm
Part #7:
- City: Dahme
- Commissioning:
- 1 turbine: Neg Micon NM72c/1500 (power 1 500 kW, diameter 72 m)
- Hub height:
- Total nominal power: 1,500 kW
- Operational
- Onshore wind farm
Part #8:
- City: Dahme
- Commissioning:
- 2 turbines: Neg Micon NM82/1500 (power 1 500 kW, diameter 82 m)
- Hub height:
- Total nominal power: 3,000 kW
- Operational
- Onshore wind farm
Part #9:
- City: Dahme
- Commissioning:
- 1 turbine: Neg Micon NM72c/1500 (power 1 500 kW, diameter 72 m)
- Hub height:
- Total nominal power: 1,500 kW
- Operational
- Onshore wind farm
Part #10:
- City: Dahme
- Commissioning:
- 12 turbines: Neg Micon NM82/1500 (power 1 500 kW, diameter 82 m)
- Hub height:
- Total nominal power: 18,000 kW
- Operational
- Onshore wind farm
Part #11:
- City: Dahmetal
- Commissioning:
- 4 turbines: GE Energy 2.5-120 (power 2 500 kW, diameter 120 m)
- Hub height:
- Total nominal power: 10,000 kW
- Operational
- Onshore wind farm
Part #12:
- Part: Görsdorf
- City: Dahmetal
- Commissioning:
- 1 turbine: GE Energy 2.5-120 (power 2 500 kW, diameter 120 m)
- Hub height:
- Total nominal power: 2,500 kW
- Operational
- Onshore wind farm
Localisation
Part #1:
- Latitude: 51° 52' 43.8"
- Longitude: 13° 31' 5.2"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 51° 52' 43.8"
- Longitude: 13° 31' 5.2"
- Geodetic system: WGS84
- Precise localization: no
Part #3:
- Latitude: 51° 52' 43.8"
- Longitude: 13° 31' 5.2"
- Geodetic system: WGS84
- Precise localization: no
Part #4:
- Latitude: 51° 52' 43.8"
- Longitude: 13° 31' 5.2"
- Geodetic system: WGS84
- Precise localization: no
Part #5:
- Latitude: 51° 52' 43.8"
- Longitude: 13° 31' 5.2"
- Geodetic system: WGS84
- Precise localization: no
Part #6:
- Latitude: 51° 52' 43.8"
- Longitude: 13° 31' 5.2"
- Geodetic system: WGS84
- Precise localization: no
Part #7:
- Latitude: 51° 52' 43.8"
- Longitude: 13° 31' 5.2"
- Geodetic system: WGS84
- Precise localization: no
Part #8:
- Latitude: 51° 52' 43.8"
- Longitude: 13° 31' 5.2"
- Geodetic system: WGS84
- Precise localization: no
Part #9:
- Latitude: 51° 52' 43.8"
- Longitude: 13° 31' 5.2"
- Geodetic system: WGS84
- Precise localization: no
Part #10:
- Latitude: 51° 52' 43.8"
- Longitude: 13° 31' 5.2"
- Geodetic system: WGS84
- Precise localization: no
Part #11:
- Latitude: 51° 52' 27.6"
- Longitude: 13° 29' 26.4"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #12:
- Part: Görsdorf
- Latitude: 51° 52' 27.6"
- Longitude: 13° 29' 26.4"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 7 June 2022
Complete/correct this sheet: