[Back to previous page]
Generalities
|
|
Details
- Commissioning:
- 63 turbines: Guodian United Power UP86 (power 1 500 kW, diameter 86 m)
- Total nominal power: 94,500 kW
- Operational
- Onshore wind farm
- Developer: LongYuan
- Source:
Localisation
- Latitude: -30° 43' 15.7"
- Longitude: 23° 50' 43.1"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 30 September 2024
Complete/correct this sheet: