- Commissioning:
- 24 turbines: Senvion MM82/2050 (power 2 050 kW, diameter 82 m)
- Total nominal power: 49,200 kW
- Operational
- Onshore wind farm
Localisation
- Latitude: 22° 48' 35.9"
- Longitude: 115° 55' 48"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 5 October 2020