[Back to previous page]
Generalities
|
|
Details
Part #1:
- Commissioning:

- 6 turbines: (manufacturer name not available)
- Total nominal power: 15,000 kW
- Operational
- Onshore wind farm
- Owner:

Part #2:
- Commissioning:

- 23 turbines: (manufacturer name not available)
- Total nominal power: 34,500 kW
- Operational
- Onshore wind farm
- Owner:

Localisation
Part 1 : no data.
Part 2 : no data.
Update for this sheet: 16 September 2022
Complete/correct this sheet: