[Back to previous page]
Generalities
|
|
Details
Part #1:
Part #2:
- Commissioning:

- 3 turbines: Bonus B44/600 (power 600 kW, diameter 44 m)
- Total nominal power: 1,800 kW
- Dismantled (2023/03)
- Onshore wind farm
- Source:

Localisation
Part #1:
- Latitude: -38° 52' 48"
- Longitude: -62° 4' 12"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
Update for this sheet: 9 May 2023
Complete/correct this sheet: