[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Osterby
- Commissioning:

- 6 turbines: Vestas V29/225 (power 225 kW, diameter 29 m)
- Hub height:

- Total nominal power: 1,350 kW
- Operational
- Onshore wind farm
- Source:

Part #2:
- City: Osterby
- Commissioning:

- 2 turbines: Vestas V29/225 (power 225 kW, diameter 29 m)
- Hub height:

- Total nominal power: 450 kW
- Operational
- Onshore wind farm
- Source:

Part #3:
- City: Osterby
- Commissioning:

- 1 turbine: Vestas V29/225 (power 225 kW, diameter 29 m)
- Hub height:

- Total nominal power: 225 kW
- Dismantled (2018/03)
- Onshore wind farm
- Source:

Part #4:
- City: Osterby
- Commissioning:

- 1 turbine: Vestas V29/225 (power 225 kW, diameter 29 m)
- Hub height:

- Total nominal power: 225 kW
- Dismantled (2019/09)
- Onshore wind farm
- Source:

Part #5:
- City: Osterby
- Commissioning:

- 1 turbine: Vestas V27/225 (power 225 kW, diameter 27 m)
- Hub height:

- Total nominal power: 225 kW
- Dismantled (2010/09)
- Onshore wind farm
- Source:

Part #6:
- City: Osterby
- Commissioning:

- 1 turbine: Vestas V27/225 (power 225 kW, diameter 27 m)
- Hub height:

- Total nominal power: 225 kW
- Dismantled (2010/09)
- Onshore wind farm
- Source:

Part #7:
- City: Osterby
- Commissioning:

- 1 turbine: Vestas V29/225 (power 225 kW, diameter 29 m)
- Hub height:

- Total nominal power: 225 kW
- Dismantled (2017/08)
- Onshore wind farm
- Source:

Part #8:
- City: Osterby
- Commissioning:

- 1 turbine: Vestas V29/225 (power 225 kW, diameter 29 m)
- Hub height:

- Total nominal power: 225 kW
- Dismantled (2016/12)
- Onshore wind farm
- Source:

Part #9:
- City: Osterby
- Commissioning:

- 1 turbine: Vestas V29/225 (power 225 kW, diameter 29 m)
- Hub height:

- Total nominal power: 225 kW
- Dismantled (2016/10)
- Onshore wind farm
- Source:

Part #10:
- City: Osterby
- Commissioning:

- 2 turbines: Vestas V29/225 (power 225 kW, diameter 29 m)
- Hub height:

- Total nominal power: 450 kW
- Dismantled (2016/04)
- Onshore wind farm
- Source:

Part #11:
- City: Osterby
- Commissioning:

- 1 turbine: Vestas V29/225 (power 225 kW, diameter 29 m)
- Hub height:

- Total nominal power: 225 kW
- Dismantled (2017/01)
- Onshore wind farm
- Source:

Localisation
Part #1:
- Latitude: 55° 59' 2.5"
- Longitude: 8° 20' 1.6"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 55° 59' 2.5"
- Longitude: 8° 20' 1.6"
- Geodetic system: WGS84
- Precise localization: no
Part #3:
- Latitude: 55° 59' 2.5"
- Longitude: 8° 20' 1.6"
- Geodetic system: WGS84
- Precise localization: no
Part #4:
- Latitude: 55° 59' 2.5"
- Longitude: 8° 20' 1.6"
- Geodetic system: WGS84
- Precise localization: no
Part #5:
- Latitude: 55° 59' 2.5"
- Longitude: 8° 20' 1.6"
- Geodetic system: WGS84
- Precise localization: no
Part #6:
- Latitude: 55° 59' 2.5"
- Longitude: 8° 20' 1.6"
- Geodetic system: WGS84
- Precise localization: no
Part #7:
- Latitude: 55° 59' 2.5"
- Longitude: 8° 20' 1.6"
- Geodetic system: WGS84
- Precise localization: no
Part #8:
- Latitude: 55° 59' 2.5"
- Longitude: 8° 20' 1.6"
- Geodetic system: WGS84
- Precise localization: no
Part #9:
- Latitude: 55° 59' 2.5"
- Longitude: 8° 20' 1.6"
- Geodetic system: WGS84
- Precise localization: no
Part #10:
- Latitude: 55° 59' 2.5"
- Longitude: 8° 20' 1.6"
- Geodetic system: WGS84
- Precise localization: no
Part #11:
- Latitude: 55° 59' 2.5"
- Longitude: 8° 20' 1.6"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 13 March 2020
Complete/correct this sheet: