[Back to previous page]
Generalities
|
|
Details
- City: Greven
- Commissioning:
- 13 turbines: Neg Micon NM60/1000 (power 1 000 kW, diameter 60 m)
- Total nominal power: 13,000 kW
- Operational
- Onshore wind farm
- Developer: e3 GmbH
- Source:
Localisation
- Latitude: 52° 5' 31.4"
- Longitude: 7° 36' 38"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 16 December 2022
Complete/correct this sheet: