[Back to previous page]
Generalities
|
|
Details
- City: Neustadt
- Commissioning:
- 6 turbines: Enercon E40/500 (power 500 kW, diameter 40 m)
- Hub height:
- Total nominal power: 3,000 kW
- Operational
- Onshore wind farm
- Developer: Alterric
Localisation
- Latitude: 52° 36' 13.7"
- Longitude: 9° 30' 9.2"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 1 September 2022
Complete/correct this sheet: