[Back to previous page]
Generalities
|
|
Details
Part #1:
- Part: Ventos de Santa Joana II
- City: Caldeirão Grande, Povoado de Serra das Gitiranas
- Commissioning:
- 16 turbines: GE Energy 1.85-87 (power 1 850 kW, diameter 87 m)
- Total nominal power: 29,600 kW
- Operational
- Onshore wind farm
- Developer: Casa dos Ventos
- Source:
Part #2:
- Part: Ventos de Santa Joana VI
- City: Caldeirão Grande, Povoado de Serra das Gitiranas
- Commissioning:
- 16 turbines: GE Energy 1.85-82.5 (power 1 850 kW, diameter 82.5 m)
- Total nominal power: 29,600 kW
- Operational
- Onshore wind farm
- Developer: Casa dos Ventos
- Source:
- Source:
Part #3:
- Part: Ventos de Santa Joana VIII
- City: Marcolândia
- Commissioning:
- 15 turbines: Gamesa
- Total nominal power: 30,000 kW
- Operational
- Onshore wind farm
- Developer: Casa dos Ventos
- Source:
Part #4:
- Part: Ventos de Santa Joana XIV
- City: Caldeirão Grande
- Commissioning:
- 15 turbines: Gamesa
- Total nominal power: 30,000 kW
- Operational
- Onshore wind farm
- Developer: Casa dos Ventos
- Source:
Part #5:
- Part: Ventos de Santo Augusto I
- City: Simoes
- Commissioning:
- 8 turbines: GE Energy 2.3-116 (power 2 300 kW, diameter 116 m)
- Total nominal power: 18,400 kW
- Operational
- Onshore wind farm
- Developer: Casa dos Ventos
- Owner:
- Source:
- Source:
- Source:
Part #6:
- Part: Ventos de Santo Augusto II
- City: Simoes
- Commissioning:
- 12 turbines: GE Energy 2.3-116 (power 2 300 kW, diameter 116 m)
- Total nominal power: 27,600 kW
- Operational
- Onshore wind farm
- Developer: Casa dos Ventos
- Owner:
- Source:
- Source:
- Source:
Part #7:
- Part: Ventos de Santo Augusto VI
- City: Simões
- Commissioning:
- 8 turbines: GE Energy 2.3-116 (power 2 300 kW, diameter 116 m)
- Total nominal power: 18,400 kW
- Operational
- Onshore wind farm
- Developer: Casa dos Ventos
- Owner:
- Source:
- Source:
- Source:
Part #8:
- Part: Ventos de Santo Augusto VII
- City: Simoes
- Commissioning:
- 13 turbines: GE Energy 2.3-116 (power 2 300 kW, diameter 116 m)
- Total nominal power: 29,900 kW
- Operational
- Onshore wind farm
- Developer: Casa dos Ventos
- Owner:
- Source:
- Source:
- Source:
Part #9:
- Part: Ventos de Santo Augusto VIII
- City: Simões
- Commissioning:
- 8 turbines: GE Energy 2.3-116 (power 2 300 kW, diameter 116 m)
- Total nominal power: 18,400 kW
- Operational
- Onshore wind farm
- Developer: Casa dos Ventos
- Owner:
- Source:
- Source:
- Source:
Part #10:
- Part: Ventos de Santo Estevão V
- City: Araripina
- Commissioning:
- 12 turbines: GE Energy 2.3-116 (power 2 300 kW, diameter 116 m)
- Total nominal power: 27,600 kW
- Operational
- Onshore wind farm
- Developer: Casa dos Ventos
- Owners: /
- Source:
- Source:
Part #11:
- Part: Ventos de São Virgilio I
- City: Simões
- Commissioning:
- 13 turbines: GE Energy 2.3-116 (power 2 300 kW, diameter 116 m)
- Total nominal power: 29,900 kW
- Operational
- Onshore wind farm
- Developer: Casa dos Ventos
- Owner:
- Source:
- Source:
- Source:
Part #12:
- Part: Ventos de São Virgilio II
- City: Simões
- Commissioning:
- 13 turbines: GE Energy 2.3-116 (power 2 300 kW, diameter 116 m)
- Total nominal power: 29,900 kW
- Operational
- Onshore wind farm
- Developer: Casa dos Ventos
- Source:
- Source:
Part #13:
- Part: Ventos de São Virgilio III
- City: Simões
- Commissioning:
- 9 turbines: GE Energy 2.3-116 (power 2 300 kW, diameter 116 m)
- Total nominal power: 20,700 kW
- Operational
- Onshore wind farm
- Developer: Casa dos Ventos
- Source:
- Source:
Part #14:
- Part: Ventos do Santo Onofre IV
- City: Simões
- Commissioning:
- 12 turbines: GE Energy 2.3-116 (power 2 300 kW, diameter 116 m)
- Total nominal power: 27,600 kW
- Operational
- Onshore wind farm
- Developer: Casa dos Ventos
- Owner:
- Source:
- Source:
- Source:
Localisation
Part #1:
Part #2:
Part #3:
Part #4:
Part #5:
Part #6:
Part #7:
Part #8:
Part #9:
Part #10:
- Part: Ventos de Santo Estevão V
- Latitude: -7° 45' 35.6"
- Longitude: -40° 40' 23.8"
- Geodetic system: WGS84
- Precise localization: no
Part #11:
Part #12:
Part #13:
Part #14:
Update for this sheet: 28 October 2024
Complete/correct this sheet: