Generalities
|
|
Details
Part #1:
- City: Ahrensfelde
- Commissioning:
- 1 turbine: Nordex N163/6.X (power 6 000 kW, diameter 163 m)
- Hub height:
- Total nominal power: 6,800 kW (uprated turbine)
- Operational
- Onshore wind farm
Part #2:
- Part: Lindenberg I
- City: Ahrensfelde
- Commissioning:
- 1 turbine: Senvion MM92/2050 (power 2 050 kW, diameter 92.5 m)
- Hub height:
- Total nominal power: 2,050 kW
- Operational
- Onshore wind farm
- Developer: Teut
- Operator: Teut
- Source:
Part #3:
- Part: Lindenberg II
- City: Ahrensfelde
- Commissioning:
- 1 turbine: Senvion MM92/2050 (power 2 050 kW, diameter 92.5 m)
- Hub height:
- Total nominal power: 2,050 kW
- Operational
- Onshore wind farm
- Developer: Teut
- Operator: Teut
- Source:
Part #4:
- Part: Lindenberg III-IV
- City: Ahrensfelde
- Commissioning:
- 2 turbines: Senvion 3.4M104 (power 3 400 kW, diameter 104 m)
- Hub height:
- Total nominal power: 6,800 kW
- Operational
- Onshore wind farm
- Developer: Teut
- Operator: Teut
- Source:
Part #5:
- Part: Lindenberg V
- City: Ahrensfelde
- Commissioning:
- 1 turbine: Repower MM92 (power 2 000 kW, diameter 92 m)
- Hub height:
- Total nominal power: 2,000 kW
- Operational
- Onshore wind farm
- Developer: Teut
- Operator: Teut
- Source:
Part #6:
- Part: Lindenberg VI
- City: Ahrensfelde
- Commissioning:
- 1 turbine: Senvion 3.2M114 (power 3 200 kW, diameter 114 m)
- Hub height:
- Total nominal power: 3,200 kW
- Operational
- Onshore wind farm
- Developer: Teut
- Operator: Teut
- Source:
Localisation
Part #1:
- Latitude: 52° 36' 50.3"
- Longitude: 13° 32' 23.9"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
Part #3:
Part #4:
Part #5:
Part #6:
Update for this sheet: 5 December 2024