Generalities
|
|
Details
Part #1:
- City: Möckern
- Commissioning:
- 5 turbines: Enercon E44/600 (power 600 kW, diameter 44 m)
- Hub height:
- Total nominal power: 3,000 kW
- Operational
- Onshore wind farm
- Operator: Enertrag
- Owner:
- Source:
Part #2:
- City: Möckern
- Commissioning:
- 1 turbine: Enercon E44/600 (power 600 kW, diameter 44 m)
- Hub height:
- Total nominal power: 600 kW
- Operational
- Onshore wind farm
- Operator: Enertrag
- Owner:
- Source:
Part #3:
- City: Möckern
- Commissioning:
- 6 turbines: Enercon E70/2000 (power 2 000 kW, diameter 70 m)
- Hub height:
- Total nominal power: 12,000 kW
- Operational
- Onshore wind farm
- Operator: Enertrag
- Owner:
- Source:
Part #4:
- City: Möckern
- Commissioning:
- 2 turbines: Enercon E82/2000 (power 2 000 kW, diameter 82 m)
- Hub height:
- Total nominal power: 4,000 kW
- Operational
- Onshore wind farm
- Developer: BOREAS
- Source:
Part #5:
- Part: Büden
- City: Möckern, Biederitz
- Commissioning:
- 4 turbines: Vestas V90/2000 (power 2 000 kW, diameter 90 m)
- Hub height:
- Total nominal power: 8,000 kW
- Operational
- Onshore wind farm
- Developer: BOREAS
- Source:
Localisation
Part #1:
- Latitude: 52° 9' 35.4"
- Longitude: 11° 48' 12.3"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 52° 9' 35.4"
- Longitude: 11° 48' 12.3"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #3:
- Latitude: 52° 9' 35.4"
- Longitude: 11° 48' 12.3"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #4:
- Latitude: 52° 9' 35.4"
- Longitude: 11° 48' 12.3"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #5:
- Part: Büden
- Latitude: 52° 9' 35.4"
- Longitude: 11° 48' 12.3"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 22 August 2022
Complete/correct this sheet: