[Back to previous page]
Generalities
|
|
Details
- City: Maria de Huerva
- Commissioning:

- 29 turbines: Neg Micon NM48/750 (power 750 kW, diameter 48.2 m)
- Total nominal power: 21,750 kW
- Operational
- Onshore wind farm
- Operator: RWE
Localisation
Update for this sheet: 0
Complete/correct this sheet: