[Back to previous page]
Generalities
|
|
Details
- City: Maicao
- Turbine(s): (manufacturer name not available)
- Total nominal power: 80,000 kW
- Under construction
- Onshore wind farm
- Operator: Grupo Argos
- Owner:
Localisation
- Latitude: 11° 22' 48.2"
- Longitude: -72° 14' 46.2"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 6 June 2024
Complete/correct this sheet: