[Back to previous page]
Generalities
|
|
Details
- City: Cadrete, Maria
- Commissioning:
- 32 turbines: Neg Micon NM48/750 (power 750 kW, diameter 48.2 m)
- Total nominal power: 24,000 kW
- Operational
- Onshore wind farm
- Operator: RWE
Localisation
Update for this sheet: 3 January 2024
Complete/correct this sheet: