Part #1:
- City: Rastenberg
- Commissioning:
- 2 turbines: Enercon E40/500 (power 500 kW, diameter 40 m)
- Hub height:
- Total nominal power: 1,000 kW
- Operational
- Onshore wind farm
Part #2:
- City: Rastenberg
- Commissioning:
- 1 turbine: Enercon E40/600 (power 600 kW, diameter 40 m)
- Hub height:
- Total nominal power: 600 kW
- Operational
- Onshore wind farm
Part #3:
- City: Rastenberg
- Commissioning:
- 1 turbine: Enercon E53/800 (power 800 kW, diameter 52.9 m)
- Total nominal power: 800 kW
- Operational
- Onshore wind farm
- Developer: MVV Energie
Part #4:
- City: Rastenberg
- Commissioning:
- 2 turbines: Gamesa G80/2000 (power 2 000 kW, diameter 80 m)
- Hub height:
- Total nominal power: 4,000 kW
- Dismantled (2021/05)
- Onshore wind farm
- Developer: MVV Energie
Part #5:
- City: Rastenberg
- Commissioning:
- 2 turbines: Gamesa G80/2000 (power 2 000 kW, diameter 80 m)
- Hub height:
- Total nominal power: 4,000 kW
- Operational
- Onshore wind farm
- Developer: MVV Energie
Part #6:
- City: Rastenberg, Olbersleben, Buttstädt
- Commissioning:
- 10 turbines: Vestas V90/2000 (power 2 000 kW, diameter 90 m)
- Hub height:
- Total nominal power: 20,000 kW
- Operational
- Onshore wind farm
- Developer: WPD
- Owner:
- Source:
- Source:
Part #7:
- City: Rastenberg
- Commissioning:
- 3 turbines: Vestas V112/3075 (power 3 075 kW, diameter 112 m)
- Hub height:
- Total nominal power: 9,225 kW
- Operational
- Onshore wind farm
- Developer: WPD
- Owner:
- Source:
- Source:
Part #8:
- City: Rastenberg, Olbersleben
- Commissioning:
- 1 turbine: Vestas V90/2000 (power 2 000 kW, diameter 90 m)
- Hub height:
- Total nominal power: 2,000 kW
- Operational
- Onshore wind farm
- Developer: WPD
- Operator: WPD
- Owner:
- Source:
- Source:
Localisation
Part #1:
Part #2:
Part #3:
Part #4:
Part #5:
Part #6:
Part #7:
Part #8:
Update for this sheet: 21 April 2024