[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Obere Warnow
- Commissioning:
- 2 turbines: Enercon E82/2000 (power 2 000 kW, diameter 82 m)
- Hub height:
- Total nominal power: 4,000 kW
- Operational
- Onshore wind farm
Part #2:
- City: Grebbin
- Commissioning:
- 2 turbines: Enercon E40/500 (power 500 kW, diameter 40 m)
- Hub height:
- Total nominal power: 1,000 kW
- Dismantled
- Onshore wind farm
Part #3:
- City: Obere Warnow
- Commissioning:
- 4 turbines: Enercon E82/2000 (power 2 000 kW, diameter 82 m)
- Hub height:
- Total nominal power: 8,000 kW
- Operational
- Onshore wind farm
- Operator: RWE
- Owner:
Part #4:
- City: Grebbin
- Commissioning:
- 5 turbines: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
- Total nominal power: 11,500 kW
- Operational
- Onshore wind farm
- Developer: WPD
- Operator: WPD
- Source:
Part #5:
- City: Obere Warnow
- Commissioning:
- 2 turbines: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
- Hub height:
- Total nominal power: 4,600 kW
- Operational
- Onshore wind farm
- Developer: WPD
- Source:
Part #6:
- City: Grebbin
- Commissioning:
- Turbine(s): Enercon E40/500 (power 500 kW, diameter 40 m)
- Hub height:
- Dismantled
- Onshore wind farm
Localisation
Part #1:
- Latitude: 53° 30' 8.6"
- Longitude: 11° 52' 5.8"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 53° 30' 5.8"
- Longitude: 11° 52' 5.3"
- Geodetic system: WGS84
- Precise localization: no
Part #3:
- Latitude: 53° 30' 6.2"
- Longitude: 11° 50' 43.1"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #4:
- Latitude: 53° 29' 57"
- Longitude: 11° 51' 10.1"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #5:
- Latitude: 53° 29' 57"
- Longitude: 11° 51' 10.1"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #6:
- Latitude: 53° 30' 5.8"
- Longitude: 11° 52' 5.3"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 9 November 2022
Complete/correct this sheet: