[Back to previous page]
Generalities
|
|
Details
- City: Valladiego, Urbel del Castillo
- Commissioning:
- 31 turbines: Ecotecnia 74 (power 1 670 kW, diameter 74 m)
- Total nominal power: 51,770 kW
- Operational
- Onshore wind farm
- Developers: PE La Boga SL/Cobra
- Operator: ACS
- Source:
Localisation