[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Altenbeken
- Commissioning:
- 1 turbine: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
- Hub height:
- Total nominal power: 2,300 kW
- Operational
- Onshore wind farm
Part #2:
- City: Altenbeken
- Commissioning:
- 1 turbine: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
- Hub height:
- Total nominal power: 2,300 kW
- Operational
- Onshore wind farm
Part #3:
- City: Altenbeken
- Commissioning:
- 4 turbines: Nordex N27/150 (power 150 kW, diameter 27 m)
- Hub height:
- Total nominal power: 600 kW
- Operational
- Onshore wind farm
Part #4:
- City: Altenbeken
- Commissioning:
- 1 turbine: Enercon E40/500 (power 500 kW, diameter 40 m)
- Total nominal power: 500 kW
- Operational
- Onshore wind farm
Part #5:
- City: Altenbeken
- Commissioning:
- 1 turbine: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
- Hub height:
- Total nominal power: 2,300 kW
- Operational
- Onshore wind farm
Part #6:
- City: Altenbeken
- Commissioning:
- 1 turbine: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
- Hub height:
- Total nominal power: 2,300 kW
- Operational
- Onshore wind farm
- Operator: Brockmann Wind GmbH
Part #7:
- City: Altenbeken
- Commissioning:
- 1 turbine: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
- Hub height:
- Total nominal power: 2,300 kW
- Operational
- Onshore wind farm
- Operator: Brockmann Wind GmbH
Part #8:
- City: Altenbeken
- Commissioning:
- 1 turbine: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
- Hub height:
- Total nominal power: 2,300 kW
- Operational
- Onshore wind farm
Part #9:
- City: Altenbeken
- Commissioning:
- 1 turbine: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
- Hub height:
- Total nominal power: 2,300 kW
- Operational
- Onshore wind farm
Part #10:
- City: Altenbeken
- Commissioning:
- 1 turbine: Enercon E40/500 (power 500 kW, diameter 40 m)
- Hub height:
- Total nominal power: 500 kW
- Operational
- Onshore wind farm
Part #11:
- City: Altenbeken
- Commissioning:
- 1 turbine: Enercon E40/500 (power 500 kW, diameter 40 m)
- Hub height:
- Total nominal power: 500 kW
- Operational
- Onshore wind farm
Part #12:
- Part: Schwaney
- City: Altenbeken
- Commissioning:
- 1 turbine: Enercon E138/4200 (power 4 200 kW, diameter 138.25 m)
- Hub height:
- Total nominal power: 4,200 kW
- Operational
- Onshore wind farm
Part #13:
- Part: Schwaney
- City: Altenbeken
- Commissioning:
- 1 turbine: Enercon E138/4200 (power 4 200 kW, diameter 138.25 m)
- Total nominal power: 4,200 kW
- Operational
- Onshore wind farm
Localisation
Part #1:
- Latitude: 51° 46' 19.2"
- Longitude: 8° 55' 55.5"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 51° 45' 10.4"
- Longitude: 8° 55' 59.9"
- Geodetic system: WGS84
- Precise localization: no
Part #3:
- Latitude: 51° 44' 41.6"
- Longitude: 8° 56' 7.9"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #4:
- Latitude: 51° 26' 31.2"
- Longitude: 8° 33' 7.9"
- Geodetic system: WGS84
- Precise localization: no
Part #5:
- Latitude: 51° 43' 14.7"
- Longitude: 8° 52' 36.6"
- Geodetic system: WGS84
- Precise localization: no
Part #6:
- Latitude: 51° 43' 15.5"
- Longitude: 8° 53' 51.8"
- Geodetic system: WGS84
- Precise localization: no
Part #7:
- Latitude: 51° 44' 26.4"
- Longitude: 8° 55' 35.5"
- Geodetic system: WGS84
- Precise localization: no
Part #8:
- Latitude: 51° 44' 18.9"
- Longitude: 8° 55' 42.5"
- Geodetic system: WGS84
- Precise localization: no
Part #9:
- Latitude: 51° 0' 0"
- Longitude: 8° 33' 0"
- Geodetic system: WGS84
- Precise localization: no
Part #10:
- Latitude: 51° 43' 32.8"
- Longitude: 8° 53' 36"
- Geodetic system: WGS84
- Precise localization: no
Part #11:
- Latitude: 51° 43' 34.2"
- Longitude: 8° 53' 25.2"
- Geodetic system: WGS84
- Precise localization: no
Part #12:
- Part: Schwaney
- Latitude: 51° 43' 39.9"
- Longitude: 8° 54' 34.5"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #13:
- Part: Schwaney
- Latitude: 51° 43' 39.9"
- Longitude: 8° 54' 34.5"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 2 June 2024
Complete/correct this sheet: