[Back to previous page]
Generalities
|
|
Details
- City: Olvega, Noviercas
- Commissioning:
- 45 turbines: Made AE-30 (power 330 kW, diameter 30 m)
- Total nominal power: 14,850 kW
- Operational
- Onshore wind farm
- Developer: PES Madero
- Operator: PES Madero
Localisation
- Latitude: 41° 45' 0"
- Longitude: -1° 58' 47.9"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 3 January 2024
Complete/correct this sheet: