[Back to previous page]
Generalities
|
|
Details
- City: Mariestad
- Commissioning:
- 2 turbines: Fuhrländer FL 2500/100 (power 2 500 kW, diameter 100 m)
- Hub height:
- Total nominal power: 5,000 kW
- Operational
- Onshore wind farm
- Operator: Greenextreme AB
Localisation
- Latitude: 58° 42' 20.8"
- Longitude: 13° 49' 20.4"
- Altitude: 90 m
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 9 September 2024
Complete/correct this sheet: