Part #1:
- Part: Armamar
- City: Armamar
- Commissioning:

- 6 turbines: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
- Hub height:

- Total nominal power: 13,800 kW
- Operational
- Onshore wind farm
- Developer: ENEOP
- Source:

Part #2:
- Part: Armamar
- City: Armamar
- Commissioning:

- 2 turbines: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
- Hub height:

- Total nominal power: 4,600 kW
- Operational
- Onshore wind farm
- Developer: ENEOP
- Source:

Part #3:
- Part: Armamar
- City: Armamar
- Commissioning:

- 7 turbines: Enercon E82/2000 (power 2 000 kW, diameter 82 m)
- Hub height:

- Total nominal power: 14,000 kW
- Operational
- Onshore wind farm
- Developer: ENEOP
- Source:

Part #4:
- Part: Armamar II
- City: Armamar
- Commissioning:

- 5 turbines: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
- Hub height:

- Total nominal power: 11,500 kW
- Operational
- Onshore wind farm
- Developer: ENEOP
- Source:

Part #5:
- Part: Ranhados
- Commissioning:

- 5 turbines: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
- Total nominal power: 11,500 kW
- Operational
- Onshore wind farm
- Source:

Part #6:
- Part: Sendim
- Commissioning:

- 20 turbines: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
- Hub height:

- Total nominal power: 46,000 kW
- Operational
- Onshore wind farm
- Developer: ENEOP
- Source:

Part #7:
- Part: Serra da Nave
- City: Moimenta da Beira, Vila Nova de Paiva
- Commissioning:

- 14 turbines: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
- Hub height:

- Total nominal power: 32,200 kW
- Operational
- Onshore wind farm
- Developer: ENEOP
- Source:

Part #8:
- Part: Serra da Nave
- City: Moimenta da Beira, Vila Nova de Paiva
- Commissioning:

- 5 turbines: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
- Hub height:

- Total nominal power: 11,500 kW
- Operational
- Onshore wind farm
- Developer: ENEOP
- Source:

Part #9:
- Part: Serra de Chavães
- City: Vila Nova de Paiva
- Commissioning:

- 15 turbines: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
- Hub height:

- Total nominal power: 34,500 kW
- Operational
- Onshore wind farm
- Developer: ENEOP
- Source:

Part #10:
- Part: Serra de Sampaio
- City: Vila Nova de Paiva
- Commissioning:

- 1 turbine: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
- Hub height:

- Total nominal power: 2,300 kW
- Operational
- Onshore wind farm
- Developer: ENEOP
- Source:

Part #11:
- Part: Serra de Sampaio
- City: Vila Nova de Paiva
- Commissioning:

- 4 turbines: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
- Hub height:

- Total nominal power: 9,200 kW
- Operational
- Onshore wind farm
- Developer: ENEOP
- Source:

Part #12:
- Part: Serra de Sampaio
- City: Vila Nova de Paiva
- Commissioning:

- 5 turbines: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
- Hub height:

- Total nominal power: 11,500 kW
- Operational
- Onshore wind farm
- Developer: ENEOP
- Source:

Part #13:
- Part: Testos II
- Commissioning:

- 22 turbines: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
- Hub height:

- Total nominal power: 50,600 kW
- Operational
- Onshore wind farm
- Developer: ENEOP
- Source:

Localisation
Part #1:
- Part: Armamar
- Latitude: 41° 4' 10.5"
- Longitude: -7° 34' 36.7"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Part: Armamar
- Latitude: 41° 4' 10.5"
- Longitude: -7° 34' 36.7"
- Geodetic system: WGS84
- Precise localization: no
Part #3:
- Part: Armamar
- Latitude: 41° 4' 10.5"
- Longitude: -7° 34' 36.7"
- Geodetic system: WGS84
- Precise localization: no
Part #4:
- Part: Armamar II
- Latitude: 41° 4' 10.5"
- Longitude: -7° 34' 36.7"
- Geodetic system: WGS84
- Precise localization: no
Part #5:
- Part: Ranhados
- Latitude: 41° 4' 10.5"
- Longitude: -7° 34' 36.7"
- Geodetic system: WGS84
- Precise localization: no
Part #6:
- Part: Sendim
- Latitude: 41° 4' 10.5"
- Longitude: -7° 34' 36.7"
- Geodetic system: WGS84
- Precise localization: no
Part #7:
- Part: Serra da Nave
- Latitude: 41° 4' 10.5"
- Longitude: -7° 34' 36.7"
- Geodetic system: WGS84
- Precise localization: no
Part #8:
- Part: Serra da Nave
- Latitude: 41° 4' 10.5"
- Longitude: -7° 34' 36.7"
- Geodetic system: WGS84
- Precise localization: no
Part #9:
- Part: Serra de Chavães
- Latitude: 41° 4' 10.5"
- Longitude: -7° 34' 36.7"
- Geodetic system: WGS84
- Precise localization: no
Part #10:
- Part: Serra de Sampaio
- Latitude: 41° 4' 10.5"
- Longitude: -7° 34' 36.7"
- Geodetic system: WGS84
- Precise localization: no
Part #11:
- Part: Serra de Sampaio
- Latitude: 41° 4' 10.5"
- Longitude: -7° 34' 36.7"
- Geodetic system: WGS84
- Precise localization: no
Part #12:
- Part: Serra de Sampaio
- Latitude: 41° 4' 10.5"
- Longitude: -7° 34' 36.7"
- Geodetic system: WGS84
- Precise localization: no
Part #13:
- Part: Testos II
- Latitude: 41° 4' 10.5"
- Longitude: -7° 34' 36.7"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 0