Generalities
|
|
Details
Part #1:
- Part: Candiba
- City: Guanambi
- Commissioning:
- 6 turbines: GE Energy 1.6-100 (power 1 600 kW, diameter 100 m)
- Total nominal power: 9,600 kW
- Operational
- Onshore wind farm
- Operator: Renova Energia
- Owner:
Part #2:
- Part: Guanambi
- City: Guanambi
- Commissioning:
- 13 turbines: GE Energy 1.6-100 (power 1 600 kW, diameter 100 m)
- Total nominal power: 20,800 kW
- Operational
- Onshore wind farm
- Developer: Mercurius
- Operator: Renova Energia
Part #3:
- Part: Guirapa
- City: Guirapa
- Commissioning:
- 18 turbines: GE Energy 1.6-100 (power 1 600 kW, diameter 100 m)
- Total nominal power: 28,800 kW
- Operational
- Onshore wind farm
- Operator: Renova Energia
Part #4:
- Part: Igaporã
- City: Igaporã
- Commissioning:
- 19 turbines: GE Energy 1.6-100 (power 1 600 kW, diameter 100 m)
- Total nominal power: 30,400 kW
- Operational
- Onshore wind farm
- Developer: Mercurius
- Operator: Renova Energia
Part #5:
- Part: Ilheus
- City: Guanambi
- Commissioning:
- 7 turbines: GE Energy 1.6-100 (power 1 600 kW, diameter 100 m)
- Total nominal power: 11,200 kW
- Operational
- Onshore wind farm
- Developer: Mercurius
- Operator: Renova Energia
- Owner:
Part #6:
- Part: Licinio de Almeida
- City: Guanambi
- Commissioning:
- 15 turbines: GE Energy 1.6-100 (power 1 600 kW, diameter 100 m)
- Total nominal power: 24,000 kW
- Operational
- Onshore wind farm
- Developer: Mercurius
- Operator: Renova Energia
Part #7:
- Part: Nossa Senhora de Conceicao
- City: Igaporã
- Commissioning:
- 18 turbines: GE Energy 1.6-100 (power 1 600 kW, diameter 100 m)
- Total nominal power: 28,800 kW
- Operational
- Onshore wind farm
- Developer: Mercurius
- Operator: Renova Energia
Part #8:
- Part: Pajeu do Vento
- City: Caetité
- Commissioning:
- 16 turbines: GE Energy 1.6-100 (power 1 600 kW, diameter 100 m)
- Total nominal power: 25,600 kW
- Operational
- Onshore wind farm
- Operator: Renova Energia
Part #9:
- Part: Pindai
- City: Guanambi
- Commissioning:
- 15 turbines: GE Energy 1.6-100 (power 1 600 kW, diameter 100 m)
- Total nominal power: 24,000 kW
- Operational
- Onshore wind farm
- Developer: Mercurius
- Operator: Renova Energia
Part #10:
- Part: Planaltina
- City: Caetité
- Commissioning:
- 17 turbines: GE Energy 1.6-100 (power 1 600 kW, diameter 100 m)
- Total nominal power: 27,200 kW
- Operational
- Onshore wind farm
- Operator: Renova Energia
Part #11:
Part #12:
- Part: Serro do Salto
- City: Guanambi
- Commissioning:
- Turbine(s): GE Energy
- Total nominal power: 19,000 kW
- Operational
- Onshore wind farm
- Developer: Mercurius
- Operator: Renova Energia
Localisation
Part #1:
- Part: Candiba
- Latitude: -14° 11' 9.3"
- Longitude: -42° 38' 52.4"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Part: Guanambi
- Latitude: -14° 12' 21.9"
- Longitude: -42° 36' 58.3"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #3:
- Part: Guirapa
- Latitude: -14° 12' 54.2"
- Longitude: -42° 38' 32.3"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #4:
- Part: Igaporã
- Latitude: -13° 51' 39.2"
- Longitude: -42° 39' 26.9"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #5:
- Part: Ilheus
- Latitude: -13° 52' 53.5"
- Longitude: -42° 39' 52.5"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #6:
- Part: Licinio de Almeida
- Latitude: -14° 11' 3"
- Longitude: -42° 39' 19.6"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #7:
- Part: Nossa Senhora de Conceicao
- Latitude: -13° 53' 53.7"
- Longitude: -42° 40' 33.3"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #8:
- Part: Pajeu do Vento
- Latitude: -14° 0' 54.8"
- Longitude: -42° 38' 16.4"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #9:
- Part: Pindai
- Latitude: -14° 12' 41.9"
- Longitude: -42° 39' 34.7"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #10:
- Part: Planaltina
- Latitude: -13° 59' 16.6"
- Longitude: -42° 38' 21.7"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #11:
- Part: Rio Verde
- Latitude: -14° 9' 49.9"
- Longitude: -42° 36' 3.5"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #12:
- Part: Serro do Salto
- Latitude: -14° 9' 26.4"
- Longitude: -42° 38' 10.9"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Pictures
Author: Sylvain Fily - Source: Alpha Wind - License: All right reserved
Picture reference: 14721 - Date: 2021 Author: Sylvain Fily - Source: Alpha Wind - License: All right reserved
Picture reference: 14722 - Date: 2021 Author: Sylvain Fily - Source: Alpha Wind - License: All right reserved
Picture reference: 14723 - Date: 2021 Author: Sylvain Fily - Source: Alpha Wind - License: All right reserved
Picture reference: 14724 - Date: 2021 Author: Sylvain Fily - Source: Alpha Wind - License: All right reserved
Picture reference: 14725 - Date: 2021 Author: Sylvain Fily - Source: Alpha Wind - License: All right reserved
Picture reference: 14726 - Date: 2021
Update for this sheet: 25 April 2024
Complete/correct this sheet: