[Back to previous page]
Generalities
- Wind farm name: Sierra de Bodenaya
- Country: Spain
- County / Zone: Asturias
|
|
Details
- City: Salas
- Commissioning:

- 12 turbines: GE Energy 1.5se (power 1 500 kW, diameter 70.5 m)
- Hub height:

- Total nominal power: 18,000 kW
- Operational
- Onshore wind farm
- Developer: E.ON Climate Renewables
- Operator: RWE
Localisation
Update for this sheet: 21 January 2025
Complete/correct this sheet: