[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: A Lama, Cotobade, Forcarei
- Commissioning:
- 43 turbines: Gamesa G47/660 (power 660 kW, diameter 47 m)
- Total nominal power: 28,380 kW
- Operational
- Onshore wind farm
- Developer: Olivento SL
- Operator: Olivento SL
Part #2:
- City: A Lama, Cotobade, Forcarei
- Commissioning:
- 1 turbine: Gamesa G52/850 (power 850 kW, diameter 52 m)
- Total nominal power: 850 kW
- Operational
- Onshore wind farm
- Developer: Olivento SL
- Operator: Olivento SL
Localisation
Part #1:
- Latitude: 42° 30' 0"
- Longitude: -8° 22' 11.9"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 42° 30' 0"
- Longitude: -8° 22' 11.9"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 0
Complete/correct this sheet: