[Back to previous page]
Generalities
|
|
Details
- City: Los Balbases, Castrojeriz
- Commissioning:
- 26 turbines: Vestas V90/2000 (power 2 000 kW, diameter 90 m)
- Total nominal power: 52,000 kW
- Operational
- Onshore wind farm
- Developer: Vapat
- Operator: Vapat
Localisation
- Latitude: 42° 12' 51.5"
- Longitude: -4° 3' 54.2"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 3 January 2024
Complete/correct this sheet: