[Back to previous page]
Generalities
|
|
Details
- City: Barnard Castle
- Commissioning:
- 2 turbines: (manufacturer name not available)
- Total nominal power: 500 kW
- Operational
- Onshore wind farm
- Developer: GlaxoSmithKline
- Owner:
Localisation
- Latitude: 54° 32' 43"
- Longitude: -1° 55' 25.4"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 4 March 2020
Complete/correct this sheet: