[Back to previous page]
Generalities
|
|
Details
Part #1:
- Part: Neuenwalde
- Commissioning:
- 1 turbine: Repower 5M (power 5 000 kW, diameter 126 m)
- Hub height:
- Total nominal power: 5,000 kW
- Operational
- Onshore wind farm
Part #2:
- Part: Neuenwalde
- Commissioning:
- 1 turbine: Repower 5M (power 5 000 kW, diameter 126 m)
- Hub height:
- Total nominal power: 5,000 kW
- Operational
- Onshore wind farm
- Developer: Alterric
Localisation
Part 1 : no data.
Part 2 : no data.
Update for this sheet: 25 August 2022
Complete/correct this sheet: