[Back to previous page]
Generalities
- Wind farm name: Troia
- Country: Italy
- County / Zone: Puglia
|
|
Details
Part #1:
- City: Troia
- Commissioning:
- 5 turbines: GE Energy 1.5sl (power 1 500 kW, diameter 77 m)
- Total nominal power: 7,500 kW
- Operational
- Onshore wind farm
- Operator: Vento Energia
Part #2:
- City: Troia
- Commissioning:
- 10 turbines: GE Energy 1.5sl (power 1 500 kW, diameter 77 m)
- Total nominal power: 15,000 kW
- Operational
- Onshore wind farm
- Developer: Daneco Windpower
Part #3:
- City: Troia
- Commissioning:
- 18 turbines: Enercon E70/2300 (power 2 300 kW, diameter 71 m)
- Hub height:
- Total nominal power: 41,400 kW
- Operational
- Onshore wind farm
- Developer: Daunia Energia
Part #4:
- City: Troia
- Commissioning:
- 10 turbines: GE Energy 1.5sl (power 1 500 kW, diameter 77 m)
- Total nominal power: 15,000 kW
- Operational
- Onshore wind farm
- Developer: Daneco Windpower
Part #5:
- City: Troia
- Commissioning:
- 5 turbines: Gamesa G114/2500 (power 2 500 kW, diameter 114 m)
- Total nominal power: 12,500 kW
- Operational
- Onshore wind farm
- Operator: E2i Energie Speciali
- Owner:
- Source:
Localisation
Part #1:
- Latitude: 41° 22' 29.4"
- Longitude: 15° 24' 54.4"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 41° 22' 29.4"
- Longitude: 15° 24' 54.4"
- Geodetic system: WGS84
- Precise localization: no
Part #3:
- Latitude: 41° 20' 47.1"
- Longitude: 15° 24' 31.8"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #4:
- Latitude: 41° 22' 29.4"
- Longitude: 15° 24' 54.4"
- Geodetic system: WGS84
- Precise localization: no
Part #5:
- Latitude: 41° 22' 29.4"
- Longitude: 15° 24' 54.4"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 26 September 2024
Complete/correct this sheet: