[Back to previous page]
Generalities
- Wind farm name: Guanting test wind turbine
- Country: China
- County / Zone: Beijing
|
|
Details
- Commissioning:
- 1 turbine: Goldwind GW90/2500 (power 2 500 kW, diameter 90 m)
- Total nominal power: 2,500 kW
- Operational
- Onshore wind farm
Localisation
- Latitude: 40° 19' 19.9"
- Longitude: 115° 37' 29.6"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 0
Complete/correct this sheet: