Generalities
|
|
Details
Part #1:
- Commissioning:
- 9 turbines: Goldwind GW82/1500 (power 1 500 kW, diameter 82.3 m)
- Total nominal power: 13,500 kW
- Operational
- Onshore wind farm
Part #2:
- Commissioning:
- 24 turbines: Goldwind GW82/1500 (power 1 500 kW, diameter 82.3 m)
- Total nominal power: 36,000 kW
- Operational
- Onshore wind farm
Localisation
Part #1:
- Latitude: 42° 16' 27.5"
- Longitude: 111° 19' 2.9"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 42° 16' 27.5"
- Longitude: 111° 19' 2.9"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 30 April 2018