[Back to previous page]
Generalities
- Wind farm name: Northern Wind Site
- Country: USA
- County / Zone: Minnesota
- Other name: Repowering
|
|
Details
- City: Murray
- Commissioning:
- Turbine(s): (manufacturer name not available)
- Total nominal power: 100,000 kW
- Operational
- Onshore wind farm
- Owner:
Localisation
- Part: Repowering
- Latitude: 43° 58' 4.8"
- Longitude: -96° 0' 28.7"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 23 June 2024
Complete/correct this sheet: