Generalities
- Wind farm name: Huadian Caofeidian
- Country: China
- County / Zone: Offshore
|
|
Details
Part #1:
- Part: Phase 1
- Turbine(s): (manufacturer name not available)
- Total nominal power: 100,000 kW
- Approved
- Offshore wind farm
- Developer: Huadian Power
- Owner:
Part #2:
- Part: Phase 2
- Turbine(s): (manufacturer name not available)
- Total nominal power: 100,000 kW
- Approved
- Offshore wind farm
- Developer: Huadian Power
- Owner:
Localisation
Part #1:
- Part: Phase 1
- Latitude: 39° 7' 48"
- Longitude: 118° 38' 24"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Part: Phase 2
- Latitude: 39° 7' 15.6"
- Longitude: 118° 42' 35.9"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 1 July 2024