[Back to previous page]
Generalities
|
|
Details
- City: Butgenbach
- Commissioning:

- 4 turbines: Vestas V80/2000 (power 2 000 kW, diameter 80 m)
- Hub height:

- Total nominal power: 8,000 kW
- Operational
- Onshore wind farm
- Developer: Electrabel
Localisation
Pictures

Author: Wim - License: All right reserved
Picture reference: 2537

Author: Wim - License: All right reserved
Picture reference: 3221

Author: Wim - License: All right reserved
Picture reference: 3222

Author: Wim - License: All right reserved
Picture reference: 3223

Author: Wim - License: All right reserved
Picture reference: 3224

Author: Wim - License: All right reserved
Picture reference: 3225
Update for this sheet: 0
Complete/correct this sheet: