[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Adangarkulam, Sadayaneri
- Commissioning:
- 2 turbines: Neg Micon NM48/750 (power 750 kW, diameter 48.2 m)
- Total nominal power: 1,500 kW
- Operational
- Onshore wind farm
- Operator: James Textiles
- Owner:
Part #2:
- City: Pazhavvor, Panagudi
- Commissioning:
- 3 turbines: Neg Micon NM48/750 (power 750 kW, diameter 48.2 m)
- Total nominal power: 2,250 kW
- Operational
- Onshore wind farm
- Developer: Arvind
- Operator: Arvind
- Owner:
Part #3:
Part #4:
- City: Karungulam, Panakudi, Adangarkulam, Dhanakkarkulam
- Commissioning:
- 4 turbines: Neg Micon NM48/750 (power 750 kW, diameter 48.2 m)
- Total nominal power: 3,000 kW
- Operational
- Onshore wind farm
- Operator: R.K.Textiles
- Owner:
Part #5:
- City: Panagudi, Pazhavoor
- Commissioning:
- 3 turbines: Neg Micon NM48/750 (power 750 kW, diameter 48.2 m)
- Total nominal power: 2,250 kW
- Operational
- Onshore wind farm
- Operator: Arun
- Owner:
Part #6:
- City: Panakudi
- Commissioning:
- 1 turbine: Neg Micon NM48/750 (power 750 kW, diameter 48.2 m)
- Total nominal power: 750 kW
- Operational
- Onshore wind farm
- Operator: Aditya
- Owner:
Part #7:
Part #8:
- City: Pazhavoor, Karungulam
- Commissioning:
- 2 turbines: Neg Micon NM48/750 (power 750 kW, diameter 48.2 m)
- Total nominal power: 1,500 kW
- Operational
- Onshore wind farm
- Developer: Arvind
- Operator: Arvind
- Owner:
Part #9:
- City: Dhanakkarkulam
- Commissioning:
- 4 turbines: Neg Micon NM82/1650 (power 1 650 kW, diameter 82 m)
- Total nominal power: 6,600 kW
- Operational
- Onshore wind farm
- Developer: Arvind
- Operator: Arvind
- Owner:
Part #10:
- City: Vadakkukavalakurchi
- Commissioning:
- 1 turbine: Suzlon S66/1250 (power 1 250 kW, diameter 66 m)
- Total nominal power: 1,250 kW
- Operational
- Onshore wind farm
- Operator: Asian Handlooms
- Owner:
Part #11:
- City: Kavalakurchi
- Commissioning:
- 1 turbine: Suzlon S66/1250 (power 1 250 kW, diameter 66 m)
- Total nominal power: 1,250 kW
- Operational
- Onshore wind farm
- Operator: RK Textiles
- Owner:
Part #12:
- City: Nagercoil
- Turbine(s): (manufacturer name not available)
- Total nominal power: 81,000 kW
- Operational
- Onshore wind farm
- Developer: Orient Green
Part #13:
- City: Nagercoil
- Turbine(s): (manufacturer name not available)
- Total nominal power: 13,000 kW
- Operational
- Onshore wind farm
- Developer: Orient Green
Localisation
Part #1:
- Latitude: 8° 10' 11.9"
- Longitude: 77° 25' 48"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 8° 10' 11.9"
- Longitude: 77° 25' 48"
- Geodetic system: WGS84
- Precise localization: no
Part #3:
- Latitude: 8° 10' 11.9"
- Longitude: 77° 25' 48"
- Geodetic system: WGS84
- Precise localization: no
Part #4:
- Latitude: 8° 10' 11.9"
- Longitude: 77° 25' 48"
- Geodetic system: WGS84
- Precise localization: no
Part #5:
- Latitude: 8° 10' 11.9"
- Longitude: 77° 25' 48"
- Geodetic system: WGS84
- Precise localization: no
Part #6:
- Latitude: 8° 10' 11.9"
- Longitude: 77° 25' 48"
- Geodetic system: WGS84
- Precise localization: no
Part #7:
- Latitude: 8° 10' 11.9"
- Longitude: 77° 25' 48"
- Geodetic system: WGS84
- Precise localization: no
Part #8:
- Latitude: 8° 10' 11.9"
- Longitude: 77° 25' 48"
- Geodetic system: WGS84
- Precise localization: no
Part #9:
- Latitude: 8° 10' 11.9"
- Longitude: 77° 25' 48"
- Geodetic system: WGS84
- Precise localization: no
Part #10:
- Latitude: 8° 10' 11.9"
- Longitude: 77° 25' 48"
- Geodetic system: WGS84
- Precise localization: no
Part #11:
- Latitude: 8° 10' 11.9"
- Longitude: 77° 25' 48"
- Geodetic system: WGS84
- Precise localization: no
Part #12:
- Latitude: 8° 10' 11.9"
- Longitude: 77° 25' 48"
- Geodetic system: WGS84
- Precise localization: no
Part #13:
- Latitude: 8° 10' 11.9"
- Longitude: 77° 25' 48"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 12 June 2024
Complete/correct this sheet: