[Back to previous page]
Generalities
|
|
Details
- City: Arico (Tenerife)
- Commissioning:
- 20 turbines: Made AE-30 (power 330 kW, diameter 30 m)
- Total nominal power: 6,600 kW
- Operational
- Onshore wind farm
- Developer: Parque Eolico Finca de Mogan
Localisation
- Latitude: 28° 10' 40"
- Longitude: -16° 28' 45.8"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 15 July 2021
Complete/correct this sheet: