Part #1:
- City: Parsteinsee
- Commissioning:
- 5 turbines: GE Energy 1.5sl (power 1 500 kW, diameter 77 m)
- Hub height:
- Total nominal power: 7,500 kW
- Operational
- Onshore wind farm
- Developers: Ventotec/MBBF
- Owner:
- Source:
- Source:
- Source:
Part #2:
- City: Parsteinsee
- Commissioning:
- 2 turbines: GE Energy 1.5sl (power 1 500 kW, diameter 77 m)
- Hub height:
- Total nominal power: 3,000 kW
- Operational
- Onshore wind farm
- Developers: Ventotec/MBBF
- Owner:
- Source:
- Source:
- Source:
Part #3:
- City: Parsteinsee
- Commissioning:
- 7 turbines: GE Energy 1.5sl (power 1 500 kW, diameter 77 m)
- Hub height:
- Total nominal power: 10,500 kW
- Operational
- Onshore wind farm
- Developers: Ventotec/MBBF
- Owner:
- Source:
- Source:
- Source:
Part #4:
- City: Parsteinsee, Angermünde
- Commissioning:
- 3 turbines: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
- Hub height:
- Total nominal power: 6,900 kW
- Operational
- Onshore wind farm
- Developer: Plan 8
- Source:
Part #5:
- City: Parsteinsee
- Commissioning:
- 1 turbine: GE Energy 1.5sl (power 1 500 kW, diameter 77 m)
- Hub height:
- Total nominal power: 1,500 kW
- Operational
- Onshore wind farm
- Developers: Ventotec/MBBF
- Owner:
- Source:
- Source:
- Source: