[Back to previous page]
Generalities
- Wind farm name: Binhai New Area Yangjiapo
- Country: China
- County / Zone: Tianjin
|
|
Details
- City: Yangjiabo
- Commissioning:
- Turbine(s): (manufacturer name not available)
- Total nominal power: 50,000 kW
- Operational
- Onshore wind farm
- Operator: LongYuan
- Owner:
Localisation
- Latitude: 39° 18' 33.4"
- Longitude: 117° 56' 39.4"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 5 September 2022
Complete/correct this sheet: