[Back to previous page]
Generalities
- Wind farm name: Finale Ligure
- Country: Italy
- County / Zone: Liguria
|
|
Details
- City: Finale Ligure
- 2 turbines: Vestas V52/850 (power 850 kW, diameter 52 m)
- Total nominal power: 1,700 kW
- Operational
- Onshore wind farm
- Operator: Berengo
Localisation
- Latitude: 44° 10' 12"
- Longitude: 8° 20' 59.9"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 1 September 2015
Complete/correct this sheet: