[Back to previous page]
Generalities
|
|
Details
Part #1:
Part #2:
- City: Herbsleben
- Commissioning:
- 1 turbine: Repower MD77 (power 1 500 kW, diameter 77 m)
- Hub height:
- Total nominal power: 1,500 kW
- Operational
- Onshore wind farm
- Operator: BOREAS
Part #3:
- City: Herbsleben
- Commissioning:
- 1 turbine: Vestas V112/3000 (power 3 000 kW, diameter 112 m)
- Hub height:
- Total nominal power: 3,000 kW
- Operational
- Onshore wind farm
- Developer: BOREAS
- Owner:
- Source:
Part #4:
- City: Herbsleben
- Commissioning:
- 1 turbine: Vestas V90/2000 (power 2 000 kW, diameter 90 m)
- Hub height:
- Total nominal power: 2,000 kW
- Operational
- Onshore wind farm
- Developer: BOREAS
- Source:
Part #5:
- City: Herbsleben
- Commissioning:
- 1 turbine: Vestas V112/3000 (power 3 000 kW, diameter 112 m)
- Hub height:
- Total nominal power: 3,000 kW
- Operational
- Onshore wind farm
- Developer: BOREAS
- Source:
Part #6:
- City: Herbsleben
- Commissioning:
- 1 turbine: Vestas V90/2000 (power 2 000 kW, diameter 90 m)
- Hub height:
- Total nominal power: 2,000 kW
- Operational
- Onshore wind farm
- Developer: BOREAS
- Source:
Part #7:
- City: Herbsleben
- Commissioning:
- 3 turbines: Repower MD77 (power 1 500 kW, diameter 77 m)
- Hub height:
- Total nominal power: 4,500 kW
- Dismantled (2020/09)
- Onshore wind farm
- Developer: BOREAS
- Source:
Part #8:
- City: Herbsleben
- Commissioning:
- 1 turbine: Vestas V126/3300 (power 3 300 kW, diameter 126 m)
- Hub height:
- Total nominal power: 3,300 kW
- Operational
- Onshore wind farm
- Developer: BOREAS
- Source:
Part #9:
- City: Herbsleben
- Commissioning:
- 1 turbine: Vestas V150/4000-4200 (power 4 000 kW, diameter 150 m)
- Hub height:
- Total nominal power: 4,200 kW (uprated turbine)
- Operational
- Onshore wind farm
- Owner:
Part #10:
- City: Herbsleben
- Commissioning:
- 1 turbine: Vestas V150/4000-4200 (power 4 000 kW, diameter 150 m)
- Hub height:
- Total nominal power: 4,200 kW (uprated turbine)
- Operational
- Onshore wind farm
Part #11:
- City: Herbsleben
- Commissioning:
- 1 turbine: Vestas V150/4000-4200 (power 4 000 kW, diameter 150 m)
- Hub height:
- Total nominal power: 4,200 kW (uprated turbine)
- Operational
- Onshore wind farm
Localisation
Part #1:
- Latitude: 51° 5' 59"
- Longitude: 10° 49' 8.2"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 51° 5' 46.5"
- Longitude: 10° 49' 43.6"
- Geodetic system: WGS84
- Precise localization: no
Part #3:
- Latitude: 51° 6' 8"
- Longitude: 10° 49' 19.4"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #4:
- Latitude: 51° 6' 8"
- Longitude: 10° 49' 19.4"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #5:
- Latitude: 51° 6' 8"
- Longitude: 10° 49' 19.4"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #6:
- Latitude: 51° 6' 8"
- Longitude: 10° 49' 19.4"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #7:
- Latitude: 51° 5' 53.9"
- Longitude: 10° 49' 26.7"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #8:
- Latitude: 51° 6' 8"
- Longitude: 10° 49' 19.4"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #9:
- Latitude: 51° 6' 2.4"
- Longitude: 10° 49' 28.8"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #10:
- Latitude: 51° 5' 47.9"
- Longitude: 10° 49' 23.6"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #11:
- Latitude: 51° 5' 58.7"
- Longitude: 10° 48' 56"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 27 October 2023
Complete/correct this sheet: