[Back to previous page]
Generalities
|
|
Details
- Commissioning:
- 3 turbines: Dewind D4 (power 600 kW, diameter 48 m)
- Hub height:
- Total nominal power: 1,800 kW
- Operational
- Onshore wind farm
- Operator: Green Lines Russians Ltd
Localisation
- Latitude: 50° 25' 29.6"
- Longitude: 12° 59' 41.5"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 21 December 2020
Complete/correct this sheet: