[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Borchen
- Commissioning:
- 1 turbine: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
- Hub height:
- Total nominal power: 2,300 kW
- Operational
- Onshore wind farm
Part #2:
- City: Borchen
- Commissioning:
- 4 turbines: Vestas V80/2000 (power 2 000 kW, diameter 80 m)
- Hub height:
- Total nominal power: 8,000 kW
- Operational
- Onshore wind farm
Part #3:
- City: Borchen
- Commissioning:
- 3 turbines: Enercon E66/1800 (power 1 800 kW, diameter 66 m)
- Hub height:
- Total nominal power: 5,400 kW
- Operational
- Onshore wind farm
Part #4:
- City: Borchen
- Commissioning:
- 5 turbines: Nordex N62/1300 (power 1 300 kW, diameter 62 m)
- Hub height:
- Total nominal power: 6,500 kW
- Operational
- Onshore wind farm
Part #5:
- City: Borchen
- Commissioning:
- 1 turbine: Nordex N29/250 (power 250 kW, diameter 29 m)
- Total nominal power: 250 kW
- Operational
- Onshore wind farm
Part #6:
- City: Borchen
- Commissioning:
- 1 turbine: Enercon E48/800 (power 800 kW, diameter 48 m)
- Hub height:
- Total nominal power: 800 kW
- Operational
- Onshore wind farm
- Operator: Brockmann Wind GmbH
Part #7:
- City: Borchen
- Commissioning:
- 1 turbine: Enercon
- Hub height:
- Total nominal power: 2,350 kW
- Operational
- Onshore wind farm
- Operator: Brockmann Wind GmbH
Part #8:
- City: Borchen
- Commissioning:
- 2 turbines: Enercon E70/2000 (power 2 000 kW, diameter 70 m)
- Hub height:
- Total nominal power: 4,000 kW
- Operational
- Onshore wind farm
- Operator: Brockmann Wind GmbH
Part #9:
- City: Borchen
- Commissioning:
- 1 turbine: Micon M1500-600 (power 600 kW, diameter 43 m)
- Hub height:
- Total nominal power: 600 kW
- Operational
- Onshore wind farm
- Operator: Brockmann Wind GmbH
Part #10:
- City: Borchen
- Commissioning:
- 1 turbine: Neg Micon NM72c/1500 (power 1 500 kW, diameter 72 m)
- Hub height:
- Total nominal power: 1,500 kW
- Operational
- Onshore wind farm
Part #11:
- City: Borchen
- Commissioning:
- 4 turbines: Siemens-Gamesa SWT-DD-142 (power 4 100 kW, diameter 142 m)
- Hub height:
- Total nominal power: 16,400 kW
- Operational
- Onshore wind farm
Part #12:
- City: Borchen
- Commissioning:
- 2 turbines: (manufacturer name not available)
- Total nominal power: 12,000 kW
- Operational
- Onshore wind farm
Part #13:
- City: Borchen
- Commissioning:
- 1 turbine: (manufacturer name not available)
- Total nominal power: 5,560 kW
- Operational
- Onshore wind farm
- Operator: Westfalen Wind
Part #14:
- City: Borchen
- Commissioning:
- 1 turbine: (manufacturer name not available)
- Total nominal power: 4,200 kW
- Operational
- Onshore wind farm
Part #15:
- City: Borchen
- Commissioning:
- 1 turbine: (manufacturer name not available)
- Total nominal power: 5,700 kW
- Operational
- Onshore wind farm
Part #16:
- City: Borchen
- Commissioning:
- 1 turbine: (manufacturer name not available)
- Total nominal power: 4,000 kW
- Operational
- Onshore wind farm
- Operator: Kampmeier Windenergie GmbH
Localisation
Part #1:
- Latitude: 51° 39' 54.8"
- Longitude: 8° 51' 16.1"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 51° 39' 4.5"
- Longitude: 8° 43' 44.6"
- Geodetic system: WGS84
- Precise localization: no
Part #3:
- Latitude: 51° 40' 4.1"
- Longitude: 8° 43' 22.7"
- Geodetic system: WGS84
- Precise localization: no
Part #4:
- Latitude: 51° 40' 4.1"
- Longitude: 8° 43' 22.7"
- Geodetic system: WGS84
- Precise localization: no
Part #5:
- Latitude: 51° 40' 4.1"
- Longitude: 8° 43' 22.7"
- Geodetic system: WGS84
- Precise localization: no
Part #6:
- Latitude: 51° 40' 56.5"
- Longitude: 8° 48' 49.3"
- Geodetic system: WGS84
- Precise localization: no
Part #7:
- Latitude: 51° 39' 47.9"
- Longitude: 8° 51' 25.2"
- Geodetic system: WGS84
- Precise localization: no
Part #8:
- Latitude: 51° 40' 8.9"
- Longitude: 8° 50' 49.9"
- Geodetic system: WGS84
- Precise localization: no
Part #9:
- Latitude: 51° 40' 58.1"
- Longitude: 8° 49' 6.7"
- Geodetic system: WGS84
- Precise localization: no
Part #10:
- Latitude: 51° 40' 51.4"
- Longitude: 8° 49' 1.1"
- Geodetic system: WGS84
- Precise localization: no
Part #11:
- Latitude: 51° 38' 46.3"
- Longitude: 8° 46' 12"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #12:
- Latitude: 51° 40' 4.1"
- Longitude: 8° 43' 22.7"
- Geodetic system: WGS84
- Precise localization: no
Part #13:
- Latitude: 51° 40' 4.1"
- Longitude: 8° 43' 22.7"
- Geodetic system: WGS84
- Precise localization: no
Part #14:
- Latitude: 51° 40' 4.1"
- Longitude: 8° 43' 22.7"
- Geodetic system: WGS84
- Precise localization: no
Part #15:
- Latitude: 51° 40' 4.1"
- Longitude: 8° 43' 22.7"
- Geodetic system: WGS84
- Precise localization: no
Part #16:
- Latitude: 51° 40' 4.1"
- Longitude: 8° 43' 22.7"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 0
Complete/correct this sheet: