Generalities
|
|
Details
- City: Attendorn
- Commissioning:
- 1 turbine: Enercon E40/500 (power 500 kW, diameter 40 m)
- Hub height:
- Total nominal power: 500 kW
- Operational
- Onshore wind farm
- Developer: reenergys
Localisation
- Latitude: 51° 4' 44.2"
- Longitude: 7° 50' 41.2"
- Geodetic system: WGS84
- Precise localization: no