[Back to previous page]
Generalities
- Wind farm name: Milford Wind Corridor - Phase I (GE Energy)
- Country: USA
- County / Zone: Utah
|
|
Details
- City: Beaver
- Commissioning:

- 39 turbines: GE Energy 1.5sle (power 1 500 kW, diameter 77 m)
- Hub height:

- Total nominal power: 58,500 kW
- Operational
- Onshore wind farm
- Developer: First Wind
Localisation
Update for this sheet: 0
Complete/correct this sheet: