[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Ardales, Carratraca
- Commissioning:
- 6 turbines: Gamesa G87/2000 (power 2 000 kW, diameter 87 m)
- Total nominal power: 12,000 kW
- Operational
- Onshore wind farm
- Developer: Aresa
- Operator: Aresa
Part #2:
- City: Ardales, Carratraca
- 1 turbine: Gamesa G52/850 (power 850 kW, diameter 52 m)
- Total nominal power: 850 kW
- Operational
- Onshore wind farm
- Developer: Aresa
- Operator: Aresa
Localisation
Part #1:
Part #2:
Update for this sheet: 6 May 2024
Complete/correct this sheet: