Aalborg | 750 | 1 | Operational | ||||||
Abild | 600 | 1 | Operational | ||||||
Abildgard (Rebild) | 1,800 | 3 | Operational | ||||||
Abildgard (Thisted) | 600 | 1 | Operational | ||||||
Abildgard (Thisted) | 600 | 1 | Operational | ||||||
Abildgard (Thisted) | 500 | 1 | Operational | ||||||
Abildgard (Thisted) | 600 | 1 | Operational | ||||||
Abol | 180 | 1 | Operational | ||||||
Abol | 180 | 1 | Operational | ||||||
Abol | 600 | 1 | Operational | ||||||
Abterp | 1,320 | 2 | Operational | ||||||
Aby | 600 | 1 | Operational | ||||||
Adbol | 225 | 1 | Operational | ||||||
Adsbol | 150 | 1 | Dismantled | ||||||
Adum | 225 | 1 | Dismantled | ||||||
Adum | 225 | 1 | Dismantled | ||||||
Adum-Kirkeby | 24,000 | 8 | Operational | ||||||
Aeble | 750 | 1 | Operational | ||||||
Aflandshage | 250,000 | Planned | |||||||
Agard HGD Gorlev | 3,200 | 1 | Operational | ||||||
Agdrup | 150 | 1 | Dismantled | ||||||
Agernæs | 600 | 1 | Operational | ||||||
Agerskov | 600 | 1 | Operational | ||||||
Agerup | 600 | 1 | Operational | ||||||
Ajstrup | 3,600 | 6 | Operational | ||||||
Ajstrup | 600 | 1 | Operational | ||||||
Ajstrup | 600 | 1 | Operational | ||||||
Ajstrup | 500 | 1 | Operational | ||||||
Ajstrup | 400 | 1 | Dismantled | ||||||
Ajstrup | 600 | 1 | Operational | ||||||
Ajstrup | 1,800 | 3 | Operational | ||||||
Ajstrup | 1,800 | 3 | Operational | ||||||
Ajstrup (Vesthimmerland) | 750 | 1 | Operational | ||||||
Ajstrup (Vesthimmerland) | 225 | 1 | Operational | ||||||
Aker | 6,000 | 3 | Operational | ||||||
Aker | 6,500 | 5 | Operational | ||||||
Aker | 450 | 2 | Dismantled | ||||||
Aker | 1,575 | 7 | Dismantled | ||||||
Alboge | 150 | 1 | Operational | ||||||
Alboge | 150 | 1 | Operational | ||||||
Albæk (Frederikshavn) | 450 | 2 | Dismantled | ||||||
Albæk (Frederikshavn) | 300 | 2 | Dismantled | ||||||
Albæk (Frederikshavn) | 150 | 1 | Dismantled | ||||||
Albæk (Frederikshavn) | 150 | 1 | Dismantled | ||||||
Albæk (Frederikshavn) | 225 | 1 | Dismantled | ||||||
Albæk (Frederikshavn) | 750 | 1 | Operational | ||||||
Albæk (Randers) | 3,000 | 5 | Operational | ||||||
Albæk Hgd. | 500 | 2 | Dismantled | ||||||
Alkjærsig-Dejbjerg | 450 | 2 | Dismantled | ||||||
Allerslev | 150 | 1 | Operational | ||||||
All... | 150 | 1 | Operational | ||||||
All... | 225 | 1 | Dismantled | ||||||
All... | 225 | 1 | Dismantled | ||||||
All... | 600 | 1 | Operational | ||||||
All... | 600 | 1 | Operational | ||||||
Alm... | 150 | 1 | Dismantled | ||||||
Als... | 1,500 | 2 | Operational | ||||||
Als... | 750 | 1 | Operational | ||||||
Als... | 150 | 1 | Dismantled | ||||||
Als... | 750 | 1 | Operational | ||||||
Als... | 1,500 | 2 | Operational | ||||||
Als... | 150 | 1 | Dismantled | ||||||
Als... | 600 | 1 | Operational | ||||||
Als... | 600 | 1 | Operational | ||||||
Als... | 4,500 | 6 | Operational | ||||||
Als... | 900 | 1 | Operational | ||||||
Amm... | 1,200 | 2 | Operational | ||||||
Amt... | 750 | 1 | Operational | ||||||
Amt... | 750 | 1 | Operational | ||||||
Amt... | 750 | 1 | Operational | ||||||
Amt... | 450 | 2 | Dismantled | ||||||
Amt... | 225 | 1 | Dismantled | ||||||
And... | 750 | 1 | Operational | ||||||
And... | 660 | 1 | Operational | ||||||
And... | 660 | 1 | Operational | ||||||
And... | 1,500 | 2 | Operational | ||||||
And... | 600 | 1 | Dismantled | ||||||
Anh... | 399,600 | 111 | Operational | ||||||
Arb... | 18,000 | 6 | Operational | ||||||
Arl... | 1,500 | 3 | Operational | ||||||
Arn... | 600 | 1 | Operational | ||||||
Arn... | 150 | 1 | Operational | ||||||
Arn... | 150 | 1 | Operational | ||||||
Arr... | 1,300 | 1 | Operational | ||||||
Arr... | 750 | 1 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Arr... | 660 | 1 | Operational | ||||||
Arr... | 660 | 1 | Operational | ||||||
Arr... | 2,400 | 4 | Operational | ||||||
Arr... | 6,600 | 11 | Operational | ||||||
Arr... | 250 | 1 | Operational | ||||||
Ars... | 600 | 3 | Operational | ||||||
Ars... | 400 | 2 | Operational | ||||||
Aru... | 225 | 1 | Operational | ||||||
Asa... | 225 | 1 | Operational | ||||||
Asa... | 200 | 1 | Dismantled | ||||||
Asa... | 10,350 | 3 | Operational | ||||||
Asb... | 600 | 1 | Operational | ||||||
Asd... | 2,500 | 5 | Operational | ||||||
Asd... | 2,250 | 3 | Operational | ||||||
Ask... | 900 | 1 | Operational | ||||||
Ask... | 1,800 | 2 | Operational | ||||||
Ask... | 1,200 | 2 | Operational | ||||||
Ask... | 3,600 | 1 | Operational | ||||||
Asm... | 400 | 2 | Dismantled | ||||||
Asm... | 600 | 3 | Operational | ||||||
Asn... | 600 | 3 | Dismantled | ||||||
Ass... | 1,980 | 3 | Operational | ||||||
Ass... | 750 | 1 | Operational | ||||||
Ass... | 1,300 | 1 | Operational | ||||||
Ass... | 1,800 | 2 | Operational | ||||||
Ass... | 225 | 1 | Dismantled | ||||||
Ast... | 300 | 2 | Dismantled | ||||||
Ast... | 750 | 1 | Operational | ||||||
Ast... | 300 | 2 | Dismantled | ||||||
Ast... | 500 | 2 | Operational | ||||||
Ast... | 250 | 1 | Dismantled | ||||||
Ast... | 600 | 1 | Dismantled | ||||||
Ast... | 12,000 | 4 | Operational | ||||||
Ast... | 600 | 1 | Operational | ||||||
Ast... | 750 | 1 | Operational | ||||||
Ast... | 300 | 2 | Dismantled | ||||||
Ast... | 130 | 1 | Dismantled | ||||||
Ast... | 660 | 1 | Operational | ||||||
Ast... | 2,640 | 4 | Operational | ||||||
Att... | 225 | 1 | Operational | ||||||
Att... | 320 | 2 | Operational | ||||||
Aul... | 660 | 1 | Operational | ||||||
Aul... | 660 | 1 | Operational | ||||||
Aul... | 1,000 | 1 | Operational | ||||||
Aul... | 2,000 | 2 | Operational | ||||||
Aul... | 2,000 | 2 | Operational | ||||||
Aul... | 1,000 | 1 | Operational | ||||||
Aun... | 150 | 1 | Dismantled | ||||||
Ave... | 900 | 3 | Dismantled | ||||||
Ave... | 1,980 | 3 | Operational | ||||||
Ave... | 2,700 | 9 | Dismantled | ||||||
Ave... | 10,800 | 3 | Operational | ||||||
Ave... | 225 | 1 | Operational | ||||||
Ave... | 160 | 1 | Dismantled | ||||||
Ave... | 160 | 1 | Dismantled | ||||||
Avn... | 2,000 | 2 | Operational | ||||||
Bag... | 600 | 1 | Operational | ||||||
Baj... | 15,000 | 5 | Operational | ||||||
Bak... | 3,200 | 1 | Operational | ||||||
Bal... | 900 | 1 | Operational | ||||||
Bal... | 3,600 | 4 | Operational | ||||||
Bal... | 1,600 | 2 | Operational | ||||||
Bal... | 800 | 1 | Operational | ||||||
Bal... | 750 | 1 | Operational | ||||||
Bal... | 600 | 1 | Operational | ||||||
Bal... | 600 | 1 | Operational | ||||||
Bal... | 600 | 1 | Operational | ||||||
Ban... | 7,200 | 2 | Operational | ||||||
Bar... | 300 | 1 | Operational | ||||||
Bar... | 750 | 1 | Operational | ||||||
Bar... | 750 | 1 | Operational | ||||||
Bar... | 200 | 1 | Dismantled | ||||||
Bar... | 300 | 1 | Operational | ||||||
Bar... | 900 | 3 | Operational | ||||||
Bar... | 300 | 1 | Operational | ||||||
Bar... | 150 | 1 | Operational | ||||||
Bar... | 660 | 1 | Operational | ||||||
Bar... | 300 | 1 | Dismantled | ||||||
Bat... | 225 | 1 | Dismantled | ||||||
Bat... | 225 | 1 | Dismantled | ||||||
Bed... | 750 | 1 | Operational | ||||||
Bed... | 300 | 1 | Operational | ||||||
Bed... | 250 | 1 | Dismantled | ||||||
Bed... | 225 | 1 | Operational | ||||||
Bee... | 500 | 1 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Bej... | 4,000 | 10 | Operational | ||||||
Ben... | 150 | 1 | Dismantled | ||||||
Ben... | 1,500 | 2 | Operational | ||||||
Ben... | 1,500 | 2 | Operational | ||||||
Bie... | 250 | 1 | Operational | ||||||
Bil... | 1,350 | 3 | Operational | ||||||
Bil... | 150 | 1 | Operational | ||||||
Bil... | 150 | 1 | Dismantled | ||||||
Bil... | 2,700 | 3 | Operational | ||||||
Bin... | 1,500 | 2 | Operational | ||||||
Bin... | 600 | 1 | Operational | ||||||
Bin... | 1,200 | 2 | Operational | ||||||
Bin... | 1,800 | 3 | Operational | ||||||
Bin... | 600 | 1 | Operational | ||||||
Bir... | 750 | 1 | Operational | ||||||
Bir... | 750 | 1 | Operational | ||||||
Bir... | 750 | 1 | Operational | ||||||
Bir... | 1,200 | 2 | Dismantled | ||||||
Bir... | 3,000 | 3 | Operational | ||||||
Bir... | 1,320 | 2 | Operational | ||||||
Bis... | 1,500 | 2 | Operational | ||||||
Bis... | 150 | 1 | Dismantled | ||||||
Bis... | 150 | 1 | Dismantled | ||||||
Bis... | 600 | 1 | Operational | ||||||
Bje... | 4,600 | 2 | Operational | ||||||
Bje... | 600 | 1 | Operational | ||||||
Bje... | 1,350 | 3 | Operational | ||||||
Bje... | 660 | 1 | Operational | ||||||
Bje... | 660 | 1 | Operational | ||||||
Bje... | 660 | 1 | Operational | ||||||
Bje... | 1,800 | 2 | Operational | ||||||
Bje... | 900 | 1 | Operational | ||||||
Bje... | 1,600 | 2 | Operational | ||||||
Bje... | 600 | 1 | Operational | ||||||
Bje... | 500 | 1 | Operational | ||||||
Bje... | 10,000 | 5 | Dismantled | ||||||
Bje... | 130 | 1 | Dismantled | ||||||
Bje... | 600 | 4 | Dismantled | ||||||
Bje... | 130 | 1 | Dismantled | ||||||
Bje... | 2,300 | 1 | Operational | ||||||
Bje... | 2,300 | 1 | Operational | ||||||
Bje... | 1,500 | 2 | Operational | ||||||
Bje... | 250 | 1 | Dismantled | ||||||
Bje... | 200 | 1 | Dismantled | ||||||
Bje... | 1,500 | 2 | Operational | ||||||
Bjo... | 250 | 1 | Operational | ||||||
Bjo... | 3,000 | 4 | Operational | ||||||
Bjo... | 150 | 1 | Operational | ||||||
Bjæ... | 200 | 1 | Dismantled | ||||||
Bla... | 160 | 1 | Dismantled | ||||||
Ble... | 750 | 1 | Operational | ||||||
Ble... | 1,500 | 2 | Operational | ||||||
Ble... | 1,500 | 2 | Operational | ||||||
Bli... | 2,000 | 2 | Operational | ||||||
Bli... | 3,000 | 3 | Operational | ||||||
Blæ... | 2,250 | 3 | Operational | ||||||
Boc... | 1,102,500 | Planned | |||||||
Bod... | 150 | 1 | Dismantled | ||||||
Bod... | 675 | 3 | Operational | ||||||
Bod... | 2,700 | 3 | Operational | ||||||
Bod... | 900 | 1 | Operational | ||||||
Bod... | 900 | 1 | Operational | ||||||
Bod... | 900 | 1 | Operational | ||||||
Boe... | 600 | 1 | Operational | ||||||
Boe... | 500 | 1 | Operational | ||||||
Boe... | 150 | 1 | Operational | ||||||
Boe... | 130 | 1 | Dismantled | ||||||
Bog... | 225 | 1 | Operational | ||||||
Bog... | 180 | 1 | Dismantled | ||||||
Bog... | 150 | 1 | Dismantled | ||||||
Bog... | 150 | 1 | Dismantled | ||||||
Bog... | 150 | 1 | Dismantled | ||||||
Bog... | 600 | 1 | Operational | ||||||
Bog... | 600 | 1 | Operational | ||||||
Bog... | 1,800 | 3 | Operational | ||||||
Bog... | 600 | 1 | Operational | ||||||
Boj... | 225 | 1 | Dismantled | ||||||
Boj... | 150 | 1 | Operational | ||||||
Bol... | 300 | 2 | Dismantled | ||||||
Bol... | 150 | 1 | Dismantled | ||||||
Bol... | 750 | 1 | Operational | ||||||
Bol... | 750 | 1 | Operational | ||||||
Bon... | 2,400 | 5 | Operational | ||||||
Bon... | 600 | 4 | Dismantled | ||||||
Bon... | 4,200 | 7 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Bon... | 150 | 1 | Dismantled | ||||||
Bor... | 2,000 | 2 | Operational | ||||||
Bor... | 3,000 | 4 | Operational | ||||||
Bor... | 14,000 | 7 | Operational | ||||||
Bor... | 16,000 | 8 | Operational | ||||||
Bor... | 600 | 1 | Operational | ||||||
Bor... | 600 | 1 | Operational | ||||||
Bor... | 600 | 1 | Operational | ||||||
Bor... | 250 | 1 | Operational | ||||||
Bor... | 160 | 1 | Dismantled | ||||||
Bor... | 160 | 1 | Dismantled | ||||||
Bor... | 750 | 1 | Operational | ||||||
Bor... | 150 | 1 | Dismantled | ||||||
Bor... | 150 | 1 | Dismantled | ||||||
Bor... | 2,400 | 4 | Operational | ||||||
Bor... | 3,000 | 1 | Operational | ||||||
Bor... | 1,200 | 2 | Operational | ||||||
Bor... | 100,000 | Planned | |||||||
Bor... | 1,500,000 | Planned | |||||||
Bor... | 1,500,000 | Planned | |||||||
Bor... | 660 | 1 | Operational | ||||||
Bor... | 2,640 | 4 | Operational | ||||||
Bor... | 1,000 | 4 | Dismantled | ||||||
Bor... | 450 | 2 | Dismantled | ||||||
Bor... | 1,000 | 1 | Operational | ||||||
Bos... | 200 | 1 | Operational | ||||||
Bos... | 2,250 | 3 | Operational | ||||||
Bos... | 900 | 1 | Operational | ||||||
Bos... | 1,800 | 2 | Operational | ||||||
Bos... | 225 | 1 | Dismantled | ||||||
Bos... | 225 | 1 | Dismantled | ||||||
Bou... | 2,250 | 3 | Operational | ||||||
Bou... | 150 | 1 | Dismantled | ||||||
Bov... | 2,000 | 1 | Dismantled | ||||||
Bov... | 180 | 3 | Dismantled | ||||||
Bov... | 225 | 1 | Dismantled | ||||||
Bov... | 2,300 | 1 | Dismantled | ||||||
Bov... | 3,300 | 1 | Operational | ||||||
Bov... | 450 | 2 | Dismantled | ||||||
Bov... | 225 | 1 | Dismantled | ||||||
Bov... | 225 | 1 | Dismantled | ||||||
Bov... | 260 | 2 | Dismantled | ||||||
Bov... | 1,500 | 1 | Dismantled | ||||||
Bov... | 10,800 | 3 | Operational | ||||||
Bov... | 3,000 | 1 | Dismantled | ||||||
Bov... | 2,000 | 1 | Dismantled | ||||||
Bov... | 1,800 | 1 | Dismantled | ||||||
Bov... | 3,000 | 1 | Dismantled | ||||||
Bov... | 3,000 | 1 | Dismantled | ||||||
Bov... | 2,000 | 1 | Dismantled | ||||||
Bov... | 4,300 | 1 | Operational | ||||||
Bov... | 2,300 | 1 | Dismantled | ||||||
Bov... | 600 | 1 | Operational | ||||||
Bov... | 250 | 1 | Operational | ||||||
Bov... | 300 | 2 | Operational | ||||||
Bov... | 250 | 1 | Operational | ||||||
Bov... | 250 | 1 | Operational | ||||||
Bov... | 900 | 2 | Operational | ||||||
Bov... | 400 | 2 | Dismantled | ||||||
Bra... | 150 | 1 | Dismantled | ||||||
Bra... | 3,000 | 1 | Dismantled | ||||||
Bra... | 10,000 | 1 | Operational | ||||||
Bra... | 150 | 1 | Dismantled | ||||||
Bra... | 1,300 | 1 | Operational | ||||||
Bra... | 1,300 | 1 | Operational | ||||||
Bra... | 2,600 | 2 | Operational | ||||||
Bra... | 400 | 1 | Operational | ||||||
Bra... | 400 | 1 | Dismantled | ||||||
Bra... | 600 | 1 | Operational | ||||||
Bra... | 150 | 1 | Dismantled | ||||||
Bre... | 600 | 1 | Operational | ||||||
Bre... | 600 | 1 | Operational | ||||||
Bre... | 600 | 1 | Operational | ||||||
Bre... | 150 | 1 | Dismantled | ||||||
Bre... | 150 | 1 | Dismantled | ||||||
Bre... | 400 | 1 | Dismantled | ||||||
Bre... | 500 | 2 | Dismantled | ||||||
Bre... | 150 | 1 | Operational | ||||||
Bre... | 2,000 | 1 | Operational | ||||||
Bre... | 3,300 | 1 | Operational | ||||||
Bre... | 660 | 1 | Operational | ||||||
Bre... | 660 | 1 | Operational | ||||||
Bre... | 660 | 1 | Operational | ||||||
Bre... | 1,980 | 3 | Operational | ||||||
Bre... | 300 | 3 | Dismantled | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Bre... | 100 | 1 | Dismantled | ||||||
Bre... | 7,200 | 4 | Operational | ||||||
Bri... | 660 | 1 | Operational | ||||||
Bri... | 200 | 1 | Operational | ||||||
Bro... | 900 | 1 | Operational | ||||||
Bro... | 5,500 | 1 | Operational | ||||||
Bro... | 10,500 | 7 | Operational | ||||||
Bro... | 300 | 2 | Dismantled | ||||||
Bro... | 600 | 3 | Dismantled | ||||||
Bro... | 10,350 | 3 | Operational | ||||||
Bro... | 400 | 1 | Operational | ||||||
Bro... | 1,000 | 1 | Operational | ||||||
Bro... | 4,000 | 4 | Operational | ||||||
Bro... | 1,000 | 1 | Operational | ||||||
Bro... | 600 | 1 | Operational | ||||||
Bro... | 1,000 | 2 | Operational | ||||||
Bro... | 150 | 1 | Operational | ||||||
Bro... | 3,750 | 5 | Operational | ||||||
Bro... | 1,500 | 2 | Operational | ||||||
Bro... | 3,200 | 8 | Operational | ||||||
Bro... | 750 | 1 | Operational | ||||||
Bro... | 500 | 1 | Operational | ||||||
Bro... | 7,200 | 2 | Operational | ||||||
Bro... | 1,200 | 2 | Operational | ||||||
Bro... | 1,500 | 2 | Operational | ||||||
Bro... | 660 | 1 | Operational | ||||||
Bru... | 2,000 | 2 | Operational | ||||||
Bru... | 300 | 1 | Operational | ||||||
Bru... | 300 | 1 | Operational | ||||||
Bru... | 450 | 2 | Operational | ||||||
Bru... | 3,000 | 3 | Operational | ||||||
Bru... | 600 | 1 | Operational | ||||||
Bru... | 900 | 1 | Operational | ||||||
Bry... | 1,500 | 2 | Operational | ||||||
Bry... | 600 | 1 | Operational | ||||||
Bry... | 150 | 1 | Operational | ||||||
Bry... | 900 | 1 | Operational | ||||||
Bræ... | 900 | 1 | Operational | ||||||
Bræ... | 1,800 | 2 | Operational | ||||||
Bræ... | 660 | 1 | Operational | ||||||
Bub... | 1,200 | 2 | Operational | ||||||
Bub... | 600 | 1 | Operational | ||||||
Buk... | 3,960 | 6 | Operational | ||||||
Bur... | 9,000 | 15 | Operational | ||||||
Bur... | 9,900 | 3 | Operational | ||||||
Bur... | 4,400 | 2 | Operational | ||||||
Bur... | 400 | 2 | Operational | ||||||
Bur... | 15,000 | 5 | Operational | ||||||
Bur... | 150 | 1 | Operational | ||||||
Bus... | 500 | 2 | Operational | ||||||
Byb... | 1,000 | 5 | Operational | ||||||
Byb... | 200 | 1 | Operational | ||||||
Bys... | 300 | 2 | Dismantled | ||||||
Bæk... | 150 | 1 | Dismantled | ||||||
Bæk... | 150 | 1 | Dismantled | ||||||
Bæk... | 150 | 1 | Dismantled | ||||||
Bæk... | 750 | 1 | Operational | ||||||
Bæk... | 2,250 | 3 | Operational | ||||||
Bæk... | 1,800 | 3 | Operational | ||||||
Bæk... | 1,800 | 3 | Operational | ||||||
Bæk... | 18,000 | 5 | Operational | ||||||
Dal... | 150 | 1 | Operational | ||||||
Dal... | 150 | 1 | Operational | ||||||
Dal... | 1,500 | 2 | Operational | ||||||
Dal... | 150 | 1 | Operational | ||||||
Dal... | 1,000 | 2 | Operational | ||||||
Dal... | 150 | 1 | Dismantled | ||||||
Dam... | 200 | 1 | Dismantled | ||||||
Dan... | 1,200 | 2 | Operational | ||||||
Dan... | 600 | 1 | Operational | ||||||
Dan... | 500 | 1 | Operational | ||||||
Dan... | 300 | 1 | Operational | ||||||
Dan... | 600 | 2 | Operational | ||||||
Dan... | 300 | 1 | Operational | ||||||
Dan... | 150 | 1 | Dismantled | ||||||
Dan... | 600 | 2 | Operational | ||||||
Dar... | 600 | 1 | Operational | ||||||
Dau... | 225 | 1 | Dismantled | ||||||
Deb... | 150 | 1 | Dismantled | ||||||
Deb... | 300 | 2 | Dismantled | ||||||
Deb... | 200 | 1 | Dismantled | ||||||
Deg... | 49,500 | 15 | Operational | ||||||
Dej... | 6,075 | 27 | Operational | ||||||
Dej... | 225 | 1 | Dismantled | ||||||
Dej... | 450 | 2 | Dismantled | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Dej... | 225 | 1 | Operational | ||||||
Dej... | 225 | 1 | Dismantled | ||||||
Dej... | 225 | 1 | Operational | ||||||
Dej... | 450 | 2 | Dismantled | ||||||
Dej... | 660 | 1 | Operational | ||||||
Dej... | 600 | 1 | Operational | ||||||
Del... | 3,000 | 1 | Operational | ||||||
Dem... | 1,500 | 2 | Operational | ||||||
Den... | 130 | 1 | Dismantled | ||||||
Den... | 3,500 | 2 | Dismantled | ||||||
Den... | 225 | 1 | Dismantled | ||||||
Den... | 1,750 | 1 | Dismantled | ||||||
Dje... | 225 | 1 | Dismantled | ||||||
Doe... | 1,200 | 2 | Operational | ||||||
Doe... | 300 | 2 | Dismantled | ||||||
Dol... | 200 | 1 | Dismantled | ||||||
Dol... | 130 | 1 | Dismantled | ||||||
Dol... | 130 | 1 | Dismantled | ||||||
Dor... | 200 | 1 | Dismantled | ||||||
Dos... | 660 | 1 | Dismantled | ||||||
Dos... | 1,320 | 2 | Dismantled | ||||||
Dos... | 1,320 | 2 | Dismantled | ||||||
Dos... | 15,000 | 5 | Operational | ||||||
Dos... | 3,200 | 1 | Operational | ||||||
Dov... | 200 | 1 | Dismantled | ||||||
Dov... | 225 | 1 | Dismantled | ||||||
Dov... | 150 | 1 | Dismantled | ||||||
Dov... | 150 | 1 | Dismantled | ||||||
Dra... | 3,000 | 3 | Operational | ||||||
Dra... | 400 | 1 | Dismantled | ||||||
Dre... | 1,500 | 2 | Operational | ||||||
Dre... | 750 | 1 | Operational | ||||||
Dre... | 660 | 1 | Operational | ||||||
Dro... | 400 | 2 | Dismantled | ||||||
Dro... | 3,600 | 4 | Operational | ||||||
Dro... | 850 | 1 | Operational | ||||||
Dro... | 850 | 1 | Operational | ||||||
Dro... | 160 | 1 | Operational | ||||||
Dro... | 150 | 1 | Dismantled | ||||||
Dro... | 150 | 1 | Dismantled | ||||||
Dro... | 150 | 1 | Dismantled | ||||||
Dro... | 6,000 | 2 | Operational | ||||||
Dro... | 3,000 | 1 | Operational | ||||||
Dræ... | 9,200 | 4 | Operational | ||||||
Dun... | 6,000 | 3 | Operational | ||||||
Dur... | 150 | 1 | Dismantled | ||||||
Dyb... | 225 | 1 | Dismantled | ||||||
Dyb... | 300 | 2 | Dismantled | ||||||
Dyb... | 1,350 | 3 | Dismantled | ||||||
Dyb... | 300 | 2 | Dismantled | ||||||
Dær... | 1,320 | 2 | Operational | ||||||
Eco... | 3,600 | 1 | Operational | ||||||
Eg... | 750 | 1 | Operational | ||||||
Ege... | 150 | 1 | Dismantled | ||||||
Ege... | 300 | 1 | Dismantled | ||||||
Ege... | 1,500 | 3 | Operational | ||||||
Ege... | 600 | 1 | Operational | ||||||
Ege... | 1,200 | 2 | Operational | ||||||
Ege... | 600 | 1 | Operational | ||||||
Ege... | 1,200 | 2 | Operational | ||||||
Egg... | 16,000 | 8 | Operational | ||||||
Egg... | 750 | 1 | Operational | ||||||
Egg... | 1,500 | 2 | Operational | ||||||
Egg... | 225 | 1 | Dismantled | ||||||
Egg... | 200 | 1 | Operational | ||||||
Egv... | 800 | 1 | Operational | ||||||
Egv... | 660 | 1 | Operational | ||||||
Ejb... | 600 | 1 | Operational | ||||||
Eje... | 300 | 2 | Dismantled | ||||||
Eje... | 1,700 | 2 | Operational | ||||||
Eje... | 200 | 1 | Dismantled | ||||||
Ejs... | 1,600 | 8 | Dismantled | ||||||
Ejs... | 6,900 | 3 | Operational | ||||||
Ejs... | 1,000 | 5 | Dismantled | ||||||
Ejs... | 2,000 | 1 | Operational | ||||||
Ejs... | 300 | 2 | Operational | ||||||
Ejs... | 150 | 1 | Dismantled | ||||||
Eks... | 850 | 1 | Dismantled | ||||||
Elk... | 600 | 1 | Operational | ||||||
Ell... | 800 | 1 | Operational | ||||||
Ell... | 1,800 | 2 | Operational | ||||||
Ell... | 850 | 1 | Operational | ||||||
Ell... | 150 | 1 | Dismantled | ||||||
Ell... | 150 | 1 | Operational | ||||||
Ell... | 600 | 1 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Ell... | 660 | 1 | Operational | ||||||
Ell... | 1,500 | 2 | Operational | ||||||
Ell... | 1,320 | 2 | Operational | ||||||
Ell... | 600 | 1 | Operational | ||||||
Ell... | 750 | 1 | Operational | ||||||
Els... | 600 | 1 | Operational | ||||||
Els... | 200 | 1 | Dismantled | ||||||
Els... | 600 | 1 | Operational | ||||||
Els... | 600 | 1 | Operational | ||||||
Els... | 150 | 1 | Dismantled | ||||||
Emm... | 2,250 | 3 | Operational | ||||||
Emm... | 2,400 | 4 | Operational | ||||||
Emm... | 750 | 1 | Operational | ||||||
End... | 150 | 1 | Operational | ||||||
End... | 150 | 1 | Operational | ||||||
End... | 150 | 1 | Operational | ||||||
Eng... | 9,900 | 3 | Operational | ||||||
Eng... | 150 | 1 | Operational | ||||||
Eng... | 150 | 1 | Operational | ||||||
Eng... | 750 | 1 | Operational | ||||||
Eng... | 750 | 1 | Operational | ||||||
Eng... | 1,500 | 2 | Operational | ||||||
Enk... | 1,600 | 2 | Operational | ||||||
Enl... | 150 | 1 | Dismantled | ||||||
Enn... | 150 | 1 | Dismantled | ||||||
Env... | 3,000 | 1 | Operational | ||||||
Erk... | 150 | 1 | Dismantled | ||||||
Err... | 500 | 1 | Operational | ||||||
Ers... | 750 | 1 | Operational | ||||||
Esb... | 8,000 | 1 | Operational | ||||||
Esb... | 8,000 | 1 | Operational | ||||||
Esb... | 9,525 | 1 | Dismantled | ||||||
Esb... | 16,800 | 2 | Operational | ||||||
Esk... | 600 | 1 | Operational | ||||||
Esk... | 150 | 1 | Dismantled | ||||||
Est... | 600 | 1 | Operational | ||||||
Est... | 600 | 1 | Operational | ||||||
Est... | 1,500 | 2 | Operational | ||||||
Ett... | 100 | 1 | Dismantled | ||||||
Fab... | 300 | 1 | Operational | ||||||
Fab... | 300 | 1 | Operational | ||||||
Fab... | 225 | 1 | Dismantled | ||||||
Fab... | 225 | 1 | Dismantled | ||||||
Fab... | 225 | 1 | Operational | ||||||
Fab... | 225 | 1 | Operational | ||||||
Fab... | 200 | 1 | Dismantled | ||||||
Fal... | 2,250 | 3 | Operational | ||||||
Fal... | 150 | 1 | Dismantled | ||||||
Fal... | 150 | 1 | Dismantled | ||||||
Fal... | 4,500 | 6 | Operational | ||||||
Fal... | 3,600 | 6 | Operational | ||||||
Fal... | 9,000 | 3 | Operational | ||||||
Fan... | 450 | 2 | Operational | ||||||
Fan... | 150 | 1 | Operational | ||||||
Fan... | 180 | 1 | Dismantled | ||||||
Fan... | 150 | 1 | Dismantled | ||||||
Far... | 550 | 1 | Operational | ||||||
Far... | 550 | 1 | Operational | ||||||
Far... | 550 | 1 | Operational | ||||||
Far... | 225 | 1 | Operational | ||||||
Far... | 660 | 1 | Operational | ||||||
Far... | 1,980 | 3 | Operational | ||||||
Far... | 600 | 1 | Operational | ||||||
Far... | 600 | 1 | Operational | ||||||
Far... | 6,400 | 2 | Operational | ||||||
Far... | 3,200 | 1 | Operational | ||||||
Far... | 660 | 1 | Operational | ||||||
Fas... | 200 | 1 | Dismantled | ||||||
Fas... | 200 | 1 | Dismantled | ||||||
Fas... | 200 | 1 | Dismantled | ||||||
Fel... | 400 | 2 | Dismantled | ||||||
Fel... | 150 | 1 | Dismantled | ||||||
Fel... | 150 | 1 | Dismantled | ||||||
Fel... | 750 | 1 | Operational | ||||||
Fel... | 150 | 1 | Dismantled | ||||||
Fem... | 400,000 | Planned | |||||||
Fem... | 300,000 | Planned | |||||||
Fen... | 150 | 1 | Dismantled | ||||||
Fen... | 150 | 1 | Dismantled | ||||||
Fen... | 150 | 1 | Dismantled | ||||||
Fer... | 150 | 1 | Dismantled | ||||||
Fer... | 150 | 1 | Operational | ||||||
Fer... | 150 | 1 | Dismantled | ||||||
Fil... | 1,300 | 1 | Operational | ||||||
Fil... | 1,300 | 1 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Fil... | 5,200 | 4 | Operational | ||||||
Fil... | 6,900 | 3 | Operational | ||||||
Fja... | 6,500 | 13 | Operational | ||||||
Fja... | 2,250 | 3 | Operational | ||||||
Fja... | 750 | 1 | Operational | ||||||
Fja... | 750 | 1 | Dismantled | ||||||
Fje... | 500 | 2 | Dismantled | ||||||
Fje... | 150 | 1 | Operational | ||||||
Fje... | 450 | 2 | Dismantled | ||||||
Fje... | 450 | 2 | Dismantled | ||||||
Fje... | 900 | 1 | Operational | ||||||
Fje... | 900 | 1 | Operational | ||||||
Fje... | 450 | 3 | Dismantled | ||||||
Fje... | 400 | 1 | Operational | ||||||
Fje... | 400 | 1 | Operational | ||||||
Fje... | 1,200 | 3 | Operational | ||||||
Fla... | 225 | 1 | Dismantled | ||||||
Fla... | 150 | 1 | Dismantled | ||||||
Fla... | 225 | 1 | Dismantled | ||||||
Fla... | 225 | 1 | Dismantled | ||||||
Fla... | 225 | 1 | Dismantled | ||||||
Fla... | 225 | 1 | Dismantled | ||||||
Fla... | 225 | 1 | Dismantled | ||||||
Fla... | 600 | 1 | Dismantled | ||||||
Fla... | 225 | 1 | Dismantled | ||||||
Fle... | 900 | 1 | Operational | ||||||
Fle... | 1,800 | 2 | Operational | ||||||
Fle... | 750 | 1 | Operational | ||||||
Fle... | 750 | 1 | Operational | ||||||
Fle... | 750 | 1 | Operational | ||||||
Fle... | 660 | 1 | Operational | ||||||
Fle... | 1,980 | 3 | Operational | ||||||
Fle... | 2,550 | 3 | Operational | ||||||
Fle... | 225 | 1 | Operational | ||||||
Fle... | 900 | 1 | Operational | ||||||
Fli... | 180 | 1 | Dismantled | ||||||
Flo... | 225 | 1 | Operational | ||||||
Flo... | 150 | 1 | Dismantled | ||||||
Flo... | 225 | 1 | Dismantled | ||||||
Flo... | 150 | 1 | Operational | ||||||
Flo... | 150 | 1 | Dismantled | ||||||
Fly... | 660 | 1 | Operational | ||||||
Fod... | 1,500 | 2 | Operational | ||||||
Fod... | 2,250 | 3 | Operational | ||||||
Fol... | 1,500 | 2 | Operational | ||||||
Fol... | 750 | 1 | Operational | ||||||
Fol... | 750 | 1 | Operational | ||||||
Fol... | 750 | 1 | Operational | ||||||
Fol... | 600 | 3 | Operational | ||||||
For... | 4,200 | 1 | Operational | ||||||
For... | 660 | 1 | Operational | ||||||
For... | 200 | 1 | Dismantled | ||||||
For... | 200 | 1 | Dismantled | ||||||
For... | 160 | 1 | Operational | ||||||
For... | 600 | 1 | Operational | ||||||
For... | 600 | 1 | Operational | ||||||
For... | 550 | 1 | Operational | ||||||
For... | 660 | 1 | Operational | ||||||
For... | 1,320 | 2 | Operational | ||||||
For... | 1,320 | 2 | Operational | ||||||
For... | 550 | 1 | Operational | ||||||
For... | 200 | 1 | Dismantled | ||||||
Fou... | 8,000 | 8 | Operational | ||||||
Fov... | 300 | 1 | Operational | ||||||
Fov... | 150 | 1 | Dismantled | ||||||
Fra... | 1,200 | 2 | Operational | ||||||
Fra... | 1,500 | 2 | Operational | ||||||
Fra... | 660 | 1 | Operational | ||||||
Fra... | 1,320 | 2 | Operational | ||||||
Fre... | 4,000 | 2 | Operational | ||||||
Fre... | 2,000 | 2 | Operational | ||||||
Fre... | 2,250 | 3 | Operational | ||||||
Fre... | 250 | 1 | Dismantled | ||||||
Fre... | 250 | 1 | Dismantled | ||||||
Fre... | 500 | 2 | Dismantled | ||||||
Fre... | 20,700 | 6 | Operational | ||||||
Fre... | 2,300 | 1 | Operational | ||||||
Fre... | 3,000 | 1 | Operational | ||||||
Fre... | 2,300 | 1 | Operational | ||||||
Fre... | 130 | 1 | Dismantled | ||||||
Fre... | 500,000 | Planned | |||||||
Fre... | 2,300 | 1 | Operational | ||||||
Fre... | 3,000 | 1 | Operational | ||||||
Fre... | 2,300 | 1 | Operational | ||||||
Fre... | 72,000 | Approved | |||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Fre... | 1,700 | 2 | Operational | ||||||
Fre... | 150 | 1 | Dismantled | ||||||
Fre... | 150 | 1 | Dismantled | ||||||
Fre... | 150 | 1 | Dismantled | ||||||
Fre... | 150 | 1 | Dismantled | ||||||
Fre... | 1,500,000 | Planned | |||||||
Fro... | 300 | 2 | Dismantled | ||||||
Fro... | 200 | 1 | Dismantled | ||||||
Fro... | 1,300 | 1 | Operational | ||||||
Fro... | 900 | 1 | Operational | ||||||
Fro... | 750 | 1 | Operational | ||||||
Fro... | 2,250 | 3 | Operational | ||||||
Fro... | 750 | 1 | Operational | ||||||
Fro... | 750 | 1 | Operational | ||||||
Fro... | 300 | 2 | Operational | ||||||
Fro... | 1,300 | 1 | Operational | ||||||
Fro... | 1,300 | 1 | Operational | ||||||
Fro... | 1,300 | 1 | Operational | ||||||
Fro... | 1,000 | 2 | Operational | ||||||
Fro... | 225 | 1 | Dismantled | ||||||
Fro... | 225 | 1 | Operational | ||||||
Fro... | 600 | 3 | Operational | ||||||
Fro... | 200 | 1 | Dismantled | ||||||
Fro... | 100 | 1 | Dismantled | ||||||
Fro... | 3,750 | 5 | Operational | ||||||
Fru... | 450 | 1 | Dismantled | ||||||
Fry... | 2,700 | 3 | Operational | ||||||
Fræ... | 160 | 1 | Dismantled | ||||||
Fug... | 660 | 1 | Operational | ||||||
Fug... | 225 | 1 | Operational | ||||||
Ful... | 500 | 2 | Dismantled | ||||||
Fur... | 150 | 1 | Operational | ||||||
Fur... | 150 | 1 | Dismantled | ||||||
Fur... | 150 | 1 | Operational | ||||||
Fur... | 150 | 1 | Operational | ||||||
Fut... | 1,500 | 2 | Operational | ||||||
Fut... | 750 | 1 | Operational | ||||||
Fyr... | 600 | 1 | Operational | ||||||
Fyr... | 600 | 1 | Operational | ||||||
Fyr... | 750 | 1 | Operational | ||||||
Fyr... | 1,200 | 2 | Operational | ||||||
Fæb... | 500 | 1 | Operational | ||||||
Fæb... | 400 | 1 | Dismantled | ||||||
Fæb... | 300 | 1 | Dismantled | ||||||
Fæb... | 150 | 1 | Dismantled | ||||||
Fæb... | 500 | 1 | Operational | ||||||
Fæb... | 150 | 1 | Dismantled | ||||||
Fæb... | 300 | 2 | Dismantled | ||||||
Fær... | 150 | 1 | Dismantled | ||||||
Fæs... | 850 | 1 | Operational | ||||||
Fæs... | 1,320 | 2 | Operational | ||||||
Fæs... | 660 | 1 | Operational | ||||||
Fæs... | 600 | 1 | Operational | ||||||
Fæs... | 150 | 1 | Dismantled | ||||||
Fæs... | 150 | 1 | Dismantled | ||||||
Gab... | 150 | 1 | Dismantled | ||||||
Gab... | 150 | 1 | Dismantled | ||||||
Gal... | 900 | 1 | Operational | ||||||
Gal... | 300 | 2 | Dismantled | ||||||
Gal... | 300 | 2 | Dismantled | ||||||
Gal... | Dismantled | ||||||||
Gal... | Dismantled | ||||||||
Gal... | 260 | 2 | Dismantled | ||||||
Gal... | 750 | 1 | Operational | ||||||
Gal... | 1,980 | 3 | Operational | ||||||
Gal... | 660 | 1 | Operational | ||||||
Gal... | 150 | 1 | Dismantled | ||||||
Gal... | 150 | 1 | Dismantled | ||||||
Gam... | 150 | 1 | Dismantled | ||||||
Gam... | 1,500 | 2 | Operational | ||||||
Gam... | 9,750 | 13 | Operational | ||||||
Gam... | 300 | 1 | Operational | ||||||
Gam... | 3,900 | 3 | Dismantled | ||||||
Gam... | 1,200 | 2 | Operational | ||||||
Gam... | 1,500 | 2 | Operational | ||||||
Gam... | 500 | 2 | Dismantled | ||||||
Gam... | 9,000 | 3 | Operational | ||||||
Gam... | 750 | 1 | Operational | ||||||
Gam... | 600 | 1 | Operational | ||||||
Gam... | 1,700 | 2 | Operational | ||||||
Gan... | 200 | 1 | Dismantled | ||||||
Gan... | 750 | 3 | Dismantled | ||||||
Gan... | 480 | 3 | Dismantled | ||||||
Gar... | 3,750 | 5 | Operational | ||||||
Gar... | 3,600 | 4 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Gar... | 900 | 1 | Operational | ||||||
Gar... | 300 | 2 | Operational | ||||||
Gar... | 900 | 1 | Operational | ||||||
Gar... | 150 | 1 | Dismantled | ||||||
Gar... | 10,350 | 3 | Operational | ||||||
Gar... | 300 | 1 | Operational | ||||||
Gas... | 300 | 1 | Operational | ||||||
Gas... | 300 | 1 | Operational | ||||||
Gas... | 150 | 1 | Dismantled | ||||||
Gas... | 225 | 1 | Dismantled | ||||||
Gas... | 660 | 1 | Operational | ||||||
Gas... | 1,500 | 2 | Operational | ||||||
Gas... | 2,250 | 3 | Operational | ||||||
Gav... | 1,500 | 3 | Operational | ||||||
Ged... | 9,900 | 3 | Operational | ||||||
Ged... | 300 | 1 | Operational | ||||||
Ged... | 200 | 1 | Operational | ||||||
Ged... | 150 | 1 | Operational | ||||||
Ged... | 300 | 2 | Operational | ||||||
Ged... | 150 | 1 | Operational | ||||||
Ged... | 450 | 3 | Dismantled | ||||||
Gej... | 1,320 | 2 | Operational | ||||||
Gej... | 2,640 | 4 | Operational | ||||||
Gej... | 1,320 | 2 | Operational | ||||||
Gej... | 660 | 1 | Operational | ||||||
Gej... | 1,320 | 2 | Operational | ||||||
Gel... | 180 | 1 | Dismantled | ||||||
Ger... | 660 | 1 | Operational | ||||||
Ger... | 3,000 | 1 | Operational | ||||||
Ges... | 200 | 1 | Operational | ||||||
Ges... | 150 | 1 | Operational | ||||||
Ges... | 900 | 3 | Dismantled | ||||||
Ges... | 1,700 | 2 | Operational | ||||||
Ges... | 1,200 | 2 | Operational | ||||||
Ges... | 600 | 1 | Operational | ||||||
Ges... | 300 | 2 | Dismantled | ||||||
Ges... | 1,200 | 2 | Operational | ||||||
Ges... | 225 | 1 | Operational | ||||||
Ges... | 225 | 1 | Operational | ||||||
Get... | 450 | 2 | Dismantled | ||||||
Get... | 225 | 1 | Dismantled | ||||||
Get... | 275 | 1 | Dismantled | ||||||
Get... | 275 | 1 | Dismantled | ||||||
Get... | 275 | 1 | Dismantled | ||||||
Get... | 1,500 | 2 | Operational | ||||||
Get... | 1,500 | 2 | Operational | ||||||
Gie... | 600 | 2 | Dismantled | ||||||
Gil... | 210,000 | Planned | |||||||
Gil... | 660 | 1 | Operational | ||||||
Gim... | 600 | 1 | Operational | ||||||
Gim... | 9,000 | 3 | Operational | ||||||
Gis... | 800 | 1 | Operational | ||||||
Gis... | 5,250 | 3 | Operational | ||||||
Giv... | 600 | 1 | Operational | ||||||
Giv... | 600 | 1 | Operational | ||||||
Gje... | 1,500 | 2 | Operational | ||||||
Gje... | 1,980 | 3 | Operational | ||||||
Gje... | 600 | 1 | Operational | ||||||
Gje... | 1,200 | 2 | Operational | ||||||
Gje... | 600 | 1 | Operational | ||||||
Gje... | 660 | 1 | Operational | ||||||
Gje... | 1,320 | 2 | Operational | ||||||
Gje... | 400,000 | Planned | |||||||
Gje... | 100 | 1 | Dismantled | ||||||
Gjo... | 450 | 2 | Dismantled | ||||||
Gjo... | 225 | 1 | Dismantled | ||||||
Gjo... | 225 | 1 | Dismantled | ||||||
Gla... | 400 | 1 | Dismantled | ||||||
Gle... | 2,640 | 4 | Operational | ||||||
Glo... | 600 | 1 | Operational | ||||||
Glu... | 150 | 1 | Operational | ||||||
God... | 1,500 | 3 | Operational | ||||||
Gor... | 1,500 | 2 | Operational | ||||||
Gor... | 1,980 | 3 | Operational | ||||||
Gor... | 600 | 1 | Operational | ||||||
Got... | 2,600 | 2 | Operational | ||||||
Got... | 14,400 | 4 | Operational | ||||||
Got... | 400 | 1 | Operational | ||||||
Got... | 400 | 1 | Operational | ||||||
Got... | 250 | 1 | Dismantled | ||||||
Got... | 400 | 1 | Operational | ||||||
Got... | 400 | 1 | Dismantled | ||||||
Got... | 400 | 1 | Dismantled | ||||||
Got... | 400 | 1 | Dismantled | ||||||
Got... | 400 | 1 | Dismantled | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Got... | 400 | 1 | Dismantled | ||||||
Got... | 800 | 2 | Operational | ||||||
Got... | 400 | 1 | Operational | ||||||
Got... | 800 | 2 | Operational | ||||||
Got... | 400 | 1 | Operational | ||||||
Got... | 400 | 1 | Dismantled | ||||||
Got... | 800 | 2 | Operational | ||||||
Got... | 800 | 2 | Operational | ||||||
Got... | 1,750 | 7 | Dismantled | ||||||
Got... | 500 | 2 | Dismantled | ||||||
Got... | 250 | 1 | Dismantled | ||||||
Got... | 30,100 | 7 | Operational | ||||||
Got... | 8,600 | 2 | Operational | ||||||
Got... | 400 | 1 | Dismantled | ||||||
Got... | 400 | 1 | Dismantled | ||||||
Got... | 400 | 1 | Dismantled | ||||||
Got... | 500 | 2 | Dismantled | ||||||
Got... | 250 | 1 | Operational | ||||||
Gra... | 660 | 1 | Operational | ||||||
Gra... | 1,320 | 2 | Operational | ||||||
Gra... | 600 | 1 | Operational | ||||||
Gra... | 1,200 | 2 | Operational | ||||||
Gra... | 750 | 1 | Operational | ||||||
Gra... | 1,500 | 2 | Operational | ||||||
Gra... | 660 | 1 | Operational | ||||||
Gra... | 150 | 1 | Operational | ||||||
Gre... | 315,000 | Planned | |||||||
Gre... | 2,250 | 3 | Operational | ||||||
Gri... | 225 | 1 | Operational | ||||||
Gri... | 1,200 | 2 | Operational | ||||||
Gri... | 175 | 1 | Operational | ||||||
Gri... | 150 | 1 | Dismantled | ||||||
Gri... | 150 | 1 | Dismantled | ||||||
Gri... | 150 | 1 | Dismantled | ||||||
Gri... | 6,000 | 2 | Operational | ||||||
Gro... | 600 | 1 | Operational | ||||||
Gro... | 600 | 1 | Operational | ||||||
Gro... | 600 | 1 | Operational | ||||||
Gro... | 3,600 | 1 | Operational | ||||||
Gro... | 4,000 | 2 | Operational | ||||||
Gro... | 150 | 1 | Dismantled | ||||||
Gro... | 600 | 1 | Operational | ||||||
Gro... | 1,320 | 2 | Operational | ||||||
Gro... | 600 | 1 | Operational | ||||||
Gro... | 600 | 1 | Operational | ||||||
Gro... | 1,200 | 2 | Operational | ||||||
Gro... | 150 | 1 | Dismantled | ||||||
Gro... | 100 | 1 | Dismantled | ||||||
Gro... | 660 | 1 | Dismantled | ||||||
Gro... | 600 | 1 | Operational | ||||||
Gro... | 600 | 1 | Operational | ||||||
Gru... | 1,800 | 2 | Operational | ||||||
Gru... | 900 | 1 | Operational | ||||||
Gru... | 750 | 1 | Operational | ||||||
Gru... | 1,200 | 2 | Operational | ||||||
Gru... | 600 | 1 | Operational | ||||||
Gru... | 500 | 1 | Operational | ||||||
Gru... | 225 | 1 | Operational | ||||||
Gry... | 150 | 1 | Dismantled | ||||||
Græ... | 600 | 1 | Operational | ||||||
Græ... | 1,800 | 3 | Operational | ||||||
Græ... | 300 | 1 | Operational | ||||||
Gud... | 1,800 | 2 | Operational | ||||||
Gud... | 1,650 | 3 | Operational | ||||||
Gud... | 1,200 | 2 | Operational | ||||||
Gud... | 600 | 1 | Operational | ||||||
Gud... | 600 | 1 | Operational | ||||||
Gud... | 100 | 1 | Dismantled | ||||||
Gud... | 1,800 | 3 | Operational | ||||||
Gud... | 1,200 | 2 | Operational | ||||||
Gud... | 3,000 | 1 | Operational | ||||||
Gul... | 600 | 1 | Operational | ||||||
Gul... | 600 | 1 | Operational | ||||||
Gul... | 600 | 1 | Operational | ||||||
Gul... | 600 | 1 | Operational | ||||||
Gul... | 600 | 1 | Operational | ||||||
Gul... | 180 | 1 | Dismantled | ||||||
Gul... | 6,900 | 2 | Operational | ||||||
Gul... | 500,000 | Planned | |||||||
Gul... | 500,000 | Planned | |||||||
Gul... | 750 | 1 | Operational | ||||||
Gul... | 600 | 1 | Operational | ||||||
Gum... | 750 | 1 | Operational | ||||||
Gun... | 2,250 | 3 | Operational | ||||||
Gun... | 150 | 1 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Gun... | 100 | 1 | Operational | ||||||
Gun... | 1,320 | 2 | Dismantled | ||||||
Gun... | 2,640 | 4 | Dismantled | ||||||
Gun... | 1,200 | 2 | Operational | ||||||
Gun... | 1,200 | 2 | Operational | ||||||
Gun... | 600 | 1 | Operational | ||||||
Gun... | 300 | 2 | Dismantled | ||||||
Gun... | 150 | 1 | Dismantled | ||||||
Gun... | 225 | 1 | Dismantled | ||||||
Gun... | 12,000 | 6 | Operational | ||||||
Gur... | 150 | 1 | Dismantled | ||||||
Gyd... | 150 | 1 | Operational | ||||||
Gyr... | 1,320 | 2 | Operational | ||||||
Gyr... | 800 | 1 | Operational | ||||||
Gyr... | 1,600 | 2 | Operational | ||||||
Gær... | Dismantled | ||||||||
Haa... | 150 | 1 | Dismantled | ||||||
Haa... | 750 | 1 | Operational | ||||||
Haa... | 660 | 1 | Operational | ||||||
Haa... | 1,320 | 2 | Operational | ||||||
Haa... | 600 | 1 | Operational | ||||||
Haa... | 400 | 1 | Operational | ||||||
Had... | 2,600 | 2 | Operational | ||||||
Had... | 600 | 1 | Operational | ||||||
Had... | 1,200 | 2 | Operational | ||||||
Hag... | 2,200 | 4 | Operational | ||||||
Hag... | 23,000 | 10 | Operational | ||||||
Hag... | 4,000 | 2 | Operational | ||||||
Hag... | 2,000 | 1 | Operational | ||||||
Hag... | 6,900 | 3 | Operational | ||||||
Hag... | 6,900 | 3 | Operational | ||||||
Haj... | 150 | 1 | Dismantled | ||||||
Haj... | 150 | 1 | Dismantled | ||||||
Hal... | 225 | 1 | Operational | ||||||
Hal... | 225 | 1 | Dismantled | ||||||
Hal... | 450 | 2 | Dismantled | ||||||
Hal... | 450 | 2 | Operational | ||||||
Hal... | 1,500 | 2 | Operational | ||||||
Hal... | 450 | 3 | Dismantled | ||||||
Hal... | 150 | 1 | Dismantled | ||||||
Hal... | 150 | 1 | Operational | ||||||
Hal... | 750 | 1 | Operational | ||||||
Hal... | 150 | 1 | Operational | ||||||
Hal... | 3,600 | 4 | Operational | ||||||
Hal... | 1,200 | 2 | Operational | ||||||
Hal... | 600 | 1 | Operational | ||||||
Hal... | 600 | 1 | Operational | ||||||
Hal... | 600 | 1 | Operational | ||||||
Hal... | 2,400 | 4 | Operational | ||||||
Hal... | 225 | 1 | Operational | ||||||
Hal... | 500 | 1 | Operational | ||||||
Hal... | 500 | 1 | Operational | ||||||
Hal... | 200 | 1 | Dismantled | ||||||
Ham... | 160 | 1 | Operational | ||||||
Ham... | 2,250 | 3 | Operational | ||||||
Ham... | 750 | 1 | Operational | ||||||
Ham... | 200 | 1 | Operational | ||||||
Ham... | 200 | 1 | Dismantled | ||||||
Ham... | 660 | 1 | Operational | ||||||
Han... | 2,250 | 3 | Operational | ||||||
Han... | 2,640 | 4 | Operational | ||||||
Han... | 750 | 1 | Operational | ||||||
Han... | 10,800 | 3 | Operational | ||||||
Han... | 100 | 1 | Dismantled | ||||||
Han... | 180 | 1 | Dismantled | ||||||
Han... | 525 | 1 | Dismantled | ||||||
Han... | 3,600 | 1 | Operational | ||||||
Han... | 1,575 | 3 | Dismantled | ||||||
Han... | 7,200 | 2 | Operational | ||||||
Han... | 3,600 | 1 | Operational | ||||||
Han... | 500,000 | Planned | |||||||
Har... | 600 | 1 | Operational | ||||||
Har... | 675 | 3 | Dismantled | ||||||
Har... | 150 | 1 | Operational | ||||||
Har... | 150 | 1 | Dismantled | ||||||
Har... | 150 | 1 | Dismantled | ||||||
Har... | 6,900 | 3 | Operational | ||||||
Har... | 1,320 | 2 | Operational | ||||||
Har... | 1,700 | 2 | Operational | ||||||
Har... | 2,550 | 3 | Operational | ||||||
Har... | 850 | 1 | Operational | ||||||
Har... | 225 | 1 | Dismantled | ||||||
Har... | 150 | 1 | Dismantled | ||||||
Har... | 150 | 1 | Dismantled | ||||||
Har... | 600 | 1 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Har... | 1,200 | 2 | Operational | ||||||
Har... | 300 | 2 | Dismantled | ||||||
Har... | 150 | 1 | Dismantled | ||||||
Har... | 150 | 1 | Dismantled | ||||||
Har... | 2,550 | 3 | Operational | ||||||
Har... | 1,200 | 2 | Operational | ||||||
Har... | 400 | 1 | Dismantled | ||||||
Har... | 225 | 1 | Dismantled | ||||||
Har... | 500 | 1 | Operational | ||||||
Har... | 2,640 | 4 | Operational | ||||||
Har... | 1,320 | 2 | Operational | ||||||
Has... | 6,000 | 3 | Operational | ||||||
Has... | 200 | 1 | Operational | ||||||
Has... | 200 | 1 | Operational | ||||||
Has... | 200 | 1 | Dismantled | ||||||
Has... | 600 | 1 | Operational | ||||||
Has... | 600 | 1 | Operational | ||||||
Has... | 1,800 | 3 | Operational | ||||||
Has... | 1,200 | 2 | Operational | ||||||
Has... | 600 | 1 | Operational | ||||||
Has... | 150 | 1 | Dismantled | ||||||
Has... | 600 | 1 | Operational | ||||||
Has... | 400 | 1 | Dismantled | ||||||
Has... | 200 | 1 | Dismantled | ||||||
Has... | 2,000 | 1 | Operational | ||||||
Has... | 225 | 1 | Operational | ||||||
Has... | 750 | 1 | Operational | ||||||
Has... | 300 | 1 | Dismantled | ||||||
Hat... | 600 | 1 | Operational | ||||||
Hav... | 750 | 1 | Operational | ||||||
Hav... | 750 | 1 | Operational | ||||||
Hav... | 130 | 1 | Dismantled | ||||||
Hav... | 150 | 1 | Dismantled | ||||||
Hav... | 600 | 1 | Operational | ||||||
Hav... | 1,800 | 3 | Operational | ||||||
Hav... | 300 | 2 | Operational | ||||||
Hav... | 600 | 1 | Operational | ||||||
Hav... | 200 | 1 | Operational | ||||||
Hav... | 600 | 3 | Operational | ||||||
Hav... | 1,700 | 2 | Operational | ||||||
Hed... | 225 | 1 | Dismantled | ||||||
Hed... | 300 | 1 | Dismantled | ||||||
Hed... | 1,000 | 2 | Operational | ||||||
Hed... | 500 | 1 | Operational | ||||||
Hed... | 150 | 1 | Dismantled | ||||||
Hed... | 660 | 1 | Operational | ||||||
Hed... | 660 | 1 | Operational | ||||||
Hed... | 12,000 | 4 | Operational | ||||||
Hee... | 200 | 1 | Dismantled | ||||||
Hee... | 6,000 | 1 | Operational | ||||||
Hej... | 1,650 | 1 | Operational | ||||||
Hej... | 2,600 | 2 | Operational | ||||||
Hej... | 150 | 1 | Operational | ||||||
Hej... | 600 | 3 | Operational | ||||||
Hej... | 12,000 | 4 | Operational | ||||||
Hej... | 450 | 3 | Dismantled | ||||||
Hej... | 6,000 | 3 | Operational | ||||||
Hel... | 300 | 2 | Dismantled | ||||||
Hel... | 150 | 1 | Dismantled | ||||||
Hel... | 150 | 1 | Operational | ||||||
Hel... | 225 | 1 | Operational | ||||||
Hel... | 1,500 | 2 | Operational | ||||||
Hel... | 600 | 1 | Operational | ||||||
Hel... | 250 | 1 | Dismantled | ||||||
Hel... | 250 | 1 | Dismantled | ||||||
Hel... | 225 | 1 | Dismantled | ||||||
Hel... | 600 | 2 | Operational | ||||||
Hel... | 225 | 1 | Operational | ||||||
Hel... | 150 | 1 | Dismantled | ||||||
Hel... | 150 | 1 | Dismantled | ||||||
Hel... | 675 | 3 | Operational | ||||||
Hel... | 225 | 1 | Dismantled | ||||||
Hel... | 200 | 1 | Dismantled | ||||||
Hel... | 225 | 1 | Dismantled | ||||||
Hel... | 225 | 1 | Dismantled | ||||||
Hel... | 150 | 1 | Dismantled | ||||||
Hel... | 800 | 1 | Operational | ||||||
Hel... | 250 | 1 | Dismantled | ||||||
Hel... | 225 | 1 | Dismantled | ||||||
Hel... | 225 | 1 | Dismantled | ||||||
Hel... | 225 | 1 | Dismantled | ||||||
Hem... | 5,250 | 3 | Operational | ||||||
Hem... | 150 | 1 | Dismantled | ||||||
Hem... | 1,200 | 2 | Operational | ||||||
Hem... | 2,250 | 3 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Hem... | 2,250 | 3 | Operational | ||||||
Hem... | 1,500 | 3 | Operational | ||||||
Hem... | 9,000 | 3 | Operational | ||||||
Hem... | 6,000 | 2 | Operational | ||||||
Hem... | 21,000 | 7 | Operational | ||||||
Hem... | 18,000 | 5 | Operational | ||||||
Hen... | 400 | 1 | Dismantled | ||||||
Her... | 1,980 | 3 | Operational | ||||||
Her... | 1,500 | 2 | Operational | ||||||
Her... | Dismantled | ||||||||
Her... | 750 | 1 | Operational | ||||||
Her... | 660 | 1 | Operational | ||||||
Her... | 300 | 2 | Dismantled | ||||||
Hes... | 600 | 1 | Operational | ||||||
Hes... | 750 | 1 | Operational | ||||||
Hes... | 600 | 3 | Dismantled | ||||||
Hes... | 1,300 | 1 | Dismantled | ||||||
Hes... | 400 | 2 | Dismantled | ||||||
Hes... | 200 | 1 | Dismantled | ||||||
Hev... | 5,250 | 7 | Operational | ||||||
Hil... | 5,250 | 3 | Dismantled | ||||||
Hil... | 1,750 | 1 | Dismantled | ||||||
Hil... | 600 | 1 | Operational | ||||||
Hil... | 550 | 1 | Dismantled | ||||||
Hil... | 500 | 1 | Operational | ||||||
Hil... | 300 | 1 | Operational | ||||||
Hil... | 300 | 1 | Operational | ||||||
Hil... | 225 | 1 | Operational | ||||||
Hil... | 225 | 1 | Dismantled | ||||||
Hil... | 225 | 1 | Dismantled | ||||||
Hil... | 28,800 | 8 | Operational | ||||||
Hil... | 150 | 1 | Dismantled | ||||||
Hil... | 600 | 1 | Operational | ||||||
Hil... | 600 | 1 | Operational | ||||||
Hil... | 1,200 | 2 | Operational | ||||||
Hil... | 1,800 | 3 | Operational | ||||||
Hil... | 150 | 1 | Dismantled | ||||||
Hil... | 150 | 1 | Dismantled | ||||||
Hin... | 1,500 | 2 | Operational | ||||||
Hin... | 1,320 | 2 | Operational | ||||||
Hin... | 660 | 1 | Operational | ||||||
Hin... | 1,320 | 2 | Operational | ||||||
Hin... | 200 | 1 | Dismantled | ||||||
Hin... | 200 | 1 | Dismantled | ||||||
Hin... | 660 | 1 | Operational | ||||||
Hin... | 150 | 1 | Dismantled | ||||||
Hin... | 1,300 | 1 | Dismantled | ||||||
Hin... | 600 | 1 | Dismantled | ||||||
Hin... | 2,600 | 2 | Operational | ||||||
Hir... | 16,800 | 4 | Operational | ||||||
Hir... | 350,000 | Planned | |||||||
Hir... | 500,000 | Planned | |||||||
Hja... | 150 | 1 | Dismantled | ||||||
Hja... | 250 | 1 | Dismantled | ||||||
Hja... | 4,500 | 5 | Operational | ||||||
Hja... | 900 | 1 | Dismantled | ||||||
Hja... | 2,000 | 1 | Dismantled | ||||||
Hja... | 3,600 | 1 | Operational | ||||||
Hja... | 3,450 | 1 | Dismantled | ||||||
Hja... | 3,600 | 1 | Operational | ||||||
Hja... | 8,900 | 1 | Dismantled | ||||||
Hja... | 4,200 | 1 | Dismantled | ||||||
Hja... | 2,200 | 1 | Dismantled | ||||||
Hja... | 900 | 1 | Dismantled | ||||||
Hja... | 6,000 | 1 | Operational | ||||||
Hja... | 9,500 | 1 | Operational | ||||||
Hja... | 6,000 | 1 | Operational | ||||||
Hja... | 4,200 | 1 | Dismantled | ||||||
Hje... | 150 | 1 | Dismantled | ||||||
Hje... | 150 | 1 | Operational | ||||||
Hje... | 1,500 | 2 | Operational | ||||||
Hje... | 150 | 1 | Dismantled | ||||||
Hje... | 150 | 1 | Dismantled | ||||||
Hje... | 150 | 1 | Dismantled | ||||||
Hje... | 150 | 1 | Dismantled | ||||||
Hje... | 1,320 | 2 | Operational | ||||||
Hje... | 450 | 3 | Dismantled | ||||||
Hje... | 900 | 1 | Operational | ||||||
Hje... | 600 | 1 | Operational | ||||||
Hje... | 4,200 | 7 | Operational | ||||||
Hje... | 180 | 1 | Dismantled | ||||||
Hjo... | 600 | 1 | Operational | ||||||
Hjo... | 1,320 | 2 | Operational | ||||||
Hjo... | 2,700 | 3 | Operational | ||||||
Hjo... | 900 | 1 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Hjo... | 5,250 | 7 | Operational | ||||||
Hju... | 225 | 1 | Dismantled | ||||||
Hjø... | 16,800 | 4 | Operational | ||||||
Hob... | 600 | 1 | Operational | ||||||
Hob... | 600 | 1 | Operational | ||||||
Hob... | 300 | 1 | Dismantled | ||||||
Hog... | 1,320 | 2 | Operational | ||||||
Hog... | 1,320 | 2 | Operational | ||||||
Hog... | 660 | 1 | Operational | ||||||
Hog... | 750 | 1 | Operational | ||||||
Hoj... | 750 | 1 | Operational | ||||||
Hoj... | 750 | 1 | Operational | ||||||
Hoj... | 1,500 | 3 | Operational | ||||||
Hoj... | 1,000 | 2 | Operational | ||||||
Hoj... | 1,200 | 2 | Operational | ||||||
Hoj... | 450 | 1 | Dismantled | ||||||
Hoj... | 600 | 1 | Operational | ||||||
Hoj... | 800 | 1 | Operational | ||||||
Hoj... | 1,600 | 2 | Operational | ||||||
Hoj... | 660 | 1 | Operational | ||||||
Hoj... | 1,980 | 3 | Operational | ||||||
Hoj... | 900 | 1 | Operational | ||||||
Hoj... | 150 | 1 | Dismantled | ||||||
Hoj... | 1,200 | 2 | Operational | ||||||
Hok... | 1,320 | 2 | Operational | ||||||
Hok... | 600 | 1 | Operational | ||||||
Hok... | 150 | 1 | Dismantled | ||||||
Hol... | 600 | 1 | Operational | ||||||
Hol... | 300 | 2 | Dismantled | ||||||
Hol... | 300 | 1 | Dismantled | ||||||
Hol... | 16,500 | 11 | Operational | ||||||
Hol... | 150 | 1 | Dismantled | ||||||
Hol... | 2,550 | 3 | Operational | ||||||
Hol... | 225 | 1 | Operational | ||||||
Hol... | 675 | 3 | Operational | ||||||
Hol... | 225 | 1 | Dismantled | ||||||
Hol... | 750 | 1 | Operational | ||||||
Hol... | 750 | 1 | Operational | ||||||
Hol... | 160 | 1 | Dismantled | ||||||
Hol... | 160 | 1 | Dismantled | ||||||
Hol... | 160 | 1 | Dismantled | ||||||
Hol... | 9,000 | 3 | Operational | ||||||
Hol... | 660 | 1 | Operational | ||||||
Hol... | 660 | 1 | Operational | ||||||
Hol... | 150 | 1 | Operational | ||||||
Hol... | 600 | 1 | Operational | ||||||
Hol... | 500 | 1 | Operational | ||||||
Hom... | 3,000 | 4 | Operational | ||||||
Hom... | 750 | 1 | Operational | ||||||
Hon... | 3,000 | 5 | Operational | ||||||
Hop... | 1,300 | 1 | Operational | ||||||
Hop... | 150 | 1 | Operational | ||||||
Hop... | 1,300 | 1 | Operational | ||||||
Hor... | 600 | 1 | Operational | ||||||
Hor... | 600 | 1 | Operational | ||||||
Hor... | 600 | 1 | Operational | ||||||
Hor... | 150 | 1 | Dismantled | ||||||
Hor... | 150 | 1 | Dismantled | ||||||
Hor... | 200 | 1 | Dismantled | ||||||
Hor... | 300 | 2 | Operational | ||||||
Hor... | 150 | 1 | Operational | ||||||
Hor... | 3,500 | 2 | Operational | ||||||
Hor... | 225 | 1 | Dismantled | ||||||
Hor... | 100 | 1 | Dismantled | ||||||
Hor... | 100 | 1 | Dismantled | ||||||
Hor... | 200 | 1 | Dismantled | ||||||
Hor... | 250 | 1 | Dismantled | ||||||
Hor... | 300 | 1 | Operational | ||||||
Hor... | 300 | 1 | Operational | ||||||
Hor... | 300 | 1 | Operational | ||||||
Hor... | 450 | 2 | Dismantled | ||||||
Hor... | 225 | 1 | Dismantled | ||||||
Hor... | 150 | 1 | Operational | ||||||
Hor... | 200 | 1 | Operational | ||||||
Hor... | 2,550 | 3 | Operational | ||||||
Hor... | 160,000 | 80 | Operational | ||||||
Hor... | 209,300 | 91 | Operational | ||||||
Hor... | 406,700 | 49 | Operational | ||||||
Hor... | 300 | 2 | Dismantled | ||||||
Hor... | 750 | 1 | Operational | ||||||
Hor... | 1,320 | 2 | Operational | ||||||
Hor... | 750 | 1 | Operational | ||||||
Hor... | 150 | 1 | Dismantled | ||||||
Hor... | 800 | 1 | Operational | ||||||
Hor... | 800 | 1 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Hor... | 1,500 | 2 | Operational | ||||||
Hor... | 400 | 2 | Dismantled | ||||||
Hor... | 100 | 1 | Dismantled | ||||||
Hor... | 130 | 1 | Dismantled | ||||||
Hor... | 4,600 | 2 | Operational | ||||||
Hor... | 11,500 | 5 | Operational | ||||||
Hor... | 7,200 | 2 | Operational | ||||||
Hor... | 600 | 1 | Operational | ||||||
Hor... | 550 | 1 | Operational | ||||||
Hor... | 1,200 | 2 | Operational | ||||||
Hor... | 450 | 2 | Operational | ||||||
Hor... | 1,300 | 1 | Operational | ||||||
Hos... | 6,500 | 5 | Operational | ||||||
Hos... | 750 | 1 | Operational | ||||||
Hov... | 900 | 4 | Operational | ||||||
Hov... | 675 | 3 | Dismantled | ||||||
Hov... | 450 | 2 | Dismantled | ||||||
Hov... | 150 | 1 | Dismantled | ||||||
Hov... | 400 | 2 | Operational | ||||||
Hov... | 600 | 1 | Operational | ||||||
Hov... | 600 | 1 | Operational | ||||||
Hov... | 600 | 1 | Operational | ||||||
Hov... | 600 | 1 | Operational | ||||||
Hov... | 1,700 | 2 | Operational | ||||||
Hov... | 850 | 1 | Operational | ||||||
Hov... | 150 | 1 | Dismantled | ||||||
Hov... | 3,600 | 1 | Dismantled | ||||||
Hov... | 2,500 | 1 | Dismantled | ||||||
Hov... | 2,300 | 1 | Dismantled | ||||||
Hov... | 4,200 | 1 | Dismantled | ||||||
Hov... | 600 | 1 | Operational | ||||||
Hov... | 400 | 2 | Dismantled | ||||||
Hov... | 3,300 | 1 | Dismantled | ||||||
Hov... | 8,000 | 1 | Operational | ||||||
Hul... | 2,250 | 3 | Operational | ||||||
Hum... | 600 | 1 | Operational | ||||||
Hum... | 150 | 1 | Dismantled | ||||||
Hun... | 2,400 | 4 | Operational | ||||||
Hun... | 500 | 1 | Operational | ||||||
Hun... | 225 | 1 | Dismantled | ||||||
Hun... | 450 | 2 | Dismantled | ||||||
Hun... | 200 | 1 | Dismantled | ||||||
Hun... | 200 | 1 | Dismantled | ||||||
Hun... | 100 | 1 | Dismantled | ||||||
Hun... | 225 | 1 | Operational | ||||||
Hun... | 150 | 1 | Dismantled | ||||||
Hun... | 200 | 1 | Dismantled | ||||||
Hun... | 660 | 1 | Operational | ||||||
Hun... | 660 | 1 | Operational | ||||||
Hun... | 660 | 1 | Operational | ||||||
Hun... | 3,500 | 2 | Dismantled | ||||||
Hun... | 1,800 | 2 | Operational | ||||||
Hur... | 225 | 1 | Operational | ||||||
Hus... | 600 | 1 | Operational | ||||||
Hus... | 750 | 1 | Operational | ||||||
Hus... | 600 | 1 | Operational | ||||||
Hva... | 660 | 1 | Operational | ||||||
Hva... | 600 | 1 | Operational | ||||||
Hva... | 12,000 | 4 | Operational | ||||||
Hva... | 250 | 1 | Dismantled | ||||||
Hve... | 150 | 1 | Dismantled | ||||||
Hvi... | 1,500 | 2 | Operational | ||||||
Hvi... | 750 | 1 | Operational | ||||||
Hvi... | 450 | 2 | Operational | ||||||
Hvi... | 225 | 1 | Operational | ||||||
Hvi... | 750 | 1 | Operational | ||||||
Hvi... | 750 | 1 | Operational | ||||||
Hvi... | 225 | 1 | Operational | ||||||
Hvi... | 660 | 1 | Operational | ||||||
Hvi... | 225 | 1 | Dismantled | ||||||
Hvi... | 225 | 1 | Dismantled | ||||||
Hvi... | 150 | 1 | Dismantled | ||||||
Hvi... | 150 | 1 | Dismantled | ||||||
Hvi... | 150 | 1 | Dismantled | ||||||
Hvi... | 4,500 | 3 | Operational | ||||||
Hvi... | 3,900 | 3 | Operational | ||||||
Hvi... | 6,000 | 2 | Operational | ||||||
Hvi... | 250 | 1 | Operational | ||||||
Hvi... | 850 | 1 | Operational | ||||||
Hvo... | 350 | 2 | Operational | ||||||
Hyg... | 130 | 1 | Dismantled | ||||||
Hyg... | 660 | 1 | Operational | ||||||
Hyl... | 150 | 1 | Dismantled | ||||||
Hyl... | 1,200 | 2 | Operational | ||||||
Hyl... | 180 | 1 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Hyl... | 150 | 1 | Dismantled | ||||||
Hyl... | 150 | 1 | Operational | ||||||
Hyl... | 150 | 1 | Operational | ||||||
Hyr... | 1,300 | 1 | Operational | ||||||
Høg... | 10,350 | 3 | Operational | ||||||
Ide... | 1,200 | 2 | Operational | ||||||
Ide... | 150 | 1 | Dismantled | ||||||
Ide... | 150 | 1 | Dismantled | ||||||
Ide... | 150 | 1 | Operational | ||||||
Ido... | 2,000 | 2 | Operational | ||||||
Ido... | 3,750 | 5 | Operational | ||||||
Ido... | 3,450 | 1 | Operational | ||||||
Ids... | 150 | 1 | Dismantled | ||||||
Ika... | 12,000 | 4 | Operational | ||||||
Ilb... | 600 | 1 | Operational | ||||||
Ild... | 1,600 | 2 | Operational | ||||||
Ild... | 800 | 1 | Operational | ||||||
Ild... | 800 | 1 | Operational | ||||||
Ill... | 150 | 1 | Dismantled | ||||||
Ils... | 14,000 | 7 | Operational | ||||||
Ils... | 2,700 | 3 | Operational | ||||||
Ind... | 600 | 1 | Operational | ||||||
Ind... | 600 | 1 | Operational | ||||||
Ing... | 400 | 2 | Operational | ||||||
Ing... | 400 | 2 | Operational | ||||||
Ing... | 200 | 1 | Operational | ||||||
Ing... | 200 | 1 | Operational | ||||||
Jam... | 240,000 | Planned | |||||||
Jan... | 150 | 1 | Dismantled | ||||||
Jeb... | 1,320 | 2 | Operational | ||||||
Jeb... | 660 | 1 | Operational | ||||||
Jeb... | 660 | 1 | Operational | ||||||
Jeb... | 600 | 1 | Operational | ||||||
Jee... | 3,000 | 1 | Operational | ||||||
Jeg... | 4,000 | 4 | Operational | ||||||
Jej... | 1,800 | 2 | Operational | ||||||
Jej... | 750 | 1 | Operational | ||||||
Jej... | 600 | 1 | Operational | ||||||
Jej... | 300 | 2 | Dismantled | ||||||
Jen... | 3,750 | 5 | Operational | ||||||
Jen... | 6,000 | 2 | Operational | ||||||
Jen... | 3,000 | 1 | Operational | ||||||
Jen... | 1,125 | 5 | Operational | ||||||
Jen... | 1,800 | 3 | Operational | ||||||
Jer... | 1,980 | 3 | Operational | ||||||
Jer... | 130 | 1 | Dismantled | ||||||
Jer... | 270 | 1 | Dismantled | ||||||
Jes... | 150 | 1 | Dismantled | ||||||
Jet... | 130 | 1 | Dismantled | ||||||
Jet... | 150 | 1 | Dismantled | ||||||
Jon... | 300 | 2 | Operational | ||||||
Jon... | 300 | 2 | Operational | ||||||
Jon... | 150 | 1 | Operational | ||||||
Jor... | 750 | 1 | Operational | ||||||
Jor... | 150 | 1 | Dismantled | ||||||
Jor... | 400 | 2 | Operational | ||||||
Jue... | 850 | 1 | Operational | ||||||
Jue... | 2,550 | 3 | Operational | ||||||
Jun... | 1,700 | 2 | Operational | ||||||
Jun... | 600 | 1 | Dismantled | ||||||
Jun... | 600 | 1 | Operational | ||||||
Jun... | 600 | 1 | Operational | ||||||
Jun... | 175 | 1 | Operational | ||||||
Jyd... | 600 | 1 | Operational | ||||||
Jyn... | 12,000 | 8 | Operational | ||||||
Jys... | 1,050,000 | Planned | |||||||
Kal... | 600 | 1 | Operational | ||||||
Kal... | 3,600 | 1 | Operational | ||||||
Kal... | 150 | 1 | Dismantled | ||||||
Kal... | 1,200 | 2 | Operational | ||||||
Kal... | 1,200 | 2 | Operational | ||||||
Kal... | 300 | 1 | Operational | ||||||
Kal... | 225 | 1 | Dismantled | ||||||
Kal... | 200 | 1 | Dismantled | ||||||
Kal... | 225 | 1 | Dismantled | ||||||
Kal... | 150 | 1 | Dismantled | ||||||
Kap... | 500 | 1 | Operational | ||||||
Kap... | 300 | 1 | Dismantled | ||||||
Kap... | 225 | 1 | Operational | ||||||
Kap... | 225 | 1 | Dismantled | ||||||
Kar... | 660 | 1 | Operational | ||||||
Kar... | 900 | 3 | Operational | ||||||
Kar... | 360 | 2 | Operational | ||||||
Kar... | 150 | 1 | Dismantled | ||||||
Kar... | 250 | 1 | Dismantled | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Kas... | 150 | 1 | Dismantled | ||||||
Kas... | 150 | 1 | Dismantled | ||||||
Kas... | 850 | 1 | Operational | ||||||
Kas... | 660 | 1 | Operational | ||||||
Kas... | 150 | 1 | Operational | ||||||
Kas... | 2,600 | 2 | Operational | ||||||
Kas... | 660 | 1 | Operational | ||||||
Kas... | 660 | 1 | Operational | ||||||
Kas... | 660 | 1 | Operational | ||||||
Kas... | 500 | 1 | Operational | ||||||
Kas... | 600 | 1 | Operational | ||||||
Kas... | 600 | 1 | Operational | ||||||
Kas... | 500 | 1 | Operational | ||||||
Kas... | 600 | 1 | Operational | ||||||
Kas... | 300 | 2 | Dismantled | ||||||
Kas... | 155 | 1 | Dismantled | ||||||
Kas... | 155 | 1 | Dismantled | ||||||
Kas... | 600 | 1 | Operational | ||||||
Kas... | 1,800 | 3 | Operational | ||||||
Kas... | 600 | 1 | Operational | ||||||
Kas... | 600 | 1 | Operational | ||||||
Kas... | 600 | 1 | Operational | ||||||
Kas... | 600 | 1 | Operational | ||||||
Kas... | 150 | 1 | Operational | ||||||
Kas... | 5,000 | 5 | Operational | ||||||
Kat... | 660 | 1 | Operational | ||||||
Kat... | 225 | 1 | Dismantled | ||||||
Kat... | 225 | 1 | Dismantled | ||||||
Kav... | 150 | 1 | Dismantled | ||||||
Kav... | 150 | 1 | Dismantled | ||||||
Keg... | 450 | 1 | Operational | ||||||
Kel... | 1,500 | 2 | Operational | ||||||
Kel... | 9,000 | 3 | Operational | ||||||
Kel... | 1,200 | 2 | Operational | ||||||
Ker... | 660 | 1 | Operational | ||||||
Ker... | 660 | 1 | Operational | ||||||
Ker... | 660 | 1 | Operational | ||||||
Ker... | 250 | 1 | Dismantled | ||||||
Ker... | 225 | 1 | Dismantled | ||||||
Ket... | 750 | 1 | Operational | ||||||
Ket... | 2,250 | 3 | Operational | ||||||
Ket... | 9,200 | 4 | Operational | ||||||
Ket... | 2,300 | 1 | Operational | ||||||
Kib... | 750 | 1 | Operational | ||||||
Kib... | 1,500 | 2 | Dismantled | ||||||
Kib... | 1,200 | 2 | Operational | ||||||
Kib... | 850 | 1 | Dismantled | ||||||
Kib... | 9,000 | 3 | Operational | ||||||
Kid... | 4,500 | 6 | Operational | ||||||
Kid... | 6,400 | 2 | Operational | ||||||
Kie... | 300 | 2 | Operational | ||||||
Kip... | 225 | 1 | Dismantled | ||||||
Kip... | 225 | 1 | Operational | ||||||
Kir... | 500 | 2 | Dismantled | ||||||
Kir... | 1,800 | 2 | Operational | ||||||
Kir... | 600 | 1 | Operational | ||||||
Kir... | 600 | 1 | Operational | ||||||
Kir... | 750 | 1 | Operational | ||||||
Kir... | 1,500 | 2 | Operational | ||||||
Kir... | 150 | 1 | Dismantled | ||||||
Kir... | 150 | 1 | Dismantled | ||||||
Kir... | 150 | 1 | Dismantled | ||||||
Kir... | 225 | 1 | Dismantled | ||||||
Kir... | 150 | 1 | Operational | ||||||
Kir... | 180 | 1 | Operational | ||||||
Kir... | 150 | 1 | Dismantled | ||||||
Kis... | 1,980 | 3 | Operational | ||||||
Kje... | 150 | 1 | Dismantled | ||||||
Kje... | 150 | 1 | Dismantled | ||||||
Kje... | 300 | 1 | Operational | ||||||
Kje... | 3,000 | 3 | Operational | ||||||
Kla... | 4,600 | 2 | Operational | ||||||
Kla... | 2,750 | 1 | Operational | ||||||
Kla... | 160 | 1 | Dismantled | ||||||
Kla... | 150 | 1 | Dismantled | ||||||
Kla... | 6,000 | 3 | Dismantled | ||||||
Kle... | 1,000 | 1 | Operational | ||||||
Kle... | 660 | 1 | Operational | ||||||
Kle... | 6,000 | 2 | Operational | ||||||
Kle... | 2,300 | 1 | Operational | ||||||
Kli... | 13,200 | 22 | Dismantled | ||||||
Kli... | 750 | 3 | Dismantled | ||||||
Kli... | 7,800 | 13 | Dismantled | ||||||
Kli... | Dismantled | ||||||||
Kli... | 48,000 | 15 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Kli... | 585,000 | Planned | |||||||
Kli... | 2,250 | 3 | Operational | ||||||
Kli... | 250 | 1 | Operational | ||||||
Kli... | 750 | 3 | Operational | ||||||
Kli... | 150 | 1 | Dismantled | ||||||
Kli... | 750 | 1 | Operational | ||||||
Kli... | 150 | 1 | Dismantled | ||||||
Kli... | 5,000 | 5 | Operational | ||||||
Klo... | 600 | 1 | Operational | ||||||
Klo... | 150 | 1 | Dismantled | ||||||
Klo... | 300 | 2 | Dismantled | ||||||
Klo... | 2,250 | 3 | Operational | ||||||
Klo... | 1,320 | 2 | Operational | ||||||
Klo... | 600 | 1 | Operational | ||||||
Klæ... | 300 | 2 | Dismantled | ||||||
Kne... | 150 | 1 | Operational | ||||||
Kno... | 660 | 1 | Operational | ||||||
Kno... | 660 | 1 | Operational | ||||||
Knu... | 450 | 1 | Operational | ||||||
Knu... | 225 | 1 | Dismantled | ||||||
Knu... | 150 | 1 | Operational | ||||||
Knu... | 5,250 | 3 | Operational | ||||||
Knu... | 1,600 | 2 | Operational | ||||||
Knu... | 2,400 | 3 | Operational | ||||||
Kob... | 600 | 1 | Operational | ||||||
Kob... | 450 | 2 | Operational | ||||||
Kob... | 675 | 3 | Operational | ||||||
Kob... | 225 | 1 | Dismantled | ||||||
Kob... | 225 | 1 | Dismantled | ||||||
Kob... | 225 | 1 | Dismantled | ||||||
Kob... | 1,000 | 1 | Operational | ||||||
Kob... | 600 | 1 | Operational | ||||||
Kob... | 600 | 1 | Dismantled | ||||||
Kob... | 600 | 1 | Operational | ||||||
Kob... | 600 | 1 | Operational | ||||||
Kob... | 7,200 | 2 | Operational | ||||||
Kob... | 2,550 | 3 | Operational | ||||||
Kob... | 300 | 2 | Dismantled | ||||||
Kob... | 150 | 1 | Dismantled | ||||||
Kok... | 1,300 | 1 | Dismantled | ||||||
Kok... | 1,200 | 2 | Operational | ||||||
Kol... | 7,800 | 13 | Operational | ||||||
Kol... | 400 | 1 | Dismantled | ||||||
Kol... | 600 | 1 | Operational | ||||||
Kol... | 500 | 1 | Operational | ||||||
Kol... | 225 | 1 | Operational | ||||||
Kol... | 150 | 1 | Dismantled | ||||||
Kon... | 3,000 | 4 | Operational | ||||||
Kon... | 225 | 1 | Dismantled | ||||||
Kon... | 225 | 1 | Operational | ||||||
Kon... | 180 | 1 | Dismantled | ||||||
Kon... | 750 | 1 | Operational | ||||||
Kor... | 1,800 | 2 | Operational | ||||||
Kor... | 20,700 | 6 | Operational | ||||||
Kra... | 1,500 | 1 | Operational | ||||||
Kra... | 1,500 | 1 | Operational | ||||||
Kra... | 12,000 | 4 | Operational | ||||||
Kra... | 550 | 1 | Operational | ||||||
Kra... | 1,100 | 2 | Operational | ||||||
Kra... | 1,100 | 2 | Operational | ||||||
Kra... | 550 | 1 | Operational | ||||||
Kre... | 600 | 1 | Dismantled | ||||||
Kre... | 600 | 1 | Operational | ||||||
Kre... | 600 | 1 | Operational | ||||||
Kre... | 500 | 1 | Dismantled | ||||||
Kre... | 500 | 1 | Operational | ||||||
Kre... | 225 | 1 | Dismantled | ||||||
Kre... | 225 | 1 | Operational | ||||||
Kre... | 225 | 1 | Operational | ||||||
Kre... | 225 | 1 | Dismantled | ||||||
Kre... | 600 | 1 | Dismantled | ||||||
Kri... | 605,000 | 72 | Operational | ||||||
Kro... | 150 | 1 | Dismantled | ||||||
Kro... | 150 | 1 | Dismantled | ||||||
Kro... | 150 | 1 | Dismantled | ||||||
Kro... | 600 | 1 | Operational | ||||||
Kro... | 600 | 1 | Operational | ||||||
Kro... | 750 | 1 | Operational | ||||||
Kro... | 1,000 | 1 | Operational | ||||||
Kro... | 200 | 1 | Operational | ||||||
Kro... | 450 | 2 | Dismantled | ||||||
Kro... | 225 | 1 | Operational | ||||||
Kro... | 9,000 | 3 | Operational | ||||||
Kru... | 1,800 | 3 | Dismantled | ||||||
Kru... | 9,200 | 4 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Kru... | 10,000 | 5 | Operational | ||||||
Kul... | 1,320 | 2 | Operational | ||||||
Kul... | 1,800 | 3 | Operational | ||||||
Kul... | 1,320 | 2 | Operational | ||||||
Kum... | 750 | 1 | Operational | ||||||
Kum... | 660 | 1 | Operational | ||||||
Kun... | 2,300 | 1 | Operational | ||||||
Kun... | 4,600 | 2 | Operational | ||||||
Kvi... | 600 | 1 | Operational | ||||||
Kvi... | 6,000 | 2 | Operational | ||||||
Kvo... | 600 | 1 | Operational | ||||||
Kvo... | 150 | 1 | Dismantled | ||||||
Kvo... | 150 | 1 | Dismantled | ||||||
Kvæ... | 200 | 1 | Operational | ||||||
Kvæ... | 150 | 1 | Dismantled | ||||||
Kvæ... | 750 | 1 | Operational | ||||||
Kyn... | 3,780 | 21 | Dismantled | ||||||
Kyn... | 1,200 | 3 | Operational | ||||||
Kæd... | 1,000 | 1 | Operational | ||||||
Kær... | 750 | 1 | Operational | ||||||
Kær... | 2,700 | 3 | Operational | ||||||
Kær... | 225 | 1 | Dismantled | ||||||
Kær... | 450 | 3 | Operational | ||||||
Køl... | 100 | 1 | Dismantled | ||||||
Lad... | 150 | 1 | Dismantled | ||||||
Lae... | 540,000 | Planned | |||||||
Lag... | 150 | 1 | Operational | ||||||
Lam... | 2,250 | 3 | Operational | ||||||
Lam... | 8,000 | 4 | Operational | ||||||
Lam... | 1,500 | 3 | Operational | ||||||
Lam... | 2,300 | 1 | Operational | ||||||
Lan... | 600 | 1 | Operational | ||||||
Lan... | 1,200 | 2 | Operational | ||||||
Lan... | 200 | 1 | Dismantled | ||||||
Lan... | 200 | 1 | Dismantled | ||||||
Lan... | 600 | 1 | Operational | ||||||
Lan... | 600 | 1 | Operational | ||||||
Lan... | 600 | 1 | Operational | ||||||
Lan... | 600 | 1 | Operational | ||||||
Lan... | 300 | 1 | Operational | ||||||
Lan... | 300 | 2 | Dismantled | ||||||
Lan... | 150 | 1 | Dismantled | ||||||
Lan... | 150 | 1 | Dismantled | ||||||
Lan... | 750 | 1 | Operational | ||||||
Lan... | 1,500 | 2 | Operational | ||||||
Lan... | 250 | 1 | Dismantled | ||||||
Lan... | 150 | 1 | Dismantled | ||||||
Lan... | 300 | 2 | Dismantled | ||||||
Lan... | 1,200 | 2 | Operational | ||||||
Lan... | 750 | 1 | Operational | ||||||
Lan... | 750 | 1 | Operational | ||||||
Lan... | 300 | 1 | Dismantled | ||||||
Lan... | 150 | 1 | Dismantled | ||||||
Lan... | 750 | 1 | Operational | ||||||
Lan... | 750 | 1 | Operational | ||||||
Las... | 900 | 1 | Operational | ||||||
Las... | 1,200 | 2 | Operational | ||||||
Lau... | 750 | 1 | Operational | ||||||
Lau... | 3,000 | 4 | Operational | ||||||
Lee... | 3,000 | 3 | Operational | ||||||
Lej... | 150 | 1 | Dismantled | ||||||
Lej... | 6,000 | 2 | Operational | ||||||
Lek... | 1,320 | 2 | Operational | ||||||
Lek... | 660 | 1 | Operational | ||||||
Lem... | 24,000 | 8 | Operational | ||||||
Lem... | 660 | 1 | Dismantled | ||||||
Lem... | 225 | 1 | Dismantled | ||||||
Lem... | 3,000 | 1 | Dismantled | ||||||
Lem... | 660 | 1 | Dismantled | ||||||
Lem... | 3,600 | 1 | Operational | ||||||
Lem... | 2,600 | 1 | Dismantled | ||||||
Lem... | 1,320 | 2 | Operational | ||||||
Lem... | 600 | 1 | Operational | ||||||
Lem... | 600 | 1 | Operational | ||||||
Len... | 1,980 | 3 | Operational | ||||||
Len... | 1,320 | 2 | Operational | ||||||
Len... | 200 | 1 | Operational | ||||||
Ler... | 3,600 | 1 | Operational | ||||||
Ler... | 1,000 | 1 | Operational | ||||||
Lev... | 1,200 | 2 | Operational | ||||||
Lev... | 600 | 1 | Operational | ||||||
Lev... | 1,200 | 2 | Operational | ||||||
Li ... | 1,800 | 2 | Operational | ||||||
Li ... | 900 | 1 | Operational | ||||||
Li ... | 1,800 | 2 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Li ... | 900 | 1 | Operational | ||||||
Lih... | 200 | 1 | Dismantled | ||||||
Lih... | 200 | 1 | Operational | ||||||
Lil... | 600 | 1 | Operational | ||||||
Lil... | 300 | 2 | Dismantled | ||||||
Lil... | 600 | 1 | Operational | ||||||
Lil... | 160,000 | Planned | |||||||
Lim... | 150 | 1 | Dismantled | ||||||
Lin... | 3,000 | 5 | Operational | ||||||
Lin... | 150 | 1 | Dismantled | ||||||
Lin... | 660 | 1 | Operational | ||||||
Lin... | 1,000 | 1 | Operational | ||||||
Lin... | 4,000 | 2 | Operational | ||||||
Lin... | 660 | 1 | Operational | ||||||
Lin... | 2,640 | 4 | Operational | ||||||
Lin... | 3,600 | 4 | Operational | ||||||
Lin... | Dismantled | ||||||||
Lin... | Dismantled | ||||||||
Lin... | 9,000 | 3 | Operational | ||||||
Ljo... | 2,000 | 2 | Operational | ||||||
Ljo... | 2,000 | 2 | Operational | ||||||
Lod... | 2,550 | 3 | Operational | ||||||
Lod... | 175 | 1 | Dismantled | ||||||
Lod... | 175 | 1 | Operational | ||||||
Log... | 1,500 | 2 | Operational | ||||||
Log... | 150 | 1 | Operational | ||||||
Log... | 150 | 1 | Operational | ||||||
Log... | 150 | 1 | Dismantled | ||||||
Log... | 750 | 1 | Operational | ||||||
Log... | 1,300 | 1 | Operational | ||||||
Loj... | 600 | 1 | Operational | ||||||
Lol... | 253,000 | Planned | |||||||
Lol... | 260,000 | Planned | |||||||
Lom... | 3,000 | 4 | Operational | ||||||
Lom... | 300 | 1 | Operational | ||||||
Lom... | 300 | 1 | Operational | ||||||
Lom... | 900 | 3 | Operational | ||||||
Lom... | 300 | 2 | Dismantled | ||||||
Lom... | 300 | 1 | Dismantled | ||||||
Lom... | 225 | 1 | Dismantled | ||||||
Lon... | 600 | 1 | Operational | ||||||
Lon... | 200 | 1 | Dismantled | ||||||
Lon... | 150 | 1 | Dismantled | ||||||
Los... | 150 | 1 | Dismantled | ||||||
Lov... | 2,550 | 3 | Operational | ||||||
Lum... | 600 | 1 | Operational | ||||||
Lun... | 150 | 1 | Dismantled | ||||||
Lun... | 225 | 1 | Dismantled | ||||||
Lun... | 1,200 | 2 | Operational | ||||||
Lun... | 1,000 | 4 | Dismantled | ||||||
Lun... | 200 | 1 | Dismantled | ||||||
Lun... | 600 | 1 | Operational | ||||||
Lun... | 550 | 1 | Operational | ||||||
Lun... | 550 | 1 | Operational | ||||||
Lun... | 550 | 1 | Operational | ||||||
Lun... | 150 | 1 | Dismantled | ||||||
Lun... | 250 | 1 | Operational | ||||||
Lun... | 600 | 1 | Operational | ||||||
Lun... | 250 | 1 | Dismantled | ||||||
Lun... | 150 | 1 | Dismantled | ||||||
Lun... | 150 | 1 | Dismantled | ||||||
Lun... | 150 | 1 | Dismantled | ||||||
Lun... | 120 | 1 | Dismantled | ||||||
Lun... | 300 | 2 | Dismantled | ||||||
Lun... | 150 | 1 | Dismantled | ||||||
Lun... | 1,500 | 2 | Operational | ||||||
Lun... | 1,600 | 2 | Operational | ||||||
Lun... | 200 | 1 | Operational | ||||||
Lyb... | 225 | 1 | Dismantled | ||||||
Lyb... | 225 | 1 | Dismantled | ||||||
Lyb... | 225 | 1 | Operational | ||||||
Lyd... | 150 | 1 | Dismantled | ||||||
Lyn... | 750 | 1 | Operational | ||||||
Lyn... | 660 | 1 | Operational | ||||||
Lyn... | 2,640 | 4 | Operational | ||||||
Lyn... | 600 | 1 | Operational | ||||||
Lyn... | 600 | 1 | Operational | ||||||
Lyn... | 200 | 1 | Dismantled | ||||||
Lyn... | 3,000 | 3 | Dismantled | ||||||
Lyn... | 15,000 | 3 | Operational | ||||||
Lys... | 550,000 | Planned | |||||||
Lys... | 750 | 1 | Operational | ||||||
Lys... | 200 | 1 | Dismantled | ||||||
Løj... | 2,700 | 3 | Operational | ||||||
Løn... | Dismantled | ||||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Løn... | Dismantled | ||||||||
Løn... | 3,600 | 1 | Operational | ||||||
Mad... | 1,200 | 2 | Dismantled | ||||||
Mad... | 600 | 3 | Dismantled | ||||||
Mad... | 1,000 | 5 | Dismantled | ||||||
Mad... | 750 | 1 | Dismantled | ||||||
Mad... | 750 | 1 | Dismantled | ||||||
Mad... | 2,400 | 4 | Dismantled | ||||||
Mad... | 16,000 | 2 | Operational | ||||||
Mad... | 400 | 1 | Operational | ||||||
Mag... | 150 | 1 | Dismantled | ||||||
Mag... | 900 | 1 | Operational | ||||||
Mag... | 900 | 1 | Operational | ||||||
Mag... | 130 | 1 | Dismantled | ||||||
Mag... | 1,200 | 2 | Dismantled | ||||||
Mag... | 6,600 | 2 | Operational | ||||||
Mag... | 3,300 | 1 | Operational | ||||||
Mag... | 660 | 1 | Operational | ||||||
Mag... | 660 | 1 | Operational | ||||||
Maj... | 300 | 1 | Operational | ||||||
Mal... | 225 | 1 | Dismantled | ||||||
Mal... | 300 | 2 | Dismantled | ||||||
Mam... | 500 | 1 | Operational | ||||||
Mam... | 500 | 1 | Operational | ||||||
Man... | 500 | 2 | Dismantled | ||||||
Mar... | 600 | 1 | Operational | ||||||
Mar... | 1,500 | 2 | Operational | ||||||
Mar... | 1,200 | 2 | Operational | ||||||
Mas... | 150 | 1 | Operational | ||||||
Mau... | 600 | 1 | Operational | ||||||
Mau... | 600 | 1 | Operational | ||||||
Mau... | 600 | 1 | Operational | ||||||
Mau... | 300 | 2 | Dismantled | ||||||
Mee... | 600 | 1 | Operational | ||||||
Mej... | 660 | 1 | Operational | ||||||
Mej... | 450 | 3 | Operational | ||||||
Mej... | 130 | 1 | Dismantled | ||||||
Mej... | 1,000 | 1 | Operational | ||||||
Mej... | 660 | 1 | Operational | ||||||
Mej... | 660 | 1 | Operational | ||||||
Mej... | 450 | 3 | Dismantled | ||||||
Mej... | 2,000 | 2 | Operational | ||||||
Mej... | 660 | 1 | Operational | ||||||
Mej... | 660 | 1 | Operational | ||||||
Mej... | 660 | 1 | Operational | ||||||
Mej... | 600 | 1 | Operational | ||||||
Mel... | 180 | 1 | Operational | ||||||
Mel... | 180 | 1 | Operational | ||||||
Mel... | 2,250 | 3 | Operational | ||||||
Mel... | 2,400 | 4 | Operational | ||||||
Mel... | 600 | 1 | Operational | ||||||
Mel... | 1,200 | 2 | Operational | ||||||
Mel... | Dismantled | ||||||||
Mel... | Dismantled | ||||||||
Men... | 1,500 | 2 | Operational | ||||||
Men... | 750 | 3 | Dismantled | ||||||
Mer... | 225 | 1 | Dismantled | ||||||
Mes... | 1,320 | 2 | Operational | ||||||
Mes... | 660 | 1 | Operational | ||||||
Mid... | 40,000 | 20 | Operational | ||||||
Min... | 2,300 | 1 | Operational | ||||||
Min... | 2,300 | 1 | Operational | ||||||
Mje... | 150 | 1 | Operational | ||||||
Mje... | 150 | 1 | Dismantled | ||||||
Mob... | 9,000 | 3 | Operational | ||||||
Mob... | 3,750 | 5 | Dismantled | ||||||
Mob... | 1,800 | 3 | Dismantled | ||||||
Mob... | 1,200 | 2 | Dismantled | ||||||
Mob... | 16,500 | 5 | Operational | ||||||
Mod... | 1,600 | 2 | Operational | ||||||
Moj... | 150 | 1 | Operational | ||||||
Mol... | 150 | 1 | Dismantled | ||||||
Mol... | 1,700 | 2 | Operational | ||||||
Mol... | 3,600 | 1 | Operational | ||||||
Mol... | 600 | 1 | Operational | ||||||
Mol... | 150 | 1 | Dismantled | ||||||
Mon... | 600 | 1 | Operational | ||||||
Mon... | 150 | 1 | Operational | ||||||
Mor... | 750 | 1 | Operational | ||||||
Mor... | 750 | 1 | Operational | ||||||
Mor... | 1,200 | 2 | Operational | ||||||
Mor... | 1,100 | 2 | Operational | ||||||
Mor... | 500 | 1 | Operational | ||||||
Mor... | 225 | 1 | Operational | ||||||
Mos... | 300 | 2 | Dismantled | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Mos... | 12,000 | 6 | Operational | ||||||
Mou... | 150 | 1 | Dismantled | ||||||
Mul... | 1,600 | 2 | Operational | ||||||
Mul... | 800 | 1 | Operational | ||||||
Mul... | 1,320 | 2 | Operational | ||||||
Mul... | 660 | 1 | Operational | ||||||
Mul... | 750 | 1 | Operational | ||||||
Mus... | 150 | 1 | Dismantled | ||||||
Myg... | 3,960 | 6 | Operational | ||||||
Myr... | 100 | 1 | Dismantled | ||||||
Nag... | 1,700 | 2 | Operational | ||||||
Nag... | 150 | 1 | Operational | ||||||
Nak... | 200 | 1 | Operational | ||||||
Nau... | 225 | 1 | Operational | ||||||
Nau... | 150 | 1 | Dismantled | ||||||
Nau... | 150 | 1 | Dismantled | ||||||
Nau... | 150 | 1 | Dismantled | ||||||
Nau... | 150 | 1 | Dismantled | ||||||
Nav... | 1,000 | 1 | Operational | ||||||
Neb... | 4,400 | 8 | Operational | ||||||
Neb... | 150 | 1 | Operational | ||||||
Neb... | 500 | 1 | Operational | ||||||
Ned... | 1,700 | 2 | Operational | ||||||
Nee... | 6,000 | 3 | Operational | ||||||
Nee... | 1,500 | 3 | Dismantled | ||||||
Nee... | 9,000 | 3 | Operational | ||||||
Nee... | 10,800 | 3 | Operational | ||||||
Nee... | 500 | 1 | Operational | ||||||
Nee... | 1,500 | 3 | Dismantled | ||||||
Nim... | 1,800 | 2 | Operational | ||||||
Nis... | 200 | 1 | Operational | ||||||
Nis... | 225 | 1 | Operational | ||||||
Nis... | 150 | 1 | Dismantled | ||||||
Nis... | 300 | 2 | Dismantled | ||||||
Nis... | 150 | 1 | Dismantled | ||||||
Nis... | 28,000 | 4 | Operational | ||||||
No... | 6,900 | 3 | Operational | ||||||
No... | 23,100 | 7 | Operational | ||||||
Nod... | 800 | 1 | Operational | ||||||
Nod... | 800 | 1 | Operational | ||||||
Nod... | 225 | 1 | Dismantled | ||||||
Noj... | 1,000 | 1 | Operational | ||||||
Nol... | 4,000 | 4 | Operational | ||||||
Nor... | 1,980 | 3 | Operational | ||||||
Nor... | 150 | 1 | Operational | ||||||
Nor... | 650,000 | Planned | |||||||
Nor... | 1,500 | 1 | Operational | ||||||
Nor... | 130 | 1 | Dismantled | ||||||
Nor... | 130 | 1 | Dismantled | ||||||
Nor... | 130 | 1 | Dismantled | ||||||
Nor... | 450 | 2 | Operational | ||||||
Nor... | 225 | 1 | Operational | ||||||
Nor... | 8,000 | 4 | Operational | ||||||
Nor... | 160,000 | Planned | |||||||
Nor... | 1,500 | 2 | Operational | ||||||
Nor... | 300 | 2 | Operational | ||||||
Nor... | 1,800 | 2 | Operational | ||||||
Nor... | 900 | 1 | Operational | ||||||
Nor... | 150 | 1 | Dismantled | ||||||
Nor... | 150 | 1 | Dismantled | ||||||
Nor... | 2,250 | 3 | Operational | ||||||
Nor... | 180 | 1 | Dismantled | ||||||
Nor... | 150 | 1 | Operational | ||||||
Nor... | 400 | 2 | Operational | ||||||
Nor... | 450 | 1 | Operational | ||||||
Nor... | 150 | 1 | Dismantled | ||||||
Nor... | 1,000 | 1 | Operational | ||||||
Nor... | 15,750 | 21 | Operational | ||||||
Nor... | 750 | 1 | Dismantled | ||||||
Nor... | 1,500 | 2 | Operational | ||||||
Nor... | 225 | 1 | Dismantled | ||||||
Nor... | 750 | 1 | Operational | ||||||
Nor... | 12,600 | 42 | Dismantled | ||||||
Nor... | 3,770 | 29 | Dismantled | ||||||
Nor... | 130 | 1 | Dismantled | ||||||
Nor... | 1,320 | 4 | Operational | ||||||
Nor... | 2,640 | 4 | Operational | ||||||
Nor... | 2,640 | 4 | Operational | ||||||
Nor... | 500 | 5 | Dismantled | ||||||
Nor... | 150 | 1 | Dismantled | ||||||
Nor... | 750 | 1 | Operational | ||||||
Nor... | 750 | 1 | Operational | ||||||
Nor... | 750 | 1 | Operational | ||||||
Not... | 200 | 1 | Dismantled | ||||||
Not... | 150 | 1 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Not... | 150 | 1 | Dismantled | ||||||
Not... | 200 | 1 | Dismantled | ||||||
Nov... | 150 | 1 | Dismantled | ||||||
Nov... | 755 | 1 | Operational | ||||||
Nr.... | 660 | 1 | Operational | ||||||
Nr.... | 660 | 1 | Operational | ||||||
Nr.... | 660 | 1 | Operational | ||||||
Nr.... | 1,200 | 2 | Operational | ||||||
Nr.... | 600 | 1 | Operational | ||||||
Nr.... | 600 | 1 | Operational | ||||||
Nr.... | 600 | 1 | Operational | ||||||
Nr.... | 660 | 1 | Dismantled | ||||||
Nr.... | 660 | 1 | Dismantled | ||||||
Nr.... | 660 | 1 | Dismantled | ||||||
Nr.... | 1,000 | 2 | Operational | ||||||
Nr.... | 500 | 1 | Operational | ||||||
Nr.... | 1,000 | 2 | Operational | ||||||
Nr.... | 225 | 1 | Dismantled | ||||||
Nyb... | 4,200 | 1 | Operational | ||||||
Nyb... | 150 | 1 | Dismantled | ||||||
Nyb... | 600 | 1 | Operational | ||||||
Nyb... | 225 | 1 | Operational | ||||||
Nyb... | 660 | 1 | Operational | ||||||
Nyb... | 660 | 1 | Operational | ||||||
Nyk... | 260 | 2 | Operational | ||||||
Nyk... | 4,600 | 2 | Operational | ||||||
Nyk... | 150 | 1 | Dismantled | ||||||
Nyk... | 150 | 1 | Dismantled | ||||||
Nym... | 660 | 1 | Operational | ||||||
Nyr... | 3,000 | 4 | Operational | ||||||
Nyr... | 150 | 1 | Operational | ||||||
Nys... | 9,000 | 3 | Operational | ||||||
Nys... | 4,500 | 6 | Operational | ||||||
Nys... | 165,600 | 72 | Operational | ||||||
Næs... | 5,400 | 6 | Operational | ||||||
Næs... | 150 | 1 | Dismantled | ||||||
Næs... | 10,350 | 3 | Operational | ||||||
Næs... | 10,350 | 3 | Operational | ||||||
Næs... | 600 | 2 | Operational | ||||||
Næs... | 200 | 1 | Dismantled | ||||||
Næs... | 100 | 1 | Dismantled | ||||||
Næs... | 160 | 1 | Dismantled | ||||||
Næs... | 450 | 2 | Operational | ||||||
Nør... | 13,800 | 6 | Operational | ||||||
Nør... | 2,300 | 1 | Operational | ||||||
Nør... | 2,300 | 1 | Operational | ||||||
Nør... | 9,200 | 4 | Operational | ||||||
Nør... | 2,300 | 1 | Operational | ||||||
O. ... | 225 | 1 | Dismantled | ||||||
O.J... | 850 | 1 | Operational | ||||||
O.J... | 850 | 1 | Operational | ||||||
O.J... | 225 | 1 | Operational | ||||||
Obd... | 3,000 | 5 | Operational | ||||||
Odd... | 600 | 1 | Operational | ||||||
Odd... | 1,200 | 2 | Operational | ||||||
Odd... | 300 | 1 | Dismantled | ||||||
Odd... | 150 | 1 | Dismantled | ||||||
Odi... | 2,250,000 | Planned | |||||||
Odu... | 600 | 1 | Operational | ||||||
Oks... | 600 | 1 | Operational | ||||||
Oks... | 600 | 1 | Operational | ||||||
Oks... | 5,250 | 3 | Operational | ||||||
Oks... | 750 | 1 | Operational | ||||||
Oks... | 450 | 3 | Dismantled | ||||||
Oks... | 3,900 | 3 | Operational | ||||||
Oks... | 1,500 | 2 | Operational | ||||||
Oll... | 3,600 | 1 | Operational | ||||||
Ols... | 660 | 1 | Operational | ||||||
Ols... | 660 | 1 | Operational | ||||||
Ols... | 600 | 1 | Operational | ||||||
Ols... | 225 | 1 | Dismantled | ||||||
Ols... | 1,750 | 1 | Dismantled | ||||||
Ols... | 1,500 | 2 | Operational | ||||||
Ols... | 400 | 2 | Dismantled | ||||||
Ols... | 600 | 3 | Dismantled | ||||||
Omm... | 400 | 2 | Dismantled | ||||||
Omm... | 6,500 | 13 | Operational | ||||||
Omm... | 900 | 1 | Operational | ||||||
Omo... | 320,000 | Planned | |||||||
Omv... | 2,000 | 1 | Operational | ||||||
Ons... | 600 | 1 | Operational | ||||||
Ons... | 600 | 1 | Operational | ||||||
Ons... | 1,200 | 2 | Operational | ||||||
Opa... | 3,600 | 1 | Operational | ||||||
Opp... | 3,750 | 5 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Opp... | 3,000 | 4 | Operational | ||||||
Opp... | 750 | 1 | Operational | ||||||
Opp... | 1,500 | 2 | Operational | ||||||
Orb... | 2,000 | 2 | Operational | ||||||
Orb... | 600 | 1 | Operational | ||||||
Orb... | 150 | 1 | Dismantled | ||||||
Orb... | 2,250 | 3 | Operational | ||||||
Orb... | 660 | 1 | Operational | ||||||
Orb... | 660 | 1 | Operational | ||||||
Ord... | 3,000 | 3 | Operational | ||||||
Ord... | 2,000 | 2 | Operational | ||||||
Orm... | 600 | 1 | Operational | ||||||
Orn... | 600 | 2 | Dismantled | ||||||
Orn... | 3,000 | 1 | Operational | ||||||
Orn... | 150 | 1 | Dismantled | ||||||
Ors... | 18,000 | 6 | Operational | ||||||
Ors... | 150 | 1 | Dismantled | ||||||
Ors... | 150 | 1 | Dismantled | ||||||
Ors... | 225 | 1 | Dismantled | ||||||
Ors... | 150 | 1 | Dismantled | ||||||
Ors... | 150 | 1 | Operational | ||||||
Ors... | 400 | 2 | Dismantled | ||||||
Ors... | 300 | 1 | Dismantled | ||||||
Ors... | 1,000 | 1 | Operational | ||||||
Ors... | 2,250 | 3 | Operational | ||||||
Ors... | 1,500 | 2 | Operational | ||||||
Ors... | 3,900 | 30 | Dismantled | ||||||
Ors... | 300 | 1 | Dismantled | ||||||
Ors... | 1,198 | 2 | Operational | ||||||
Ort... | 2,000 | 1 | Operational | ||||||
Ort... | 4,950 | 3 | Operational | ||||||
Oru... | 600 | 1 | Operational | ||||||
Oru... | 300 | 2 | Operational | ||||||
Oru... | 3,000 | 3 | Operational | ||||||
Oru... | 300 | 1 | Operational | ||||||
Oru... | 150 | 1 | Dismantled | ||||||
Osb... | 2,400 | 3 | Operational | ||||||
Osl... | 200 | 1 | Dismantled | ||||||
Ost... | 1,320 | 2 | Operational | ||||||
Ost... | 660 | 1 | Operational | ||||||
Ost... | 1,200 | 2 | Operational | ||||||
Ost... | 500 | 1 | Operational | ||||||
Ost... | 200 | 1 | Operational | ||||||
Ost... | 660 | 1 | Operational | ||||||
Ost... | 660 | 1 | Operational | ||||||
Ost... | 660 | 1 | Operational | ||||||
Ost... | 1,320 | 2 | Operational | ||||||
Ost... | 660 | 1 | Operational | ||||||
Ost... | 150 | 1 | Dismantled | ||||||
Ost... | 150 | 1 | Dismantled | ||||||
Ost... | 200 | 1 | Dismantled | ||||||
Ost... | 3,500 | 2 | Dismantled | ||||||
Ost... | 225 | 1 | Dismantled | ||||||
Ost... | 225 | 1 | Dismantled | ||||||
Ost... | 1,980 | 3 | Operational | ||||||
Ost... | 600 | 1 | Operational | ||||||
Ost... | 150 | 1 | Operational | ||||||
Ost... | 150 | 1 | Operational | ||||||
Ost... | 1,350 | 6 | Operational | ||||||
Ost... | 450 | 2 | Operational | ||||||
Ost... | 225 | 1 | Dismantled | ||||||
Ost... | 225 | 1 | Dismantled | ||||||
Ost... | 225 | 1 | Dismantled | ||||||
Ost... | 225 | 1 | Dismantled | ||||||
Ost... | 225 | 1 | Dismantled | ||||||
Ost... | 225 | 1 | Dismantled | ||||||
Ost... | 225 | 1 | Dismantled | ||||||
Ost... | 450 | 2 | Dismantled | ||||||
Ost... | 225 | 1 | Dismantled | ||||||
Ost... | 3,000 | 3 | Operational | ||||||
Ost... | 3,300 | 2 | Operational | ||||||
Ost... | 1,980 | 3 | Operational | ||||||
Ost... | 2,250 | 3 | Operational | ||||||
Ost... | 1,500 | 2 | Operational | ||||||
Ost... | 6,000 | 1 | Dismantled | ||||||
Ost... | 4,000 | 1 | Dismantled | ||||||
Ost... | 8,000 | 1 | Operational | ||||||
Ost... | 7,000 | 1 | Dismantled | ||||||
Ost... | 7,000 | 1 | Operational | ||||||
Ost... | 8,000 | 1 | Dismantled | ||||||
Ost... | 8,600 | 1 | Operational | ||||||
Ost... | 11,000 | 1 | Operational | ||||||
Ost... | 14,000 | 1 | Operational | ||||||
Ost... | 3,300 | 1 | Operational | ||||||
Ost... | 15,000 | 1 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Ost... | 14,000 | 1 | Operational | ||||||
Ost... | 2,000 | 1 | Operational | ||||||
Ost... | 1,575 | 7 | Dismantled | ||||||
Ost... | 250 | 1 | Dismantled | ||||||
Ost... | 600 | 1 | Operational | ||||||
Ost... | 2,400 | 4 | Operational | ||||||
Ost... | 600 | 1 | Operational | ||||||
Ost... | 150 | 1 | Operational | ||||||
Ost... | 6,000 | 1 | Operational | ||||||
Ost... | 13,200 | 4 | Operational | ||||||
Ost... | 6,600 | 2 | Operational | ||||||
Ott... | 660 | 1 | Operational | ||||||
Ott... | 660 | 1 | Operational | ||||||
Ott... | 600 | 1 | Operational | ||||||
Ott... | 1,800 | 3 | Operational | ||||||
Ott... | 500 | 1 | Operational | ||||||
Ott... | 130 | 1 | Dismantled | ||||||
Our... | 200 | 1 | Operational | ||||||
Ous... | 150 | 1 | Dismantled | ||||||
Out... | 100 | 1 | Operational | ||||||
Out... | 130 | 1 | Dismantled | ||||||
Out... | 3,000 | 1 | Operational | ||||||
Out... | 3,000 | 1 | Operational | ||||||
Ove... | 300 | 2 | Operational | ||||||
Ove... | 450 | 3 | Operational | ||||||
Ove... | 150 | 1 | Operational | ||||||
Ove... | 660 | 1 | Operational | ||||||
Ove... | 150 | 1 | Dismantled | ||||||
Ove... | 57,600 | 16 | Operational | ||||||
Ove... | 7,200 | 2 | Operational | ||||||
Ove... | 14,400 | 4 | Operational | ||||||
Ovt... | 1,320 | 2 | Operational | ||||||
Par... | 600 | 1 | Operational | ||||||
Ped... | 1,000 | 2 | Operational | ||||||
Ped... | 150 | 1 | Dismantled | ||||||
Per... | 2,000 | 2 | Operational | ||||||
Per... | 660 | 1 | Operational | ||||||
Pil... | 2,250 | 3 | Operational | ||||||
Pil... | 1,500 | 2 | Operational | ||||||
Pil... | 400 | 1 | Operational | ||||||
Pil... | 150 | 1 | Operational | ||||||
Pis... | 1,200 | 2 | Operational | ||||||
Pis... | 300 | 2 | Dismantled | ||||||
Pou... | 200 | 1 | Dismantled | ||||||
Præ... | 160 | 1 | Dismantled | ||||||
Præ... | 160 | 1 | Dismantled | ||||||
Rak... | 3,500 | 2 | Operational | ||||||
Rak... | 3,000 | 1 | Operational | ||||||
Ram... | 8,000 | 4 | Operational | ||||||
Ram... | 1,200 | 2 | Dismantled | ||||||
Ram... | 225 | 1 | Dismantled | ||||||
Ram... | 4,200 | 7 | Dismantled | ||||||
Ram... | 8,000 | 4 | Dismantled | ||||||
Ram... | 2,000 | 1 | Dismantled | ||||||
Ram... | 150 | 1 | Dismantled | ||||||
Ram... | 225 | 1 | Dismantled | ||||||
Ram... | 225 | 1 | Dismantled | ||||||
Ram... | 150 | 1 | Dismantled | ||||||
Ram... | 225 | 1 | Dismantled | ||||||
Ram... | 150 | 1 | Dismantled | ||||||
Ram... | 2,000 | 1 | Operational | ||||||
Ram... | 2,000 | 1 | Operational | ||||||
Ram... | 16,500 | 5 | Operational | ||||||
Ram... | 3,300 | 1 | Operational | ||||||
Ran... | 660 | 1 | Operational | ||||||
Ran... | 180 | 1 | Operational | ||||||
Ran... | 160 | 1 | Operational | ||||||
Ran... | 150 | 1 | Dismantled | ||||||
Rar... | 200 | 1 | Dismantled | ||||||
Rar... | 1,500 | 3 | Operational | ||||||
Ras... | 225 | 1 | Operational | ||||||
Ras... | 1,500 | 2 | Operational | ||||||
Ras... | 1,500 | 2 | Operational | ||||||
Rav... | 1,200 | 2 | Operational | ||||||
Rav... | 600 | 1 | Operational | ||||||
Rav... | 300 | 2 | Dismantled | ||||||
Rav... | 450 | 3 | Operational | ||||||
Rav... | 800 | 1 | Operational | ||||||
Rav... | 225 | 1 | Dismantled | ||||||
Rav... | 1,600 | 2 | Operational | ||||||
Rav... | 150 | 1 | Dismantled | ||||||
Rav... | 2,250 | 3 | Operational | ||||||
Red... | 1,200 | 2 | Operational | ||||||
Red... | 200 | 1 | Dismantled | ||||||
Red... | 3,000 | 1 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Red... | 6,000 | 2 | Operational | ||||||
Ree... | 250 | 1 | Dismantled | ||||||
Ree... | 500 | 2 | Dismantled | ||||||
Ref... | 600 | 1 | Operational | ||||||
Ref... | 500 | 1 | Operational | ||||||
Ref... | 225 | 1 | Operational | ||||||
Ref... | 100 | 1 | Dismantled | ||||||
Ref... | 1,500 | 2 | Operational | ||||||
Rej... | 750 | 1 | Operational | ||||||
Rej... | 750 | 1 | Operational | ||||||
Rej... | 600 | 1 | Operational | ||||||
Rej... | 300 | 2 | Operational | ||||||
Rej... | 150 | 1 | Operational | ||||||
Rej... | 9,600 | 16 | Operational | ||||||
Rej... | 1,800 | 3 | Operational | ||||||
Rem... | 1,500 | 2 | Operational | ||||||
Ren... | 1,500 | 2 | Operational | ||||||
Ren... | 150 | 1 | Dismantled | ||||||
Res... | Dismantled | ||||||||
Res... | Dismantled | ||||||||
Res... | 225 | 1 | Operational | ||||||
Res... | 750 | 3 | Dismantled | ||||||
Rev... | 750 | 1 | Operational | ||||||
Rif... | 800 | 1 | Operational | ||||||
Rif... | 150 | 1 | Dismantled | ||||||
Rin... | 2,250 | 3 | Operational | ||||||
Rin... | 600 | 1 | Operational | ||||||
Rin... | 600 | 1 | Operational | ||||||
Rin... | 200 | 1 | Dismantled | ||||||
Ris... | 600 | 3 | Dismantled | ||||||
Ris... | 6,000 | 3 | Operational | ||||||
Ris... | 150 | 1 | Operational | ||||||
Ris... | 150 | 1 | Dismantled | ||||||
Ris... | 150 | 1 | Dismantled | ||||||
Rod... | 7,200 | 8 | Dismantled | ||||||
Rod... | 225 | 1 | Dismantled | ||||||
Rod... | 37,950 | 11 | Operational | ||||||
Rod... | 6,000 | 8 | Operational | ||||||
Rod... | 750 | 1 | Operational | ||||||
Rod... | 1,500 | 2 | Dismantled | ||||||
Rod... | 2,200 | 1 | Dismantled | ||||||
Rod... | 1,500 | 2 | Dismantled | ||||||
Rod... | 600 | 1 | Dismantled | ||||||
Rod... | 3,000 | 3 | Operational | ||||||
Rod... | 207,000 | 90 | Operational | ||||||
Roe... | 750 | 1 | Operational | ||||||
Roe... | 750 | 1 | Operational | ||||||
Roe... | 750 | 1 | Operational | ||||||
Roe... | 750 | 1 | Operational | ||||||
Rog... | 1,200 | 2 | Operational | ||||||
Rog... | 600 | 1 | Operational | ||||||
Rog... | 600 | 1 | Operational | ||||||
Rog... | 600 | 1 | Operational | ||||||
Rog... | 1,200 | 2 | Operational | ||||||
Rog... | 200 | 1 | Operational | ||||||
Roh... | 150 | 1 | Operational | ||||||
Rol... | 180 | 1 | Dismantled | ||||||
Rol... | 150 | 1 | Operational | ||||||
Rol... | 750 | 1 | Operational | ||||||
Rol... | 900 | 1 | Operational | ||||||
Rol... | 900 | 1 | Dismantled | ||||||
Rol... | 900 | 1 | Operational | ||||||
Rol... | 600 | 1 | Operational | ||||||
Rol... | 225 | 1 | Dismantled | ||||||
Rol... | 225 | 1 | Operational | ||||||
Rom... | 750 | 1 | Operational | ||||||
Rom... | 600 | 1 | Operational | ||||||
Rom... | 500 | 1 | Operational | ||||||
Rom... | 225 | 1 | Operational | ||||||
Rom... | 225 | 1 | Operational | ||||||
Rom... | 500,000 | Planned | |||||||
Rom... | 450 | 2 | Dismantled | ||||||
Ron... | 150 | 1 | Dismantled | ||||||
Ron... | 600 | 1 | Operational | ||||||
Ron... | 300 | 2 | Dismantled | ||||||
Roo... | 1,300 | 1 | Operational | ||||||
Roo... | 750 | 1 | Operational | ||||||
Roo... | 1,500 | 2 | Operational | ||||||
Roo... | 1,320 | 2 | Operational | ||||||
Ror... | 150 | 1 | Operational | ||||||
Ror... | 150 | 1 | Operational | ||||||
Ror... | 600 | 1 | Operational | ||||||
Ror... | 600 | 1 | Operational | ||||||
Ros... | 500 | 1 | Operational | ||||||
Ros... | 225 | 1 | Dismantled | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Ros... | 175 | 1 | Operational | ||||||
Ros... | 300 | 1 | Dismantled | ||||||
Ros... | 150 | 1 | Dismantled | ||||||
Rou... | 750 | 1 | Dismantled | ||||||
Rou... | 1,500 | 2 | Dismantled | ||||||
Rou... | 750 | 1 | Dismantled | ||||||
Rou... | 600 | 1 | Operational | ||||||
Rou... | 300 | 2 | Dismantled | ||||||
Rou... | 13,800 | 4 | Operational | ||||||
Rov... | 600 | 1 | Operational | ||||||
Rov... | 1,800 | 3 | Operational | ||||||
Rud... | 600 | 1 | Operational | ||||||
Rud... | 1,000 | 2 | Operational | ||||||
Rud... | 500 | 1 | Operational | ||||||
Rud... | 550 | 1 | Operational | ||||||
Rug... | 3,000 | 4 | Operational | ||||||
Rug... | 750 | 1 | Operational | ||||||
Rut... | 675 | 3 | Operational | ||||||
Rut... | 660 | 1 | Operational | ||||||
Rut... | 3,900 | 3 | Operational | ||||||
Rut... | 5,250 | 3 | Operational | ||||||
Rut... | 675 | 3 | Dismantled | ||||||
Rya... | 7,500 | 5 | Operational | ||||||
Ryb... | 200 | 1 | Dismantled | ||||||
Ryb... | 600 | 1 | Operational | ||||||
Ryb... | 1,200 | 2 | Operational | ||||||
Ryb... | 600 | 1 | Operational | ||||||
Ryb... | 600 | 1 | Operational | ||||||
Ryb... | 600 | 1 | Operational | ||||||
Ryb... | 600 | 1 | Operational | ||||||
Ryb... | 600 | 1 | Operational | ||||||
Ryb... | 150 | 1 | Dismantled | ||||||
Ryb... | 150 | 1 | Dismantled | ||||||
Ryd... | 1,200 | 2 | Operational | ||||||
Ryd... | 600 | 1 | Operational | ||||||
Rys... | 4,000 | 1 | Dismantled | ||||||
Rys... | 6,000 | 1 | Dismantled | ||||||
Rys... | 2,300 | 1 | Dismantled | ||||||
Rys... | 2,200 | 1 | Dismantled | ||||||
Rys... | 3,000 | 1 | Dismantled | ||||||
Rys... | 2,000 | 1 | Dismantled | ||||||
Rys... | 2,000 | 1 | Operational | ||||||
Rys... | 5,000 | 1 | Operational | ||||||
Ræh... | 4,200 | 7 | Operational | ||||||
Ræh... | 600 | 1 | Operational | ||||||
Rær... | 600 | 1 | Operational | ||||||
Rær... | 600 | 1 | Operational | ||||||
Røn... | 8,000 | 4 | Operational | ||||||
Røn... | 9,200 | 4 | Operational | ||||||
Sah... | 6,900 | 3 | Operational | ||||||
Sak... | 150 | 1 | Operational | ||||||
Sal... | 1,200 | 2 | Operational | ||||||
Sal... | 600 | 1 | Operational | ||||||
Sal... | 3,750 | 5 | Operational | ||||||
Sal... | 750 | 1 | Operational | ||||||
Sal... | 1,500 | 2 | Operational | ||||||
Sal... | 3,000 | 1 | Operational | ||||||
Sal... | 600 | 1 | Operational | ||||||
Sal... | 750 | 1 | Operational | ||||||
Sal... | 600 | 1 | Operational | ||||||
Sal... | 10,800 | 3 | Operational | ||||||
Sal... | 4,600 | 2 | Operational | ||||||
Sam... | 20,700 | 9 | Operational | ||||||
Sam... | 2,300 | 1 | Dismantled | ||||||
Sam... | 2,300 | 1 | Operational | ||||||
San... | 450 | 2 | Dismantled | ||||||
San... | 225 | 1 | Dismantled | ||||||
San... | 200 | 1 | Operational | ||||||
San... | 750 | 1 | Operational | ||||||
San... | 1,000 | 2 | Operational | ||||||
San... | 1,200 | 2 | Operational | ||||||
San... | 600 | 1 | Operational | ||||||
San... | 6,600 | 4 | Operational | ||||||
San... | 500 | 1 | Operational | ||||||
San... | 300 | 2 | Dismantled | ||||||
San... | 750 | 1 | Operational | ||||||
San... | 750 | 1 | Operational | ||||||
San... | 8,400 | 2 | Operational | ||||||
Sdr... | 2,250 | 3 | Operational | ||||||
Sdr... | 9,000 | 15 | Operational | ||||||
Sdr... | 1,200 | 2 | Operational | ||||||
Sdr... | 660 | 1 | Operational | ||||||
Sdr... | 1,320 | 2 | Operational | ||||||
Sdr... | 225 | 1 | Operational | ||||||
Sdr... | 6,000 | 10 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Sdr... | 1,200 | 2 | Operational | ||||||
Sdr... | 450 | 3 | Dismantled | ||||||
Sdr... | 450 | 3 | Dismantled | ||||||
Seg... | 1,300 | 1 | Operational | ||||||
Seg... | 600 | 1 | Operational | ||||||
Sej... | 225 | 1 | Operational | ||||||
Sej... | 200 | 1 | Dismantled | ||||||
Sej... | 200 | 1 | Dismantled | ||||||
Sej... | 200 | 1 | Dismantled | ||||||
Sej... | 800 | 1 | Operational | ||||||
Sej... | 1,320 | 2 | Operational | ||||||
Sek... | 600 | 1 | Operational | ||||||
Sek... | 600 | 1 | Operational | ||||||
Sel... | 150 | 1 | Dismantled | ||||||
Sel... | 450 | 3 | Dismantled | ||||||
Sem... | 660 | 1 | Operational | ||||||
Sen... | 2,700 | 3 | Operational | ||||||
Sen... | 900 | 1 | Operational | ||||||
Sen... | 750 | 1 | Operational | ||||||
Sen... | 750 | 1 | Operational | ||||||
Sev... | 900 | 1 | Operational | ||||||
Sid... | 660 | 1 | Operational | ||||||
Sid... | 180 | 1 | Operational | ||||||
Sig... | 1,200 | 2 | Operational | ||||||
Sig... | 600 | 1 | Operational | ||||||
Sil... | 600 | 1 | Operational | ||||||
Sim... | 300 | 2 | Dismantled | ||||||
Sim... | 600 | 1 | Operational | ||||||
Sim... | 600 | 1 | Dismantled | ||||||
Sim... | 300 | 2 | Dismantled | ||||||
Sim... | 660 | 1 | Operational | ||||||
Sin... | Dismantled | ||||||||
Sin... | 600 | 1 | Operational | ||||||
Sin... | 1,000 | 1 | Operational | ||||||
Sin... | 1,000 | 1 | Operational | ||||||
Sin... | 1,200 | 2 | Operational | ||||||
Sin... | 200 | 1 | Dismantled | ||||||
Sin... | 200 | 1 | Dismantled | ||||||
Sin... | 200 | 1 | Dismantled | ||||||
Sin... | 225 | 1 | Dismantled | ||||||
Sir... | 1,650 | 1 | Operational | ||||||
Sir... | 1,650 | 1 | Operational | ||||||
Sjo... | 1,800 | 2 | Operational | ||||||
Sjo... | 850 | 1 | Operational | ||||||
Sjo... | 225 | 1 | Dismantled | ||||||
Sjo... | 150 | 1 | Dismantled | ||||||
Sjo... | 130 | 1 | Dismantled | ||||||
Sjo... | 200 | 1 | Dismantled | ||||||
Sjo... | 150 | 1 | Operational | ||||||
Sjæ... | 150 | 1 | Dismantled | ||||||
Sjæ... | 150 | 1 | Dismantled | ||||||
Ska... | 225 | 1 | Operational | ||||||
Ska... | 750 | 1 | Operational | ||||||
Ska... | 1,800 | 2 | Operational | ||||||
Ska... | 220 | 1 | Dismantled | ||||||
Ska... | 250 | 1 | Dismantled | ||||||
Ska... | 3,000 | 4 | Operational | ||||||
Ska... | 200 | 1 | Dismantled | ||||||
Ska... | 3,000 | 5 | Operational | ||||||
Ska... | 500 | 1 | Dismantled | ||||||
Ska... | 300 | 2 | Dismantled | ||||||
Ska... | 660 | 1 | Operational | ||||||
Ska... | 660 | 1 | Operational | ||||||
Ska... | 750 | 1 | Operational | ||||||
Ska... | 1,500 | 2 | Operational | ||||||
Ska... | 150 | 1 | Dismantled | ||||||
Ska... | 300 | 2 | Dismantled | ||||||
Ska... | 450 | 3 | Operational | ||||||
Ska... | 3,500 | 2 | Operational | ||||||
Ska... | 2,700 | 3 | Operational | ||||||
Ska... | 450 | 2 | Operational | ||||||
Ska... | 450 | 2 | Operational | ||||||
Ska... | Dismantled | ||||||||
Ska... | 225 | 1 | Dismantled | ||||||
Ska... | 1,200 | 2 | Operational | ||||||
Ska... | 600 | 1 | Operational | ||||||
Ska... | 750 | 1 | Operational | ||||||
Ske... | 500 | 1 | Operational | ||||||
Ske... | 150 | 1 | Operational | ||||||
Ske... | 150 | 1 | Operational | ||||||
Ske... | 450 | 1 | Operational | ||||||
Ske... | 450 | 1 | Operational | ||||||
Ske... | 2,000 | 2 | Operational | ||||||
Ske... | 300 | 2 | Dismantled | ||||||
Ske... | 150 | 1 | Dismantled | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Ske... | 150 | 1 | Dismantled | ||||||
Ske... | 150 | 1 | Dismantled | ||||||
Ski... | 160 | 1 | Operational | ||||||
Ski... | 1,100 | 2 | Operational | ||||||
Ski... | 550 | 1 | Operational | ||||||
Ski... | 150 | 1 | Operational | ||||||
Ski... | 250 | 1 | Dismantled | ||||||
Ski... | 250 | 1 | Dismantled | ||||||
Ski... | 1,200 | 2 | Operational | ||||||
Ski... | 660 | 1 | Operational | ||||||
Ski... | 675 | 3 | Operational | ||||||
Ski... | 225 | 1 | Operational | ||||||
Ski... | 225 | 1 | Dismantled | ||||||
Skj... | 750 | 1 | Operational | ||||||
Skj... | 1,000 | 1 | Operational | ||||||
Skj... | 2,000 | 2 | Operational | ||||||
Skj... | 225 | 1 | Operational | ||||||
Skj... | 225 | 1 | Dismantled | ||||||
Skj... | 225 | 1 | Operational | ||||||
Skj... | 200 | 1 | Dismantled | ||||||
Skj... | 200 | 1 | Dismantled | ||||||
Skj... | 150 | 1 | Dismantled | ||||||
Skj... | 100 | 1 | Dismantled | ||||||
Sko... | 660 | 1 | Operational | ||||||
Sko... | 660 | 1 | Operational | ||||||
Sko... | 1,200 | 2 | Operational | ||||||
Sko... | 1,200 | 2 | Operational | ||||||
Sko... | 1,200 | 2 | Operational | ||||||
Sko... | 600 | 1 | Operational | ||||||
Sko... | 600 | 1 | Operational | ||||||
Sko... | 7,200 | 2 | Operational | ||||||
Sko... | 130 | 1 | Dismantled | ||||||
Sko... | 150 | 1 | Dismantled | ||||||
Sko... | Dismantled | ||||||||
Sko... | 2,400 | 4 | Operational | ||||||
Sko... | 600 | 1 | Operational | ||||||
Sko... | 1,800 | 3 | Operational | ||||||
Sko... | 4,200 | 7 | Operational | ||||||
Sko... | 5,200 | 4 | Operational | ||||||
Skr... | 750 | 1 | Operational | ||||||
Skr... | 750 | 1 | Operational | ||||||
Skr... | 2,640 | 4 | Operational | ||||||
Skr... | 600 | 1 | Operational | ||||||
Skr... | 600 | 1 | Operational | ||||||
Skr... | 1,200 | 2 | Operational | ||||||
Skr... | 600 | 1 | Operational | ||||||
Sku... | 1,980 | 3 | Operational | ||||||
Sku... | 500 | 1 | Operational | ||||||
Sku... | 2,000 | 4 | Operational | ||||||
Sku... | 450 | 2 | Dismantled | ||||||
Skæ... | 150 | 1 | Operational | ||||||
Skæ... | 660 | 1 | Operational | ||||||
Skæ... | 600 | 1 | Operational | ||||||
Skæ... | 600 | 1 | Dismantled | ||||||
Skæ... | 3,150 | 1 | Dismantled | ||||||
Skæ... | 4,200 | 1 | Operational | ||||||
Skæ... | 600 | 1 | Operational | ||||||
Skæ... | 1,200 | 2 | Operational | ||||||
Skæ... | 150 | 1 | Operational | ||||||
Skæ... | 660 | 1 | Operational | ||||||
Slu... | 400 | 2 | Operational | ||||||
Slu... | 160 | 1 | Dismantled | ||||||
Sme... | 1,980 | 3 | Operational | ||||||
Sme... | 200 | 1 | Dismantled | ||||||
Sme... | 150 | 1 | Dismantled | ||||||
Sme... | 225 | 1 | Operational | ||||||
Sme... | 225 | 1 | Operational | ||||||
Smi... | 180 | 1 | Dismantled | ||||||
Smi... | 3,000 | 4 | Operational | ||||||
Smi... | 150 | 1 | Operational | ||||||
Smi... | 150 | 1 | Operational | ||||||
Smo... | 600 | 1 | Operational | ||||||
Smo... | 200 | 1 | Dismantled | ||||||
Sne... | 150 | 1 | Operational | ||||||
Sne... | 100 | 1 | Dismantled | ||||||
Sne... | 450 | 3 | Operational | ||||||
Sne... | 320 | 2 | Dismantled | ||||||
Sne... | 180 | 1 | Dismantled | ||||||
Sne... | 150 | 1 | Operational | ||||||
Sne... | 225 | 1 | Dismantled | ||||||
Sne... | 130 | 1 | Operational | ||||||
Sne... | 1,000 | 1 | Operational | ||||||
Sne... | 1,650 | 1 | Operational | ||||||
Sne... | 130 | 1 | Dismantled | ||||||
Sne... | 160 | 1 | Dismantled | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Sno... | 150 | 1 | Dismantled | ||||||
Sno... | 150 | 1 | Dismantled | ||||||
Snæ... | 250 | 1 | Dismantled | ||||||
Snæ... | 3,000 | 1 | Operational | ||||||
Sob... | 200 | 1 | Dismantled | ||||||
Sob... | 900 | 1 | Operational | ||||||
Sob... | 750 | 1 | Operational | ||||||
Sob... | 750 | 1 | Operational | ||||||
Sob... | 750 | 1 | Operational | ||||||
Sob... | 2,250 | 3 | Operational | ||||||
Sob... | 750 | 1 | Operational | ||||||
Sob... | 300 | 1 | Operational | ||||||
Sob... | 750 | 1 | Operational | ||||||
Sob... | 750 | 1 | Operational | ||||||
Sod... | 150 | 1 | Operational | ||||||
Sod... | 11,500 | 5 | Operational | ||||||
Sof... | 225 | 1 | Operational | ||||||
Sog... | 2,925 | 13 | Dismantled | ||||||
Sog... | 100 | 1 | Dismantled | ||||||
Sog... | 750 | 1 | Operational | ||||||
Sog... | 3,000 | 1 | Operational | ||||||
Sog... | 12,000 | 4 | Operational | ||||||
Sog... | 850 | 1 | Operational | ||||||
Sog... | 100 | 1 | Dismantled | ||||||
Sol... | 2,250 | 3 | Operational | ||||||
Sol... | 1,320 | 2 | Operational | ||||||
Sol... | 200 | 1 | Operational | ||||||
Sol... | 14,400 | 4 | Operational | ||||||
Sol... | 1,600 | 2 | Operational | ||||||
Sol... | 600 | 2 | Operational | ||||||
Sol... | 200 | 1 | Operational | ||||||
Sol... | 130 | 1 | Dismantled | ||||||
Som... | 660 | 1 | Operational | ||||||
Som... | 660 | 1 | Operational | ||||||
Som... | 150 | 1 | Dismantled | ||||||
Son... | 300 | 1 | Operational | ||||||
Son... | 3,000 | 3 | Operational | ||||||
Son... | 600 | 1 | Operational | ||||||
Son... | 150 | 1 | Dismantled | ||||||
Son... | 900 | 1 | Operational | ||||||
Son... | 200 | 1 | Dismantled | ||||||
Son... | 1,320 | 2 | Operational | ||||||
Son... | 660 | 1 | Operational | ||||||
Son... | 600 | 1 | Operational | ||||||
Son... | 285,000 | Planned | |||||||
Son... | 150 | 1 | Dismantled | ||||||
Son... | 500 | 2 | Dismantled | ||||||
Son... | 900 | 2 | Operational | ||||||
Son... | 130 | 1 | Dismantled | ||||||
Son... | 600 | 1 | Operational | ||||||
Son... | 675 | 3 | Operational | ||||||
Son... | 900 | 1 | Operational | ||||||
Son... | 900 | 1 | Operational | ||||||
Son... | 1,200 | 2 | Operational | ||||||
Son... | 225 | 1 | Operational | ||||||
Son... | 4,000 | 4 | Operational | ||||||
Son... | 4,500 | 5 | Operational | ||||||
Son... | 500 | 1 | Operational | ||||||
Son... | 120 | 1 | Dismantled | ||||||
Sor... | 600 | 1 | Operational | ||||||
Sor... | 2,300 | 1 | Operational | ||||||
Sor... | 150 | 1 | Dismantled | ||||||
Sor... | 1,200 | 2 | Operational | ||||||
Sor... | 600 | 1 | Operational | ||||||
Sor... | 225 | 1 | Operational | ||||||
Sor... | 150 | 1 | Dismantled | ||||||
Sor... | 1,800 | 3 | Operational | ||||||
Sos... | 150 | 1 | Dismantled | ||||||
Sot... | 750 | 1 | Operational | ||||||
Sov... | 750 | 1 | Operational | ||||||
Sov... | 660 | 1 | Operational | ||||||
Spe... | 600 | 1 | Operational | ||||||
Spj... | 1,500 | 2 | Operational | ||||||
Spo... | 660 | 1 | Operational | ||||||
Spr... | 21,000 | 7 | Operational | ||||||
Spr... | 300 | 2 | Operational | ||||||
St ... | 4,500 | 6 | Operational | ||||||
St ... | 200 | 1 | Dismantled | ||||||
St.... | 660 | 1 | Operational | ||||||
St.... | 660 | 1 | Operational | ||||||
St.... | 660 | 1 | Operational | ||||||
St.... | 250 | 1 | Dismantled | ||||||
St.... | 150 | 1 | Operational | ||||||
Sta... | 225 | 1 | Dismantled | ||||||
Sta... | 225 | 1 | Dismantled | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Sta... | 450 | 3 | Dismantled | ||||||
Sta... | 1,200 | 2 | Operational | ||||||
Sta... | 600 | 1 | Operational | ||||||
Sta... | 225 | 1 | Dismantled | ||||||
Sta... | 225 | 1 | Operational | ||||||
Sta... | 900 | 1 | Operational | ||||||
Sta... | 500 | 1 | Operational | ||||||
Sta... | 300 | 1 | Operational | ||||||
Sta... | 225 | 1 | Dismantled | ||||||
Sta... | 450 | 2 | Dismantled | ||||||
Sta... | 100 | 1 | Dismantled | ||||||
Sta... | 1,200 | 2 | Operational | ||||||
Sta... | 2,250 | 3 | Operational | ||||||
Sta... | 750 | 1 | Operational | ||||||
Sta... | 750 | 1 | Operational | ||||||
Sta... | 150 | 1 | Dismantled | ||||||
Sta... | 600 | 1 | Operational | ||||||
Sta... | 600 | 1 | Operational | ||||||
Sta... | 150 | 1 | Dismantled | ||||||
Sta... | 5,400 | 9 | Operational | ||||||
Sta... | 750 | 1 | Operational | ||||||
Sta... | 750 | 1 | Operational | ||||||
Sta... | 600 | 1 | Operational | ||||||
Sta... | 225 | 1 | Operational | ||||||
Sta... | 175 | 1 | Operational | ||||||
Sta... | 1,800 | 2 | Operational | ||||||
Sta... | 360 | 2 | Operational | ||||||
Ste... | 600 | 1 | Operational | ||||||
Ste... | 600 | 1 | Operational | ||||||
Ste... | 150 | 1 | Dismantled | ||||||
Ste... | 2,600 | 2 | Operational | ||||||
Ste... | 1,000 | 1 | Operational | ||||||
Ste... | 150 | 1 | Dismantled | ||||||
Ste... | 150 | 1 | Dismantled | ||||||
Ste... | 1,200 | 2 | Operational | ||||||
Ste... | 600 | 1 | Operational | ||||||
Ste... | 600 | 1 | Operational | ||||||
Ste... | 145 | 1 | Dismantled | ||||||
Ste... | 750 | 1 | Operational | ||||||
Ste... | 1,200 | 2 | Operational | ||||||
Ste... | 1,200 | 2 | Operational | ||||||
Ste... | 250 | 1 | Dismantled | ||||||
Ste... | 200 | 1 | Dismantled | ||||||
Ste... | 10,350 | 3 | Operational | ||||||
Ste... | 1,300 | 1 | Operational | ||||||
Ste... | 160 | 1 | Dismantled | ||||||
Ste... | 150 | 1 | Dismantled | ||||||
Ste... | 150 | 1 | Dismantled | ||||||
Ste... | 350,000 | Planned | |||||||
Sti... | 1,350 | 3 | Dismantled | ||||||
Sti... | 1,980 | 3 | Operational | ||||||
Sti... | 360 | 2 | Dismantled | ||||||
Stj... | 150 | 1 | Dismantled | ||||||
Stj... | 150 | 1 | Dismantled | ||||||
Sto... | 300 | 1 | Operational | ||||||
Sto... | 600 | 1 | Operational | ||||||
Sto... | 150 | 1 | Dismantled | ||||||
Sto... | 1,000 | 1 | Operational | ||||||
Sto... | 150 | 1 | Dismantled | ||||||
Sto... | 150 | 1 | Dismantled | ||||||
Sto... | 210,000 | Planned | |||||||
Sto... | 550 | 1 | Operational | ||||||
Sto... | 160 | 1 | Dismantled | ||||||
Sto... | 150 | 1 | Dismantled | ||||||
Sto... | 750 | 1 | Operational | ||||||
Sto... | 1,800 | 3 | Operational | ||||||
Sto... | Dismantled | ||||||||
Sto... | Dismantled | ||||||||
Sto... | 250 | 1 | Operational | ||||||
Sto... | 250 | 1 | Operational | ||||||
Sto... | 600 | 1 | Operational | ||||||
Sto... | 1,200 | 2 | Operational | ||||||
Sto... | 150 | 1 | Dismantled | ||||||
Sto... | 150 | 1 | Dismantled | ||||||
Sto... | 150 | 1 | Dismantled | ||||||
Sto... | 150 | 1 | Operational | ||||||
Sto... | 150 | 1 | Dismantled | ||||||
Sto... | 250 | 1 | Dismantled | ||||||
Sto... | 150 | 1 | Dismantled | ||||||
Sto... | 130 | 1 | Dismantled | ||||||
Sto... | 300 | 2 | Dismantled | ||||||
Sto... | 750 | 1 | Operational | ||||||
Sto... | 1,800 | 3 | Operational | ||||||
Sto... | 250 | 1 | Dismantled | ||||||
Sto... | 750 | 1 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Sto... | 300 | 1 | Dismantled | ||||||
Sto... | 600 | 1 | Operational | ||||||
Str... | 200 | 1 | Dismantled | ||||||
Str... | 100 | 1 | Dismantled | ||||||
Str... | 6,000 | 2 | Operational | ||||||
Str... | 200 | 1 | Dismantled | ||||||
Str... | 600 | 1 | Operational | ||||||
Str... | 225 | 1 | Dismantled | ||||||
Str... | 130 | 1 | Operational | ||||||
Stu... | 660 | 1 | Operational | ||||||
Stu... | 2,000 | 1 | Operational | ||||||
Stu... | 2,000 | 1 | Operational | ||||||
Stu... | 2,250 | 3 | Operational | ||||||
Sty... | 660 | 1 | Operational | ||||||
Sty... | 660 | 1 | Operational | ||||||
Sul... | 600 | 1 | Operational | ||||||
Sun... | 225 | 1 | Operational | ||||||
Sun... | 200 | 1 | Dismantled | ||||||
Sun... | 100 | 1 | Dismantled | ||||||
Sun... | 225 | 1 | Operational | ||||||
Sun... | 750 | 1 | Operational | ||||||
Sva... | 1,500 | 2 | Operational | ||||||
Sva... | 225 | 1 | Operational | ||||||
Sva... | 225 | 1 | Operational | ||||||
Sva... | 150 | 1 | Operational | ||||||
Sva... | 200 | 1 | Operational | ||||||
Sve... | 1,000 | 1 | Operational | ||||||
Sve... | 750 | 1 | Operational | ||||||
Sve... | 270 | 1 | Operational | ||||||
Sve... | 2,250 | 3 | Operational | ||||||
Svi... | 225 | 1 | Dismantled | ||||||
Svi... | 12,800 | 4 | Operational | ||||||
Svi... | 19,200 | 6 | Operational | ||||||
Svi... | 600 | 1 | Operational | ||||||
Svi... | 150 | 1 | Dismantled | ||||||
Svi... | 3,600 | 6 | Operational | ||||||
Svi... | 1,350 | 3 | Operational | ||||||
Svi... | 250 | 1 | Dismantled | ||||||
Svi... | 200 | 1 | Dismantled | ||||||
Svo... | 900 | 3 | Operational | ||||||
SWT... | 6,000 | 1 | Operational | ||||||
Syd... | 750 | 1 | Operational | ||||||
Syd... | 1,500 | 2 | Operational | ||||||
Syd... | 225 | 1 | Dismantled | ||||||
Syd... | 500 | 2 | Dismantled | ||||||
Syd... | 150 | 1 | Dismantled | ||||||
Syl... | 26,250 | 35 | Operational | ||||||
Sæb... | 200 | 1 | Dismantled | ||||||
Sæd... | 10,800 | 3 | Operational | ||||||
Sæd... | 10,800 | 3 | Operational | ||||||
Sæd... | 6,000 | 3 | Operational | ||||||
Sær... | 1,800 | 3 | Operational | ||||||
Sær... | 1,200 | 2 | Operational | ||||||
Sæs... | 200 | 1 | Dismantled | ||||||
Søl... | 3,000 | 1 | Operational | ||||||
Søl... | 6,000 | 2 | Operational | ||||||
Taa... | 850 | 1 | Operational | ||||||
Tam... | 150 | 1 | Operational | ||||||
Tam... | 1,500 | 2 | Operational | ||||||
Tan... | 150 | 1 | Dismantled | ||||||
Tan... | 300 | 2 | Dismantled | ||||||
Tan... | 3,000 | 3 | Operational | ||||||
Tar... | 130 | 1 | Dismantled | ||||||
Tar... | 1,700 | 2 | Operational | ||||||
Tar... | 600 | 1 | Operational | ||||||
Tar... | 660 | 1 | Operational | ||||||
Tar... | 1,980 | 3 | Operational | ||||||
Tar... | 500 | 1 | Operational | ||||||
Tar... | 500 | 1 | Operational | ||||||
Tar... | 150 | 1 | Dismantled | ||||||
Tar... | 6,600 | 10 | Operational | ||||||
Tar... | 1,320 | 2 | Operational | ||||||
Tar... | 150 | 1 | Dismantled | ||||||
Tar... | 150 | 1 | Dismantled | ||||||
Tar... | 150 | 1 | Dismantled | ||||||
Tar... | 160 | 1 | Dismantled | ||||||
Tar... | 750 | 1 | Operational | ||||||
Tar... | 750 | 1 | Operational | ||||||
Tar... | 1,200 | 2 | Operational | ||||||
Tar... | 150 | 1 | Dismantled | ||||||
Tar... | 200 | 1 | Operational | ||||||
Tar... | 2,550 | 3 | Operational | ||||||
Teb... | 1,800 | 3 | Operational | ||||||
Tee... | 1,800 | 3 | Operational | ||||||
Ter... | 1,800 | 3 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Ter... | 500 | 2 | Dismantled | ||||||
Tes... | 300 | 2 | Dismantled | ||||||
Thi... | 1,320 | 2 | Operational | ||||||
Thi... | 660 | 1 | Operational | ||||||
Thi... | 150 | 1 | Dismantled | ||||||
Thi... | 900 | 4 | Operational | ||||||
Thi... | 4,200 | 1 | Operational | ||||||
Thi... | 2,200 | 1 | Operational | ||||||
Thi... | 225 | 1 | Operational | ||||||
Tho... | 1,008,000 | Approved | |||||||
Tho... | 200 | 1 | Dismantled | ||||||
Tho... | 200 | 1 | Dismantled | ||||||
Tho... | 12,000 | 4 | Operational | ||||||
Tho... | 1,700 | 2 | Operational | ||||||
Tho... | 3,000 | 1 | Operational | ||||||
Tho... | 4,500 | 6 | Dismantled | ||||||
Tho... | 21,500 | 5 | Operational | ||||||
Thy... | 4,000,000 | Planned | |||||||
Thy... | 1,760,000 | Planned | |||||||
Thy... | 3,600 | 1 | Dismantled | ||||||
Thy... | 15,000 | 1 | Operational | ||||||
Thy... | 150 | 1 | Dismantled | ||||||
Tim... | 3,600 | 1 | Dismantled | ||||||
Tim... | 4,500 | 3 | Operational | ||||||
Tim... | 3,600 | 1 | Dismantled | ||||||
Tim... | 3,600 | 1 | Dismantled | ||||||
Tim... | 3,825 | 17 | Dismantled | ||||||
Tim... | 30,000 | 5 | Operational | ||||||
Tim... | 3,000 | 3 | Operational | ||||||
Tim... | 3,000 | 3 | Operational | ||||||
Tim... | 1,000 | 1 | Operational | ||||||
Tim... | 3,400 | 4 | Operational | ||||||
Tin... | 400 | 2 | Operational | ||||||
Tin... | 750 | 1 | Operational | ||||||
Tin... | 300 | 2 | Dismantled | ||||||
Tir... | 660 | 1 | Operational | ||||||
Tir... | 1,300 | 1 | Operational | ||||||
Tir... | 1,300 | 1 | Operational | ||||||
Tir... | 660 | 1 | Operational | ||||||
Tir... | 660 | 1 | Operational | ||||||
Tir... | 600 | 1 | Operational | ||||||
Tir... | 660 | 1 | Operational | ||||||
Tir... | 660 | 1 | Operational | ||||||
Tir... | 150 | 1 | Dismantled | ||||||
Tis... | 150 | 1 | Dismantled | ||||||
Tis... | 150 | 1 | Dismantled | ||||||
Tis... | 10,800 | 3 | Operational | ||||||
Tis... | 150 | 1 | Dismantled | ||||||
Tis... | 200 | 1 | Dismantled | ||||||
Tja... | 11,500 | 4 | Operational | ||||||
Tja... | 225 | 1 | Operational | ||||||
Tja... | 2,000 | 1 | Operational | ||||||
Tja... | 1,000 | 1 | Dismantled | ||||||
Tja... | 2,500 | 1 | Operational | ||||||
Tja... | 2,000 | 1 | Operational | ||||||
Tja... | Dismantled | ||||||||
Tja... | Dismantled | ||||||||
Tja... | Dismantled | ||||||||
Tjo... | 600 | 1 | Dismantled | ||||||
Tjo... | 225 | 1 | Operational | ||||||
Tjo... | 6,000 | 2 | Operational | ||||||
Tjo... | 6,000 | 2 | Operational | ||||||
Tjo... | 3,000 | 1 | Operational | ||||||
Tjo... | 1,800 | 3 | Operational | ||||||
Tjo... | 2,300 | 1 | Operational | ||||||
Tjæ... | 17,000 | 7 | Operational | ||||||
Tjæ... | 600 | 3 | Dismantled | ||||||
Tjæ... | Dismantled | ||||||||
Tjæ... | 250 | 1 | Operational | ||||||
Tjæ... | 900 | 2 | Operational | ||||||
Tob... | 1,800 | 2 | Operational | ||||||
Tod... | 150 | 1 | Dismantled | ||||||
Tod... | 1,600 | 2 | Operational | ||||||
Tof... | 600 | 1 | Operational | ||||||
Tof... | 200 | 1 | Dismantled | ||||||
Tof... | 200 | 1 | Dismantled | ||||||
Tof... | 400 | 2 | Dismantled | ||||||
Tof... | 600 | 3 | Operational | ||||||
Toh... | 1,800 | 2 | Operational | ||||||
Tok... | 160 | 1 | Dismantled | ||||||
Tol... | 250 | 1 | Dismantled | ||||||
Tol... | 150 | 1 | Dismantled | ||||||
Tol... | 150 | 1 | Dismantled | ||||||
Tol... | 780 | 6 | Dismantled | ||||||
Ton... | 1,500 | 2 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Ton... | 300 | 2 | Dismantled | ||||||
Ton... | 850 | 1 | Operational | ||||||
Ton... | 850 | 1 | Operational | ||||||
Ton... | 850 | 1 | Operational | ||||||
Ton... | 150 | 1 | Dismantled | ||||||
Ton... | 800 | 1 | Operational | ||||||
Too... | 900 | 1 | Operational | ||||||
Too... | 1,800 | 2 | Dismantled | ||||||
Too... | 900 | 1 | Dismantled | ||||||
Tor... | 1,500 | 2 | Operational | ||||||
Tor... | 150 | 1 | Dismantled | ||||||
Tor... | 150 | 1 | Dismantled | ||||||
Tor... | 1,200 | 2 | Operational | ||||||
Tor... | 225 | 1 | Dismantled | ||||||
Tor... | 225 | 1 | Dismantled | ||||||
Tor... | 225 | 1 | Dismantled | ||||||
Tor... | 150 | 1 | Dismantled | ||||||
Tor... | 1,200 | 2 | Operational | ||||||
Tor... | 600 | 1 | Operational | ||||||
Tor... | 660 | 1 | Operational | ||||||
Tor... | 800 | 1 | Operational | ||||||
Tor... | 660 | 1 | Operational | ||||||
Tor... | 750 | 1 | Operational | ||||||
Tor... | 750 | 1 | Operational | ||||||
Tor... | 600 | 1 | Operational | ||||||
Tor... | 2,000 | 2 | Operational | ||||||
Tor... | 600 | 1 | Operational | ||||||
Tor... | 2,700 | 3 | Operational | ||||||
Tor... | 500 | 1 | Operational | ||||||
Tor... | 225 | 1 | Operational | ||||||
Tor... | 200 | 1 | Dismantled | ||||||
Tor... | 225 | 1 | Operational | ||||||
Tor... | 1,500 | 2 | Operational | ||||||
Tor... | 1,500 | 2 | Operational | ||||||
Tor... | 750 | 1 | Operational | ||||||
Tor... | 1,200 | 2 | Dismantled | ||||||
Tor... | 150 | 1 | Dismantled | ||||||
Tor... | 150 | 1 | Dismantled | ||||||
Tor... | 600 | 1 | Dismantled | ||||||
Tor... | 600 | 1 | Dismantled | ||||||
Tor... | 150 | 1 | Dismantled | ||||||
Tor... | 150 | 1 | Dismantled | ||||||
Tor... | 150 | 1 | Dismantled | ||||||
Tor... | 12,000 | 4 | Operational | ||||||
Tor... | 750 | 1 | Operational | ||||||
Tor... | 750 | 1 | Operational | ||||||
Tor... | 1,800 | 3 | Operational | ||||||
Tor... | 300 | 2 | Dismantled | ||||||
Tor... | 225 | 1 | Dismantled | ||||||
Tor... | 150 | 1 | Operational | ||||||
Tor... | 150 | 1 | Dismantled | ||||||
Tor... | 300 | 2 | Dismantled | ||||||
Tor... | 225 | 1 | Dismantled | ||||||
Tor... | 450 | 2 | Dismantled | ||||||
Tor... | 225 | 1 | Operational | ||||||
Tor... | 150 | 1 | Operational | ||||||
Tor... | 450 | 1 | Operational | ||||||
Tor... | 6,400 | 2 | Operational | ||||||
Tos... | 100 | 1 | Dismantled | ||||||
Tot... | 150 | 1 | Dismantled | ||||||
Tou... | 225 | 1 | Operational | ||||||
Tov... | 750 | 1 | Operational | ||||||
Tov... | 1,800 | 3 | Operational | ||||||
Tre... | 300 | 1 | Operational | ||||||
Tre... | 300 | 2 | Dismantled | ||||||
Tre... | 300 | 1 | Dismantled | ||||||
Tro... | 150 | 1 | Dismantled | ||||||
Tro... | 4,000 | 4 | Operational | ||||||
Tro... | 600 | 1 | Operational | ||||||
Tru... | 750 | 1 | Operational | ||||||
Tru... | 500 | 1 | Operational | ||||||
Tru... | 4,400 | 2 | Operational | ||||||
Try... | 660 | 1 | Operational | ||||||
Try... | 1,500 | 1 | Operational | ||||||
Try... | 900 | 1 | Operational | ||||||
Try... | 800 | 1 | Operational | ||||||
Try... | 300 | 2 | Dismantled | ||||||
Try... | 150 | 1 | Dismantled | ||||||
Try... | 1,320 | 2 | Operational | ||||||
Try... | 600 | 1 | Operational | ||||||
Træ... | 150 | 1 | Operational | ||||||
Træ... | 150 | 1 | Dismantled | ||||||
Tul... | 150 | 1 | Dismantled | ||||||
Tul... | 1,000 | 1 | Operational | ||||||
Tul... | 1,800 | 2 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Tul... | 750 | 5 | Dismantled | ||||||
Tul... | 2,550 | 3 | Operational | ||||||
Tum... | 750 | 1 | Operational | ||||||
Tum... | 1,500 | 2 | Operational | ||||||
Tun... | 5,000 | 10 | Operational | ||||||
Tur... | 10,350 | 3 | Operational | ||||||
Tur... | 6,600 | 2 | Operational | ||||||
Tve... | 1,200 | 2 | Operational | ||||||
Tve... | 600 | 1 | Operational | ||||||
Tve... | 1,500 | 2 | Operational | ||||||
Tve... | 750 | 1 | Operational | ||||||
Tve... | 750 | 1 | Operational | ||||||
Tve... | 150 | 1 | Dismantled | ||||||
Tvi... | 1,000 | 1 | Operational | ||||||
Tvi... | 1,000 | 1 | Operational | ||||||
Tvi... | 5,400 | 6 | Operational | ||||||
Tvi... | 1,800 | 2 | Operational | ||||||
Tvo... | 150 | 1 | Dismantled | ||||||
Tvo... | 225 | 1 | Operational | ||||||
Tyr... | 150 | 1 | Dismantled | ||||||
Tyv... | 1,500 | 2 | Operational | ||||||
Tyv... | 750 | 1 | Operational | ||||||
Tyv... | 600 | 1 | Operational | ||||||
Tyv... | 600 | 1 | Operational | ||||||
Tyv... | 2,000 | 4 | Operational | ||||||
Tyv... | 500 | 1 | Dismantled | ||||||
Tæb... | 225 | 1 | Operational | ||||||
Ubb... | 150 | 1 | Dismantled | ||||||
Ubb... | 750 | 1 | Operational | ||||||
Ubb... | 300 | 2 | Dismantled | ||||||
Udb... | 250 | 1 | Dismantled | ||||||
Udb... | 600 | 1 | Operational | ||||||
Udb... | 300 | 1 | Operational | ||||||
Udb... | 14,000 | 7 | Dismantled | ||||||
Udb... | 2,000 | 1 | Dismantled | ||||||
Udb... | 4,000 | 2 | Operational | ||||||
Udb... | 11,500 | 5 | Operational | ||||||
Udb... | 2,000 | 1 | Dismantled | ||||||
Udb... | 2,000 | 1 | Dismantled | ||||||
Udb... | 39,600 | 11 | Operational | ||||||
Udb... | 7,200 | 2 | Operational | ||||||
Udb... | 3,300 | 5 | Operational | ||||||
Udg... | 150 | 1 | Dismantled | ||||||
Udg... | 150 | 1 | Dismantled | ||||||
Udg... | 150 | 1 | Dismantled | ||||||
Uge... | 150 | 1 | Operational | ||||||
Ugg... | 2,250 | 3 | Operational | ||||||
Ugi... | 660 | 1 | Operational | ||||||
Ugi... | 660 | 1 | Operational | ||||||
Ugi... | 660 | 1 | Operational | ||||||
Ugi... | 660 | 1 | Dismantled | ||||||
Ugl... | 1,500 | 2 | Operational | ||||||
Uhr... | 3,900 | 3 | Operational | ||||||
Uhr... | 150 | 1 | Operational | ||||||
Uhr... | 150 | 1 | Dismantled | ||||||
Ulb... | 225 | 1 | Dismantled | ||||||
Ulb... | 4,000 | 2 | Operational | ||||||
Ulb... | 300 | 2 | Dismantled | ||||||
Ulb... | 120 | 1 | Dismantled | ||||||
Ulf... | 500 | 1 | Operational | ||||||
Ulf... | 500 | 1 | Operational | ||||||
Ulf... | 450 | 2 | Dismantled | ||||||
Ulf... | 225 | 1 | Dismantled | ||||||
Ulf... | 225 | 1 | Dismantled | ||||||
Ulf... | 225 | 1 | Dismantled | ||||||
Ulf... | 7,200 | 2 | Operational | ||||||
Ulf... | 3,600 | 1 | Operational | ||||||
Ull... | 1,500 | 2 | Operational | ||||||
Ull... | 750 | 1 | Operational | ||||||
Ull... | 17,200 | 4 | Operational | ||||||
Ull... | 3,000 | 5 | Operational | ||||||
Ull... | 150 | 1 | Dismantled | ||||||
Ull... | 150 | 1 | Dismantled | ||||||
Ull... | 600 | 1 | Operational | ||||||
Ull... | 600 | 1 | Operational | ||||||
Ull... | 675 | 3 | Dismantled | ||||||
Ull... | 3,000 | 4 | Dismantled | ||||||
Ull... | 16,000 | 5 | Operational | ||||||
Ull... | 1,980 | 3 | Operational | ||||||
Uls... | 150 | 1 | Dismantled | ||||||
Uls... | 500 | 2 | Dismantled | ||||||
Uls... | 300 | 2 | Dismantled | ||||||
Uls... | 1,500 | 2 | Operational | ||||||
Uls... | 225 | 1 | Dismantled | ||||||
Und... | 200 | 1 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Ure... | 150 | 1 | Dismantled | ||||||
Uru... | 2,600 | 2 | Operational | ||||||
Uru... | 3,900 | 3 | Operational | ||||||
Uru... | 1,300 | 1 | Operational | ||||||
Uru... | 2,600 | 2 | Operational | ||||||
Uru... | 1,300 | 1 | Operational | ||||||
Uru... | 18,000 | 6 | Operational | ||||||
Utt... | 600 | 1 | Operational | ||||||
Utt... | 500 | 1 | Operational | ||||||
Utt... | 225 | 1 | Dismantled | ||||||
Utt... | 150 | 1 | Dismantled | ||||||
V. ... | 200 | 1 | Operational | ||||||
V. ... | 200 | 1 | Operational | ||||||
V. ... | 200 | 1 | Dismantled | ||||||
V16... | 9,500 | 1 | Dismantled | ||||||
Vaa... | 150 | 1 | Dismantled | ||||||
Vab... | 200 | 1 | Operational | ||||||
Vab... | 600 | 1 | Operational | ||||||
Vab... | 1,200 | 2 | Operational | ||||||
Vab... | 150 | 1 | Operational | ||||||
Vad... | 450 | 3 | Dismantled | ||||||
Vae... | 600 | 1 | Operational | ||||||
Vae... | 1,200 | 2 | Operational | ||||||
Vae... | 600 | 1 | Operational | ||||||
Val... | 600 | 1 | Operational | ||||||
Val... | 600 | 1 | Operational | ||||||
Val... | 150 | 1 | Dismantled | ||||||
Val... | 4,600 | 2 | Operational | ||||||
Val... | 1,500 | 2 | Operational | ||||||
Van... | 225 | 1 | Dismantled | ||||||
Van... | 225 | 1 | Dismantled | ||||||
Van... | 150 | 1 | Dismantled | ||||||
Van... | 450 | 3 | Dismantled | ||||||
Van... | 150 | 1 | Dismantled | ||||||
Van... | 450 | 2 | Dismantled | ||||||
Van... | 225 | 1 | Operational | ||||||
Van... | 750 | 1 | Operational | ||||||
Var... | 300 | 2 | Operational | ||||||
Var... | 300 | 2 | Dismantled | ||||||
Var... | 150 | 1 | Dismantled | ||||||
Vas... | 2,000 | 1 | Operational | ||||||
Vat... | 2,000 | 1 | Operational | ||||||
Ved... | 500 | 1 | Operational | ||||||
Ved... | 660 | 1 | Operational | ||||||
Ved... | 225 | 1 | Operational | ||||||
Ved... | 850 | 1 | Operational | ||||||
Ved... | 1,200 | 1 | Dismantled | ||||||
Ved... | 6,000 | 6 | Dismantled | ||||||
Ved... | 2,000 | 2 | Dismantled | ||||||
Ved... | 180 | 1 | Dismantled | ||||||
Ved... | 37,800 | 9 | Operational | ||||||
Ved... | 6,000 | 4 | Operational | ||||||
Ved... | 4,500 | 3 | Operational | ||||||
Ved... | 4,500 | 3 | Operational | ||||||
Ved... | 2,250 | 10 | Dismantled | ||||||
Ved... | 600 | 1 | Operational | ||||||
Ved... | 1,320 | 2 | Operational | ||||||
Ved... | 660 | 1 | Operational | ||||||
Vee... | 1,500 | 2 | Operational | ||||||
Veg... | 1,800 | 3 | Operational | ||||||
Vej... | 225 | 1 | Operational | ||||||
Vej... | 500 | 2 | Operational | ||||||
Vej... | 225 | 1 | Operational | ||||||
Vej... | 600 | 1 | Operational | ||||||
Vej... | 1,550 | 1 | Dismantled | ||||||
Vej... | 2,600 | 2 | Operational | ||||||
Vej... | 1,800 | 3 | Operational | ||||||
Vej... | 675 | 3 | Dismantled | ||||||
Vej... | 750 | 1 | Operational | ||||||
Vej... | 750 | 1 | Operational | ||||||
Vej... | 600 | 1 | Operational | ||||||
Vej... | 600 | 1 | Dismantled | ||||||
Vej... | 600 | 1 | Dismantled | ||||||
Vej... | Dismantled | ||||||||
Vej... | Dismantled | ||||||||
Vej... | 750 | 1 | Operational | ||||||
Vej... | 4,800 | 8 | Operational | ||||||
Vej... | 12,000 | 4 | Operational | ||||||
Vel... | 1,800 | 3 | Operational | ||||||
Vel... | 1,200 | 2 | Operational | ||||||
Vel... | 1,500 | 3 | Operational | ||||||
Vel... | 400 | 2 | Operational | ||||||
Vel... | 225 | 1 | Operational | ||||||
Vel... | 6,000 | 2 | Operational | ||||||
Vel... | 900 | 4 | Dismantled | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Vel... | 900 | 4 | Operational | ||||||
Vel... | 2,250 | 10 | Dismantled | ||||||
Vem... | 29,700 | 9 | Operational | ||||||
Vem... | 600 | 1 | Operational | ||||||
Vem... | 150 | 1 | Operational | ||||||
Vem... | Dismantled | ||||||||
Vem... | 1,200 | 2 | Operational | ||||||
Ven... | 300 | 2 | Operational | ||||||
Ven... | 300 | 2 | Operational | ||||||
Ven... | 150 | 1 | Operational | ||||||
Ven... | 150 | 1 | Dismantled | ||||||
Ven... | 5,600 | 1 | Operational | ||||||
Ven... | 5,600 | 1 | Operational | ||||||
Ven... | 675 | 3 | Dismantled | ||||||
Ven... | 400 | 2 | Dismantled | ||||||
Ven... | 1,800 | 8 | Dismantled | ||||||
Ver... | 750 | 1 | Operational | ||||||
Ver... | 750 | 1 | Operational | ||||||
Ves... | 9,000 | 3 | Operational | ||||||
Ves... | 300 | 1 | Dismantled | ||||||
Ves... | 300 | 1 | Operational | ||||||
Ves... | 300 | 1 | Operational | ||||||
Ves... | 750 | 1 | Dismantled | ||||||
Ves... | 1,200 | 2 | Dismantled | ||||||
Ves... | 225 | 1 | Dismantled | ||||||
Ves... | 750 | 1 | Operational | ||||||
Ves... | 150 | 1 | Dismantled | ||||||
Ves... | 1,100 | 2 | Operational | ||||||
Ves... | 660 | 1 | Operational | ||||||
Ves... | 150 | 1 | Operational | ||||||
Ves... | 660 | 1 | Operational | ||||||
Ves... | 200 | 1 | Dismantled | ||||||
Ves... | 750 | 1 | Operational | ||||||
Ves... | 250 | 1 | Operational | ||||||
Ves... | 400 | 2 | Dismantled | ||||||
Ves... | 200 | 1 | Operational | ||||||
Ves... | 150 | 1 | Operational | ||||||
Ves... | 225 | 1 | Operational | ||||||
Ves... | 150 | 1 | Dismantled | ||||||
Ves... | 150 | 1 | Operational | ||||||
Ves... | 176,000 | 21 | Under construction | ||||||
Ves... | 168,000 | Under construction | |||||||
Ves... | 750 | 1 | Operational | ||||||
Ves... | 600 | 1 | Operational | ||||||
Ves... | 6,000 | 3 | Operational | ||||||
Ves... | 300 | 1 | Operational | ||||||
Ves... | 3,600 | 1 | Operational | ||||||
Ves... | 3,600 | 1 | Operational | ||||||
Ves... | 3,450 | 1 | Operational | ||||||
Ves... | 180 | 1 | Operational | ||||||
Ves... | 600 | 1 | Operational | ||||||
Ves... | 600 | 1 | Operational | ||||||
Ves... | 600 | 1 | Operational | ||||||
Ves... | 225 | 1 | Operational | ||||||
Ves... | 150 | 1 | Operational | ||||||
Ves... | 150 | 1 | Dismantled | ||||||
Ves... | 150 | 1 | Operational | ||||||
Ves... | 150 | 1 | Operational | ||||||
Ves... | 150 | 1 | Operational | ||||||
Ves... | 100 | 1 | Dismantled | ||||||
Ves... | 100 | 1 | Dismantled | ||||||
Ves... | 100 | 1 | Dismantled | ||||||
Ves... | 500 | 2 | Dismantled | ||||||
Ves... | 750 | 1 | Operational | ||||||
Ves... | 600 | 1 | Operational | ||||||
Ves... | 2,400 | 4 | Operational | ||||||
Vet... | 150 | 1 | Dismantled | ||||||
Vib... | 750 | 1 | Operational | ||||||
Vib... | 750 | 1 | Operational | ||||||
Vid... | 600 | 1 | Operational | ||||||
Vid... | 225 | 1 | Dismantled | ||||||
Vid... | 12,000 | 4 | Operational | ||||||
Vid... | 225 | 1 | Dismantled | ||||||
Vid... | 225 | 1 | Dismantled | ||||||
Vig... | 2,640 | 12 | Dismantled | ||||||
Vig... | 9,200 | 4 | Operational | ||||||
Vig... | 3,300 | 1 | Operational | ||||||
Vig... | 3,450 | 1 | Operational | ||||||
Vig... | 3,300 | 1 | Operational | ||||||
Vig... | 150 | 1 | Dismantled | ||||||
Vig... | 450,000 | Planned | |||||||
Vil... | 3,000 | 1 | Operational | ||||||
Vil... | 300 | 1 | Dismantled | ||||||
Vil... | 6,000 | 2 | Operational | ||||||
Vil... | 300 | 2 | Dismantled | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Vil... | 150 | 1 | Dismantled | ||||||
Vil... | 150 | 1 | Dismantled | ||||||
Vil... | 150 | 1 | Operational | ||||||
Vil... | 100 | 1 | Dismantled | ||||||
Vil... | 150 | 1 | Operational | ||||||
Vil... | 850 | 1 | Operational | ||||||
Vil... | 600 | 1 | Operational | ||||||
Vil... | 600 | 1 | Operational | ||||||
Vil... | 600 | 1 | Operational | ||||||
Vil... | 150 | 1 | Operational | ||||||
Vil... | 3,900 | 3 | Operational | ||||||
Vil... | 450 | 3 | Dismantled | ||||||
Vil... | 1,320 | 2 | Operational | ||||||
Vil... | 150 | 1 | Operational | ||||||
Vil... | 800 | 1 | Operational | ||||||
Vin... | 150 | 1 | Operational | ||||||
Vin... | 600 | 1 | Operational | ||||||
Vin... | 600 | 1 | Operational | ||||||
Vin... | 600 | 1 | Operational | ||||||
Vin... | 4,950 | 11 | Dismantled | ||||||
Vin... | 660 | 1 | Operational | ||||||
Vin... | 1,600 | 2 | Operational | ||||||
Vin... | 800 | 1 | Operational | ||||||
Vin... | 850 | 1 | Operational | ||||||
Vin... | 1,700 | 2 | Operational | ||||||
Vin... | 660 | 1 | Operational | ||||||
Vin... | 660 | 1 | Operational | ||||||
Vin... | 660 | 1 | Operational | ||||||
Vin... | 1,800 | 3 | Operational | ||||||
Vin... | 600 | 1 | Dismantled | ||||||
Vin... | 1,800 | 2 | Operational | ||||||
Vin... | 300 | 2 | Dismantled | ||||||
Vin... | 5,000 | 5 | Operational | ||||||
Vin... | 225 | 1 | Dismantled | ||||||
Vin... | 2,640 | 4 | Operational | ||||||
Vin... | 600 | 3 | Operational | ||||||
Vin... | 750 | 1 | Operational | ||||||
Vir... | 300 | 1 | Dismantled | ||||||
Vir... | 2,250 | 3 | Operational | ||||||
Vir... | 300 | 2 | Dismantled | ||||||
Vir... | 150 | 1 | Dismantled | ||||||
Vis... | 6,000 | 3 | Operational | ||||||
Vis... | 150 | 1 | Dismantled | ||||||
Vit... | 5,250 | 3 | Operational | ||||||
Vit... | 1,500 | 2 | Operational | ||||||
Viu... | 1,800 | 2 | Operational | ||||||
Viu... | 18,000 | 6 | Operational | ||||||
Viu... | 600 | 2 | Dismantled | ||||||
Viu... | 225 | 1 | Dismantled | ||||||
Viu... | 150 | 1 | Operational | ||||||
Viu... | 150 | 1 | Dismantled | ||||||
Viu... | 150 | 1 | Dismantled | ||||||
Viu... | 2,700 | 3 | Operational | ||||||
Viu... | 900 | 1 | Operational | ||||||
Viu... | 900 | 1 | Operational | ||||||
Viv... | 225 | 1 | Dismantled | ||||||
Vod... | 3,750 | 5 | Operational | ||||||
Vod... | 750 | 1 | Operational | ||||||
Vod... | 750 | 1 | Operational | ||||||
Vod... | 2,250 | 3 | Operational | ||||||
Vod... | 660 | 1 | Operational | ||||||
Vod... | 2,250 | 3 | Operational | ||||||
Vod... | 600 | 1 | Operational | ||||||
Voe... | 150 | 1 | Operational | ||||||
Voe... | 150 | 1 | Dismantled | ||||||
Voe... | 150 | 1 | Dismantled | ||||||
Voe... | 400 | 2 | Operational | ||||||
Voe... | 200 | 1 | Dismantled | ||||||
Voe... | 12,000 | 4 | Operational | ||||||
Vog... | 13,800 | 6 | Operational | ||||||
Vog... | 3,000 | 3 | Operational | ||||||
Voj... | 800 | 1 | Operational | ||||||
Voj... | 800 | 1 | Operational | ||||||
Vol... | 2,250 | 3 | Operational | ||||||
Vol... | 1,500 | 2 | Operational | ||||||
Vol... | 750 | 1 | Operational | ||||||
Vol... | 1,200 | 2 | Operational | ||||||
Vol... | 1,800 | 2 | Operational | ||||||
Vol... | 750 | 1 | Operational | ||||||
Vol... | 1,500 | 2 | Operational | ||||||
Vol... | 750 | 1 | Operational | ||||||
Vol... | 150 | 1 | Dismantled | ||||||
Vol... | 600 | 1 | Operational | ||||||
Vol... | 160 | 1 | Dismantled | ||||||
Vol... | 150 | 1 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Vol... | 200 | 1 | Operational | ||||||
Vol... | 750 | 1 | Operational | ||||||
Vol... | 600 | 1 | Operational | ||||||
Vol... | 300 | 2 | Dismantled | ||||||
Vol... | 1,320 | 2 | Operational | ||||||
Vol... | 1,980 | 3 | Operational | ||||||
Vol... | 600 | 1 | Dismantled | ||||||
Vol... | 600 | 1 | Dismantled | ||||||
Vol... | 200 | 1 | Dismantled | ||||||
Vol... | 150 | 1 | Operational | ||||||
Vol... | 4,000 | 2 | Operational | ||||||
Vol... | 660 | 1 | Operational | ||||||
Vol... | 2,250 | 3 | Operational | ||||||
Vol... | 12,800 | 4 | Operational | ||||||
Von... | 3,000 | 3 | Operational | ||||||
Vor... | 12,000 | 4 | Operational | ||||||
Vor... | 3,000 | 1 | Operational | ||||||
Vor... | 150 | 1 | Dismantled | ||||||
Vor... | 150 | 1 | Dismantled | ||||||
Vor... | 1,500 | 2 | Operational | ||||||
Vor... | 1,200 | 2 | Operational | ||||||
Vor... | 600 | 1 | Operational | ||||||
Vot... | 1,750 | 1 | Operational | ||||||
Vra... | 11,250 | 15 | Operational | ||||||
Vra... | 11,250 | 15 | Operational | ||||||
Vra... | 270 | 1 | Dismantled | ||||||
Vra... | 150 | 1 | Operational | ||||||
Vra... | 150 | 1 | Dismantled | ||||||
Vra... | 750 | 1 | Operational | ||||||
Vre... | 200 | 1 | Operational | ||||||
Vri... | 500 | 1 | Operational | ||||||
Vri... | 500 | 1 | Operational | ||||||
Vri... | 750 | 1 | Operational | ||||||
Vri... | 1,320 | 2 | Operational | ||||||
Vri... | 3,000 | 3 | Operational | ||||||
Vri... | 600 | 1 | Operational | ||||||
Vro... | 600 | 1 | Operational | ||||||
Vro... | 250 | 1 | Operational | ||||||
Vro... | 6,000 | 2 | Operational | ||||||
Vus... | 2,000 | 5 | Operational | ||||||
Væg... | 600 | 1 | Operational | ||||||
Væg... | 600 | 1 | Operational | ||||||
Væg... | 600 | 1 | Operational | ||||||
Væg... | 150 | 1 | Operational | ||||||
Væg... | 150 | 1 | Dismantled | ||||||
Væg... | 150 | 1 | Dismantled | ||||||
Væg... | 150 | 1 | Dismantled | ||||||
Væg... | 150 | 1 | Dismantled | ||||||
Væg... | 150 | 1 | Dismantled | ||||||
Væg... | 150 | 1 | Dismantled | ||||||
Væg... | 150 | 1 | Dismantled | ||||||
Vær... | 599 | 1 | Operational | ||||||
Vær... | 2,250 | 3 | Operational | ||||||
Vær... | 750 | 1 | Operational | ||||||
Vær... | 750 | 1 | Operational | ||||||
Vær... | 200 | 1 | Dismantled | ||||||
Ydb... | 225 | 1 | Operational | ||||||
Ydb... | 500 | 1 | Operational | ||||||
Ydb... | 225 | 1 | Dismantled | ||||||
Yll... | 1,980 | 3 | Dismantled | ||||||
Ytt... | 225 | 1 | Operational | ||||||
|
Name Area |
Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
/ | ||||||
Aalborg |
750 | 1 | Operational | |||
Abild |
600 | 1 | Operational | |||
Abildgard (Rebild) |
1,800 | 3 | Operational | |||
Abildgard (Thisted) |
600 | 1 | Operational | |||
Abildgard (Thisted) |
600 | 1 | Operational | |||
Abildgard (Thisted) |
500 | 1 | Operational | |||
Abildgard (Thisted) |
600 | 1 | Operational | |||
Abol |
180 | 1 | Operational | |||
Abol |
180 | 1 | Operational | |||
Abol |
600 | 1 | Operational | |||
Abterp |
1,320 | 2 | Operational | |||
Aby |
600 | 1 | Operational | |||
Adbol |
225 | 1 | Operational | |||
Adsbol |
150 | 1 | Dismantled | |||
Adum |
225 | 1 | Dismantled | |||
Adum |
225 | 1 | Dismantled | |||
Adum-Kirkeby |
24,000 | 8 | Operational | |||
Aeble |
750 | 1 | Operational | |||
Aflandshage |
250,000 |