-
Name |
Area |
Power (kW) |
Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status |
Commissioning date |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Bondowoso |
|
800 |
1 |
|
|
Operational |
|
|
|
|
|
|
|
|
|
Kluet |
|
10,000 |
|
|
|
Operational |
|
|
|
|
|
|
|
|
|
Sidrap |
|
75,000 |
30 |
|
|
Operational |
|
|
|
|
|
|
|
|
|
Tolo 1 |
|
72,000 |
20 |
|
|
Operational |
|
|
|
|
|
|
|
|
|
|
Name Area |
Power (kW) |
Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status |
Commissioning date |
/ |
|
|
|
|
|
|
|
|
|
|
|
|
|
Bondowoso
|
800 |
1 |
|
|
Operational |
|
|
|
|
|
|
|
|
Kluet
|
10,000 |
|