|
General data | Wind farms |
By zones | Map | Media | IREC Index |
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Adawadi | 1,500 | 1 | Operational | ||||||
Aeolus 1 | 24,000 | Operational | |||||||
Aeolus 2 | 26,000 | Operational | |||||||
Afjalpur | 15,000 | Operational | |||||||
Agar (Gujarat) | 40,000 | Operational | |||||||
Agar (Madhya Pradesh) | 15,000 | Operational | |||||||
Agar (Madhya Pradesh) | 15,000 | Operational | |||||||
Agar (Madhya Pradesh) | 100,000 | 50 | Operational | ||||||
Agashwadi | 6,000 | 4 | Operational | ||||||
Agashwadi | 50,000 | Operational | |||||||
Ahmednagar | 40,000 | Operational | |||||||
Aichale-Dhandane-Wankute-Mandal-Vavad | 10,000 | 8 | Operational | ||||||
Akal | 15,000 | 10 | Operational | ||||||
Akal | 25,500 | 17 | Operational | ||||||
Alaganeri | 750 | 1 | Operational | ||||||
Amba | 50,000 | 25 | Operational | ||||||
Amba | 66,000 | 33 | Operational | ||||||
Amba | 52,000 | Operational | |||||||
Ambheri | 14,400 | 24 | Operational | ||||||
Ambheri | 2,400 | 4 | Operational | ||||||
Ambheri | 15,975 | 71 | Operational | ||||||
Ambheri | 6,250 | 25 | Operational | ||||||
Ambheri | 4,000 | 2 | Operational | ||||||
Ambheri | 16,000 | 8 | Operational | ||||||
Amidyala | 50,000 | Operational | |||||||
Amidyala | 227,000 | Operational | |||||||
Amreli | 26,000 | Operational | |||||||
Amreli | 97,000 | Operational | |||||||
Amreli | 198,000 | Operational | |||||||
Amuthapuram | 101,000 | Operational | |||||||
Anaburu | 16,500 | 10 | Operational | ||||||
Anaikulam | 16,500 | 10 | Operational | ||||||
Anantapur | 277,200 | 132 | Operational | ||||||
Anantapur (Adani) | 50,000 | 25 | Operational | ||||||
Anantapur (Axis) | 105,000 | 50 | Operational | ||||||
Anantapur (Bheema Cements) | 7,500 | 5 | Operational | ||||||
Anantapur (Ecoren Energy) | 40,000 | Operational | |||||||
Anantapur (Hero) | 120,000 | 60 | Operational | ||||||
Anantapur (Jindal Aluminium) | 25,000 | Operational | |||||||
Anantapur (Orange) | 100,000 | 50 | Operational | ||||||
Anantapur (Ostro) | 197,400 | 94 | Operational | ||||||
Ananthapuramu | 24,000 | Operational | |||||||
Ananthapuramu | 22,000 | Operational | |||||||
Andhra Lake | 56,000 | 70 | Operational | ||||||
Andhra Lake | 57,600 | 72 | Operational | ||||||
Animala | 90,000 | 45 | Operational | ||||||
Ansal Properties & Infrastructure Ltd | 12,000 | 8 | Operational | ||||||
Anthiyur | 13,500 | 9 | Operational | ||||||
Arasinagundi | 13,200 | 8 | Operational | ||||||
Arikhana | 6,000 | 4 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Ari... | 1,500 | 1 | Operational | ||||||
Ari... | 3,000 | 2 | Operational | ||||||
Ary... | 15,000 | Operational | |||||||
Asp... | 51,000 | 30 | Operational | ||||||
Asp... | 119,600 | 52 | Operational | ||||||
Asp... | 79,900 | 47 | Operational | ||||||
Atw... | 3,000 | 2 | Operational | ||||||
Aun... | 10,400 | 13 | Operational | ||||||
Aun... | 42,000 | 28 | Operational | ||||||
Aya... | 750 | 1 | Operational | ||||||
Bab... | 86,250 | Operational | |||||||
Bab... | 50,000 | 25 | Operational | ||||||
Bab... | 50,000 | 25 | Operational | ||||||
Bab... | 50,000 | 25 | Operational | ||||||
Bab... | 50,000 | 25 | Operational | ||||||
Bab... | 35,000 | Operational | |||||||
Bad... | 5,000 | 4 | Operational | ||||||
Bad... | 3,150 | 9 | Operational | ||||||
Bad... | 2,500 | 2 | Operational | ||||||
Bad... | 6,000 | 6 | Operational | ||||||
Bad... | 4,000 | 5 | Operational | ||||||
Bad... | 42,000 | Operational | |||||||
Bag... | 120,000 | Operational | |||||||
Bag... | 34,000 | 17 | Operational | ||||||
Bal... | 16,000 | Operational | |||||||
Bal... | 16,000 | Operational | |||||||
Ban... | 11,200 | Operational | |||||||
Ban... | 78,000 | 26 | Operational | ||||||
Bap... | 50,000 | Operational | |||||||
Bar... | 5,000 | 4 | Operational | ||||||
Bar... | 2,500 | 2 | Operational | ||||||
Bar... | 15,000 | 25 | Operational | ||||||
Bar... | 25,000 | Operational | |||||||
Bas... | 119,000 | Operational | |||||||
Bas... | 10,000 | 5 | Operational | ||||||
Bas... | 10,000 | 5 | Operational | ||||||
Bas... | 39,600 | 18 | Operational | ||||||
Bas... | 79,200 | 36 | Operational | ||||||
Bas... | 2,500 | 5 | Operational | ||||||
Bat... | 60,000 | Operational | |||||||
Bel... | 47,000 | Operational | |||||||
Bel... | 10,000 | Operational | |||||||
Bel... | 40,000 | Operational | |||||||
Bel... | 40,000 | Operational | |||||||
Bel... | 24,800 | 31 | Operational | ||||||
Bel... | 15,000 | Operational | |||||||
Bel... | 175,000 | Under construction | |||||||
Bel... | 199,000 | Operational | |||||||
Bel... | 100,800 | 48 | Operational | ||||||
Ber... | 50,000 | 25 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Bes... | 13,000 | Operational | |||||||
Bet... | 50,000 | Operational | |||||||
Bet... | 50,000 | Operational | |||||||
Bet... | 50,000 | Operational | |||||||
Bet... | 49,500 | 33 | Operational | ||||||
Bha... | 46,000 | Operational | |||||||
Bha... | 20,000 | Operational | |||||||
Bha... | 21,600 | 27 | Operational | ||||||
Bha... | 82,400 | 103 | Operational | ||||||
Bha... | 14,400 | 18 | Operational | ||||||
Bha... | 3,000 | 2 | Operational | ||||||
Bha... | 8,400 | 4 | Operational | ||||||
Bha... | 1,650 | 1 | Operational | ||||||
Bha... | 37,950 | 23 | Operational | ||||||
Bha... | 36,300 | 22 | Operational | ||||||
Bha... | 50,000 | Operational | |||||||
Bha... | 5,000 | 4 | Operational | ||||||
Bha... | 118,800 | 44 | Under construction | ||||||
Bhe... | 26,000 | Operational | |||||||
Bhe... | 49,300 | Operational | |||||||
Bhe... | 50,400 | 24 | Operational | ||||||
Bhe... | 31,500 | 15 | Operational | ||||||
Bhe... | 50,400 | 24 | Operational | ||||||
Bhe... | 50,400 | 24 | Operational | ||||||
Bhi... | 51,000 | 34 | Operational | ||||||
Bhi... | 12,000 | 8 | Operational | ||||||
Bhi... | 51,000 | 34 | Operational | ||||||
Bho... | 8,750 | 7 | Operational | ||||||
Bho... | 25,200 | 12 | Operational | ||||||
Bho... | 40,000 | Operational | |||||||
Bhu... | 20,000 | Operational | |||||||
Bhu... | 20,000 | Operational | |||||||
Bhu... | 12,000 | Operational | |||||||
Bhu... | 15,000 | 10 | Operational | ||||||
Bhu... | 27,000 | 18 | Operational | ||||||
Bhu... | 42,900 | 26 | Operational | ||||||
Bhu... | 4,950 | 3 | Operational | ||||||
Bhu... | 51,000 | 34 | Operational | ||||||
Bhu... | 300,000 | Operational | |||||||
Bhu... | 150,000 | Operational | |||||||
Bid... | 6,650 | 7 | Operational | ||||||
Bir... | 800 | 1 | Operational | ||||||
Bir... | 2,500 | 2 | Operational | ||||||
Bir... | 1,250 | 1 | Operational | ||||||
Bit... | 12,000 | Operational | |||||||
Bit... | 27,000 | Operational | |||||||
Bly... | 32,000 | 16 | Operational | ||||||
Bog... | 1,200 | 4 | Operational | ||||||
Bor... | 105,000 | 50 | Operational | ||||||
Bor... | 50,400 | Operational | |||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Bor... | 147,000 | Operational | |||||||
Bor... | 7,200 | 9 | Operational | ||||||
Bot... | 98,700 | 47 | Operational | ||||||
Bot... | 21,000 | 10 | Operational | ||||||
Bot... | 80,000 | 40 | Operational | ||||||
BP ... | 36,300 | Operational | |||||||
BP ... | 23,100 | Operational | |||||||
BP ... | 40,000 | Operational | |||||||
Bra... | 3,300 | 2 | Operational | ||||||
Bra... | 40,000 | 32 | Operational | ||||||
Bra... | 3,000 | 5 | Operational | ||||||
Bra... | 3,000 | 4 | Operational | ||||||
Bra... | 15,000 | 20 | Operational | ||||||
Bra... | 17,250 | 23 | Operational | ||||||
Bra... | 9,600 | 16 | Operational | ||||||
Bra... | 431,250 | 345 | Operational | ||||||
Bra... | 6,000 | 4 | Operational | ||||||
Bra... | 11,000 | Operational | |||||||
Bud... | 30,000 | 20 | Operational | ||||||
Bur... | 11,000 | Operational | |||||||
Bur... | 37,400 | 44 | Operational | ||||||
Cha... | 30,000 | 20 | Operational | ||||||
Cha... | 4,200 | 2 | Operational | ||||||
Cha... | 255,000 | Operational | |||||||
Cha... | 50,000 | Operational | |||||||
Cha... | 39,000 | 26 | Operational | ||||||
Cha... | 2,000 | 8 | Operational | ||||||
Cha... | 3,750 | 3 | Operational | ||||||
Cha... | 450 | 2 | Operational | ||||||
Cha... | 5,600 | 16 | Operational | ||||||
Cha... | 1,800 | 8 | Operational | ||||||
Cha... | 5,000 | 10 | Operational | ||||||
Cha... | 6,000 | 20 | Operational | ||||||
Cha... | 4,800 | 8 | Operational | ||||||
Cha... | 92,000 | 46 | Operational | ||||||
Cha... | 38,000 | 19 | Operational | ||||||
Cha... | 250,000 | Operational | |||||||
Cha... | 28,125 | 125 | Operational | ||||||
Cha... | 7,200 | 12 | Operational | ||||||
Cha... | 4,500 | 6 | Operational | ||||||
Cha... | 15,000 | 10 | Operational | ||||||
Cha... | 850 | 1 | Operational | ||||||
Cha... | 4,800 | 6 | Operational | ||||||
Cha... | 1,250 | 1 | Operational | ||||||
Cha... | 900 | 1 | Operational | ||||||
Cha... | 25,000 | Operational | |||||||
Cha... | 37,600 | 47 | Operational | ||||||
Che... | 6,000 | 10 | Operational | ||||||
Che... | 11,000 | Operational | |||||||
Che... | 15,000 | Operational | |||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Che... | 1,800 | 1 | Operational | ||||||
Chh... | 21,000 | Operational | |||||||
Chh... | 1,250 | 1 | Operational | ||||||
Chh... | 5,000 | 4 | Operational | ||||||
Chi... | 2,850 | 3 | Operational | ||||||
Chi... | 25,500 | 17 | Operational | ||||||
Chi... | 32,000 | Operational | |||||||
Chi... | 18,000 | 9 | Operational | ||||||
Chi... | 75,000 | 50 | Operational | ||||||
Chi... | 10,000 | Operational | |||||||
Chi... | 26,000 | Operational | |||||||
Chi... | 2,000 | 4 | Operational | ||||||
Chi... | 1,500 | 1 | Operational | ||||||
Chi... | 19,000 | Operational | |||||||
Chi... | 23,300 | 10 | Operational | ||||||
Cit... | 33,000 | Operational | |||||||
Cit... | 42,000 | Operational | |||||||
Clo... | 72,000 | Operational | |||||||
Cod... | 60,900 | 29 | Operational | ||||||
Coi... | 8,800 | 11 | Operational | ||||||
Cor... | 166,000 | Operational | |||||||
Dag... | 54,000 | Operational | |||||||
Dah... | 8,750 | 7 | Operational | ||||||
Dal... | 118,800 | 44 | Under construction | ||||||
Dal... | 15,000 | 10 | Operational | ||||||
Dal... | 19,500 | 13 | Operational | ||||||
Dan... | 4,950 | 3 | Operational | ||||||
Dan... | 54,000 | Operational | |||||||
Dan... | 24,000 | Operational | |||||||
Dan... | 112,000 | Operational | |||||||
Dan... | 20,000 | Operational | |||||||
Dan... | 118,000 | 59 | Operational | ||||||
Dan... | 40,000 | 20 | Operational | ||||||
Dan... | 30,000 | 15 | Operational | ||||||
Dan... | 30,000 | Operational | |||||||
Dav... | 3,750 | 3 | Operational | ||||||
Day... | 75,000 | Operational | |||||||
Day... | 50,000 | Operational | |||||||
Day... | 200,000 | Operational | |||||||
Day... | 250,000 | 125 | Operational | ||||||
Dev... | 30,000 | Operational | |||||||
Dev... | 63,000 | Operational | |||||||
Dev... | 51,000 | Operational | |||||||
Dev... | 190,000 | Operational | |||||||
Dev... | 251,000 | Operational | |||||||
Dev... | 50,000 | Operational | |||||||
Dev... | 37,500 | 25 | Operational | ||||||
Dev... | 22,500 | 15 | Operational | ||||||
Dev... | 51,000 | 34 | Operational | ||||||
Dev... | 20,000 | Operational | |||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Dev... | 30,000 | Operational | |||||||
Dev... | 24,000 | 12 | Operational | ||||||
Dev... | 100,000 | Operational | |||||||
Dew... | 58,800 | 28 | Operational | ||||||
Dew... | 27,300 | Operational | |||||||
Dha... | 2,500 | 2 | Operational | ||||||
Dha... | 8,400 | 14 | Operational | ||||||
Dha... | 30,600 | 51 | Operational | ||||||
Dha... | 8,750 | 7 | Operational | ||||||
Dha... | 15,000 | Operational | |||||||
Dha... | 100,000 | Operational | |||||||
Dha... | 50,000 | Operational | |||||||
Dha... | 274,000 | Operational | |||||||
Dhu... | 3,750 | 3 | Operational | ||||||
Dhu... | 4,500 | 3 | Operational | ||||||
Dhu... | 20,000 | Operational | |||||||
Dhu... | 15,000 | 12 | Operational | ||||||
Dhu... | 30,000 | 24 | Operational | ||||||
Dhu... | 3,750 | 3 | Operational | ||||||
Dhu... | 10,000 | 8 | Operational | ||||||
Dhu... | 75,000 | 60 | Operational | ||||||
Din... | 150,000 | Operational | |||||||
Din... | 26,000 | Operational | |||||||
DLF... | 75,000 | Operational | |||||||
DLF... | 182,000 | Operational | |||||||
Dwa... | 39,000 | Operational | |||||||
Eco... | 10,000 | Operational | |||||||
Eco... | 16,000 | Operational | |||||||
EEI... | 20,000 | Operational | |||||||
Ela... | 34,000 | Operational | |||||||
Elk... | 18,000 | 12 | Operational | ||||||
Ell... | 50,400 | 24 | Operational | ||||||
Ell... | 50,400 | 24 | Operational | ||||||
Ell... | 31,500 | Operational | |||||||
Ene... | 159,000 | Operational | |||||||
Ene... | 10,500 | 7 | Operational | ||||||
Epp... | 30,600 | 17 | Operational | ||||||
Ess... | 88,000 | Operational | |||||||
Fat... | 108,000 | 54 | Operational | ||||||
For... | 51,200 | 32 | Operational | ||||||
For... | 50,000 | 25 | Operational | ||||||
G R... | 41,000 | Operational | |||||||
GAC... | 65,000 | Operational | |||||||
Gad... | 31,000 | Operational | |||||||
Gad... | 13,000 | Operational | |||||||
Gad... | 34,000 | Operational | |||||||
Gad... | 24,000 | Operational | |||||||
Gad... | 5,000 | 4 | Operational | ||||||
Gad... | 24,800 | 31 | Operational | ||||||
Gad... | 11,200 | 14 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Gad... | 450 | 2 | Operational | ||||||
Gad... | 50,000 | Operational | |||||||
Gad... | 300,000 | Under construction | |||||||
Gaj... | 15,000 | 25 | Operational | ||||||
Gan... | 15,000 | Operational | |||||||
Gan... | 50,400 | 24 | Operational | ||||||
Gan... | 21,000 | 10 | Operational | ||||||
Gha... | 231,500 | Operational | |||||||
Gha... | 10,000 | 8 | Operational | ||||||
Gir... | 32,000 | 16 | Operational | ||||||
Gop... | 15,000 | 10 | Operational | ||||||
Gop... | 15,000 | 10 | Operational | ||||||
Gor... | 12,000 | Operational | |||||||
Gud... | 60,000 | Operational | |||||||
Gud... | 18,000 | 12 | Operational | ||||||
Gud... | 23,100 | 14 | Operational | ||||||
Gud... | 2,400 | 8 | Operational | ||||||
Gud... | 4,200 | 14 | Operational | ||||||
Gud... | 7,200 | 12 | Operational | ||||||
Gud... | 37,800 | 63 | Operational | ||||||
Gud... | 15,600 | 26 | Operational | ||||||
Gud... | 16,500 | 10 | Operational | ||||||
Gud... | 100,000 | Operational | |||||||
Gud... | 18,750 | 15 | Operational | ||||||
Guj... | 225 | 1 | Operational | ||||||
Guj... | Planned | ||||||||
Guj... | 600,000 | Planned | |||||||
Guj... | 500,000 | Planned | |||||||
Guj... | 47,600 | Operational | |||||||
Guj... | 36,000 | Operational | |||||||
Guj... | 33,000 | Operational | |||||||
Guj... | 21,000 | Operational | |||||||
Gun... | 40,000 | 20 | Operational | ||||||
Gur... | 60,000 | 30 | Operational | ||||||
Gut... | 80,000 | Operational | |||||||
GV ... | 26,000 | Operational | |||||||
Hal... | 41,000 | Operational | |||||||
Hal... | 1,250 | 1 | Operational | ||||||
Hal... | 1,250 | 1 | Operational | ||||||
Han... | 15,000 | Operational | |||||||
Han... | 50,000 | Operational | |||||||
Han... | 8,400 | 4 | Operational | ||||||
Han... | 1,920 | 6 | Operational | ||||||
Har... | 39,600 | 24 | Operational | ||||||
Har... | 21,250 | 17 | Operational | ||||||
Har... | 31,250 | 25 | Operational | ||||||
Har... | 39,600 | 24 | Operational | ||||||
Har... | 2,500 | 2 | Operational | ||||||
Har... | 25,200 | 12 | Operational | ||||||
Har... | 6,600 | 11 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Har... | 31,200 | 39 | Operational | ||||||
Har... | 11,200 | 14 | Operational | ||||||
Hav... | 44,000 | Operational | |||||||
Heb... | 24,000 | Operational | |||||||
Hir... | 10,000 | Operational | |||||||
Hyd... | 10,000 | Operational | |||||||
HZL... | 129,000 | Operational | |||||||
Ind... | 15,000 | Operational | |||||||
Iri... | 42,000 | Operational | |||||||
Irr... | 9,600 | 16 | Operational | ||||||
Iru... | 6,250 | 5 | Operational | ||||||
Ish... | 1,250 | 1 | Operational | ||||||
Ish... | 2,500 | 2 | Operational | ||||||
Ism... | 18,000 | 10 | Operational | ||||||
Jag... | 43,000 | Operational | |||||||
Jag... | 12,000 | 16 | Operational | ||||||
Jag... | 6,650 | 7 | Operational | ||||||
Jag... | 9,000 | 6 | Operational | ||||||
Jag... | 1,900 | 2 | Operational | ||||||
Jag... | 9,000 | 6 | Operational | ||||||
Jai... | 33,600 | 16 | Operational | ||||||
Jai... | 50,000 | Operational | |||||||
Jai... | 30,000 | Operational | |||||||
Jai... | 100,000 | Operational | |||||||
Jai... | 105,000 | Operational | |||||||
Jai... | 24,000 | Operational | |||||||
Jai... | 102,000 | Operational | |||||||
Jai... | 2,100 | 6 | Operational | ||||||
Jai... | 50,400 | 24 | Operational | ||||||
Jai... | 21,250 | 17 | Operational | ||||||
Jai... | 150,000 | Operational | |||||||
Jai... | 100,000 | Operational | |||||||
Jam... | 10,000 | Operational | |||||||
Jam... | 25,000 | Operational | |||||||
Jam... | 21,000 | Operational | |||||||
Jam... | 10,000 | Operational | |||||||
Jam... | 52,500 | 25 | Operational | ||||||
Jam... | 28,000 | 14 | Operational | ||||||
Jam... | 11,250 | 9 | Operational | ||||||
Jam... | 14,000 | 20 | Operational | ||||||
Jam... | 22,100 | Operational | |||||||
Jam... | 26,000 | 13 | Operational | ||||||
Jam... | 30,000 | Operational | |||||||
Jam... | 26,000 | Operational | |||||||
Jam... | 20,000 | Operational | |||||||
Jam... | 20,800 | Operational | |||||||
Jam... | 17,000 | Operational | |||||||
Jam... | 64,800 | 24 | Under construction | ||||||
Jam... | 9,600 | 12 | Operational | ||||||
Jan... | 9,900 | 6 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Jan... | 60,000 | 40 | Operational | ||||||
Jan... | 92,000 | Operational | |||||||
Jan... | 22,000 | 11 | Operational | ||||||
Jan... | 25,200 | 14 | Operational | ||||||
Jan... | 21,600 | 12 | Operational | ||||||
Jan... | 14,850 | 9 | Operational | ||||||
Jao... | 30,000 | 15 | Operational | ||||||
Jas... | 25,200 | 12 | Operational | ||||||
Jat... | 30,000 | 15 | Operational | ||||||
Jat... | 50,400 | 24 | Operational | ||||||
Jat... | 24,650 | 29 | Operational | ||||||
Jat... | 50,000 | 25 | Operational | ||||||
Jat... | 30,000 | 15 | Operational | ||||||
Jat... | 49,300 | Operational | |||||||
Jat... | 60,000 | 30 | Operational | ||||||
Jed... | 24,000 | Operational | |||||||
Jin... | 19,000 | Operational | |||||||
Jod... | 39,000 | Operational | |||||||
Jog... | 12,000 | Operational | |||||||
Jog... | 7,600 | Operational | |||||||
Jog... | 14,000 | Operational | |||||||
Joj... | 67,500 | Operational | |||||||
Joo... | 40,000 | Operational | |||||||
K S... | 63,000 | Operational | |||||||
Kad... | 6,000 | 10 | Operational | ||||||
Kad... | 1,000 | 4 | Operational | ||||||
Kad... | 500 | 2 | Operational | ||||||
Kad... | 750 | 1 | Operational | ||||||
Kad... | 4,500 | 6 | Operational | ||||||
Kad... | 5,100 | 6 | Operational | ||||||
Kad... | 43,200 | 24 | Operational | ||||||
Kad... | 3,600 | 2 | Operational | ||||||
Kad... | 3,600 | 2 | Operational | ||||||
Kad... | 4,000 | 16 | Operational | ||||||
Kad... | 16,000 | 64 | Operational | ||||||
Kad... | 10,500 | 7 | Operational | ||||||
Kad... | 600 | 1 | Operational | ||||||
Kad... | 4,500 | 6 | Operational | ||||||
Kad... | 4,200 | 7 | Operational | ||||||
Kal... | 75,600 | 36 | Operational | ||||||
Kal... | 23,100 | 11 | Operational | ||||||
Kal... | 4,500 | 3 | Operational | ||||||
Kal... | 36,000 | Operational | |||||||
Kal... | 51,000 | 34 | Operational | ||||||
Kal... | 24,000 | Operational | |||||||
Kam... | 7,500 | 5 | Operational | ||||||
Kan... | 49,000 | Operational | |||||||
Kan... | 21,000 | 10 | Operational | ||||||
Kan... | 22,000 | 11 | Operational | ||||||
Kap... | 2,025 | 9 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Kap... | 2,530 | 11 | Operational | ||||||
Kap... | 3,000 | 2 | Operational | ||||||
Kap... | 1,350 | 6 | Operational | ||||||
Kap... | 30,000 | 24 | Operational | ||||||
Kap... | 5,000 | 4 | Operational | ||||||
Kap... | 5,000 | 4 | Operational | ||||||
Kap... | 675 | 3 | Operational | ||||||
Kap... | 2,530 | 11 | Operational | ||||||
Kar... | 450,000 | Under construction | |||||||
Kar... | 1,500 | 2 | Operational | ||||||
Kas... | 7,500 | 5 | Operational | ||||||
Kas... | 15,000 | 10 | Operational | ||||||
Kas... | 1,650 | 1 | Operational | ||||||
Kas... | 3,000 | 2 | Operational | ||||||
Kas... | 10,000 | Operational | |||||||
Kav... | 7,500 | 6 | Operational | ||||||
Kav... | 1,500 | 1 | Operational | ||||||
Kay... | 50,000 | 25 | Operational | ||||||
Kay... | 30,000 | Operational | |||||||
Kaz... | 40,800 | 51 | Operational | ||||||
Ket... | 11,000 | Operational | |||||||
Kha... | 29,000 | Operational | |||||||
Kha... | 40,000 | Operational | |||||||
Kha... | 198,000 | Operational | |||||||
Kha... | 50,600 | 23 | Operational | ||||||
Kha... | 10,000 | 5 | Operational | ||||||
Kha... | 18,000 | 9 | Operational | ||||||
Kha... | 34,000 | Operational | |||||||
Kha... | 24,000 | 12 | Operational | ||||||
Kha... | 10,000 | 5 | Operational | ||||||
Kha... | 50,400 | 63 | Operational | ||||||
Kha... | 108,000 | 135 | Operational | ||||||
Kha... | 100,000 | Operational | |||||||
Khi... | 48,000 | 56 | Operational | ||||||
Kho... | 26,000 | 13 | Operational | ||||||
Kho... | 10,000 | 5 | Operational | ||||||
Kho... | 40,000 | 20 | Operational | ||||||
Kit... | 39,000 | Operational | |||||||
Kit... | 24,800 | 31 | Operational | ||||||
Kon... | 27,200 | 34 | Operational | ||||||
Kop... | 25,000 | Operational | |||||||
Kop... | 133,000 | Under construction | |||||||
Kor... | 22,800 | 38 | Operational | ||||||
Kos... | 50,000 | Operational | |||||||
Kot... | 15,000 | Operational | |||||||
Kot... | 2,000 | 8 | Operational | ||||||
Kot... | 1,750 | 7 | Operational | ||||||
Kot... | 27,000 | Operational | |||||||
Kot... | 11,000 | Operational | |||||||
Koz... | 800 | 1 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Kuc... | 50,000 | Operational | |||||||
Kuc... | 67,200 | 32 | Operational | ||||||
Kuc... | 15,000 | Operational | |||||||
Kud... | 33,000 | Operational | |||||||
Kud... | 105,000 | Operational | |||||||
Kud... | 12,000 | 8 | Operational | ||||||
Kuk... | 50,000 | 25 | Operational | ||||||
Kuk... | 50,000 | Operational | |||||||
Kuk... | 50,000 | Operational | |||||||
Kun... | 5,000 | 4 | Operational | ||||||
Kun... | 27,300 | 13 | Operational | ||||||
Kun... | 10,000 | Operational | |||||||
Kur... | 25,000 | Operational | |||||||
Kur... | 8,250 | 5 | Operational | ||||||
Kus... | 50,000 | Operational | |||||||
Kus... | 69,300 | Operational | |||||||
Kut... | 50,000 | Operational | |||||||
Kut... | 50,000 | Operational | |||||||
Kut... | 100,000 | Operational | |||||||
Kut... | 130,000 | Operational | |||||||
Kut... | 12,000 | Operational | |||||||
Kut... | 150,000 | Operational | |||||||
Kut... | 300,000 | Operational | |||||||
Kut... | 250,000 | Operational | |||||||
Kut... | 51,000 | Operational | |||||||
Kut... | 300,000 | Operational | |||||||
Kut... | 202,000 | Operational | |||||||
Kut... | 50,000 | Operational | |||||||
Kut... | 50,000 | Operational | |||||||
Kut... | 300,000 | Operational | |||||||
Kut... | 150,000 | Operational | |||||||
Kut... | 250,000 | Operational | |||||||
Kut... | 50,000 | Operational | |||||||
Kut... | 50,000 | Operational | |||||||
Kut... | 4,200 | 2 | Operational | ||||||
Kut... | 50,000 | Operational | |||||||
Kut... | 50,000 | Under construction | |||||||
Kut... | 50,000 | Under construction | |||||||
Kut... | 50,000 | Under construction | |||||||
Kut... | 50,000 | Under construction | |||||||
Kut... | 50,000 | Under construction | |||||||
Kut... | 50,000 | Under construction | |||||||
Kut... | 50,000 | Operational | |||||||
Kut... | 50,400 | 24 | Operational | ||||||
Kut... | 250,000 | Operational | |||||||
Kut... | 21,000 | 14 | Operational | ||||||
Kut... | 300,000 | Operational | |||||||
Kut... | 115,000 | Operational | |||||||
Kut... | 50,000 | Operational | |||||||
Kut... | 50,000 | Operational | |||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Kut... | 50,000 | Operational | |||||||
Kut... | 50,000 | Operational | |||||||
Lah... | 92,000 | 46 | Operational | ||||||
Lah... | 50,000 | 25 | Operational | ||||||
Lah... | 30,000 | 15 | Operational | ||||||
Lah... | 26,000 | Operational | |||||||
Lak... | 16,500 | 10 | Operational | ||||||
Lak... | 50,000 | 25 | Operational | ||||||
Lal... | 48,000 | Operational | |||||||
Lal... | 50,000 | Operational | |||||||
Lal... | 50,400 | 63 | Operational | ||||||
Lam... | 15,000 | Operational | |||||||
Lan... | 3,000 | Operational | |||||||
Lan... | 4,000 | 2 | Operational | ||||||
Lan... | 33,000 | Operational | |||||||
Lat... | 9,000 | 6 | Operational | ||||||
Lea... | 20,000 | Operational | |||||||
Lev... | 3,000 | 12 | Operational | ||||||
Lim... | 27,300 | 13 | Operational | ||||||
Lim... | 25,200 | 12 | Operational | ||||||
Lin... | 40,000 | 20 | Operational | ||||||
Lod... | 13,600 | 16 | Operational | ||||||
Loh... | 126,000 | Operational | |||||||
Lot... | 46,000 | Operational | |||||||
Lud... | 47,600 | 56 | Operational | ||||||
Lud... | 14,000 | Operational | |||||||
Lud... | 76,500 | 90 | Operational | ||||||
Mad... | 26,000 | Operational | |||||||
Mad... | 24,000 | 16 | Operational | ||||||
Mad... | 50,400 | 24 | Operational | ||||||
Mad... | 186,000 | Operational | |||||||
Mah... | 34,000 | Operational | |||||||
Mah... | 61,000 | Operational | |||||||
Mah... | 25,200 | 12 | Operational | ||||||
Mah... | 50,400 | 63 | Operational | ||||||
Mah... | 26,000 | 13 | Operational | ||||||
Mah... | 56,000 | Operational | |||||||
Mah... | 15,000 | Operational | |||||||
Mah... | 15,000 | Operational | |||||||
Mah... | 71,000 | Operational | |||||||
Mal... | 34,400 | 43 | Operational | ||||||
Mal... | 40,000 | 20 | Operational | ||||||
Mal... | 21,000 | 14 | Operational | ||||||
Mam... | 100,500 | 67 | Operational | ||||||
Man... | 1,500 | 1 | Operational | ||||||
Man... | 21,250 | 17 | Operational | ||||||
Man... | 28,800 | 36 | Operational | ||||||
Man... | 15,000 | 10 | Operational | ||||||
Man... | 46,000 | 23 | Operational | ||||||
Man... | 46,000 | Operational | |||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Man... | 252,000 | Operational | |||||||
Man... | 44,000 | Operational | |||||||
Map... | 62,000 | Operational | |||||||
Mat... | 34,000 | Operational | |||||||
Mat... | 14,400 | 18 | Operational | ||||||
Mat... | 7,500 | 25 | Operational | ||||||
Mat... | 45,000 | 30 | Operational | ||||||
Mat... | 3,300 | 2 | Operational | ||||||
Mat... | 15,000 | 10 | Operational | ||||||
Mel... | 2,500 | 2 | Operational | ||||||
Men... | 150,000 | Operational | |||||||
Min... | 1,500 | 1 | Operational | ||||||
Min... | 1,500 | 1 | Operational | ||||||
Min... | 1,500 | 1 | Operational | ||||||
Min... | 600 | 1 | Operational | ||||||
MNR... | 24,000 | Planned | |||||||
Mod... | 52,000 | Operational | |||||||
Mod... | 24,000 | Operational | |||||||
Mod... | 28,000 | Operational | |||||||
Moh... | 38,000 | Operational | |||||||
Mok... | 31,500 | 15 | Operational | ||||||
Mok... | 32,000 | Operational | |||||||
Mok... | 42,000 | 20 | Operational | ||||||
Mok... | 79,800 | 38 | Operational | ||||||
Mok... | 13,000 | Operational | |||||||
Mol... | 50,000 | Operational | |||||||
Mol... | 20,400 | 24 | Operational | ||||||
Mol... | 18,700 | 22 | Operational | ||||||
Mol... | 40,000 | 20 | Operational | ||||||
Mon... | 15,000 | Operational | |||||||
Mor... | 26,000 | Operational | |||||||
Mor... | 148,500 | 55 | Operational | ||||||
Mot... | 34,000 | Operational | |||||||
Mot... | 17,000 | Operational | |||||||
Mot... | 26,350 | 31 | Operational | ||||||
Mot... | 1,250 | 1 | Operational | ||||||
Mot... | 3,600 | 2 | Operational | ||||||
Mot... | 450 | 2 | Operational | ||||||
Mot... | 4,000 | 2 | Operational | ||||||
Mot... | 2,000 | 2 | Operational | ||||||
Mot... | 600 | 1 | Operational | ||||||
Mot... | 1,500 | 1 | Operational | ||||||
MPR... | 100,000 | 50 | Operational | ||||||
MPR... | 100,000 | 50 | Operational | ||||||
MSP... | 124,000 | Operational | |||||||
Mul... | 20,000 | Operational | |||||||
Mun... | 42,500 | Operational | |||||||
Mun... | 12,000 | Operational | |||||||
Mup... | 13,000 | Operational | |||||||
Mup... | 10,000 | Operational | |||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Mup... | 22,000 | Operational | |||||||
Mut... | 21,000 | 14 | Operational | ||||||
Mut... | 19,000 | Operational | |||||||
Myt... | 5,940 | 9 | Operational | ||||||
Nag... | 2,500 | 2 | Operational | ||||||
Nag... | 1,500 | 2 | Operational | ||||||
Nag... | 2,250 | 3 | Operational | ||||||
Nag... | 1,500 | 2 | Operational | ||||||
Nag... | 3,000 | 4 | Operational | ||||||
Nag... | 2,250 | 3 | Operational | ||||||
Nag... | 750 | 1 | Operational | ||||||
Nag... | 6,750 | 9 | Operational | ||||||
Nag... | 1,500 | 2 | Operational | ||||||
Nag... | 6,600 | 4 | Operational | ||||||
Nag... | 1,250 | 1 | Operational | ||||||
Nag... | 1,250 | 1 | Operational | ||||||
Nag... | 81,000 | Operational | |||||||
Nag... | 13,000 | Operational | |||||||
Nak... | 4,200 | 2 | Operational | ||||||
Nak... | 10,500 | Operational | |||||||
Nak... | 10,500 | Operational | |||||||
Nal... | 50,400 | 63 | Operational | ||||||
Nan... | 6,600 | 11 | Operational | ||||||
Nan... | 5,000 | 4 | Operational | ||||||
Nan... | 24,000 | Operational | |||||||
Nar... | 3,000 | 2 | Operational | ||||||
Nar... | 7,200 | 9 | Operational | ||||||
Nau... | 8,000 | 10 | Operational | ||||||
Nav... | 9,600 | 12 | Operational | ||||||
Naz... | 65,100 | 31 | Operational | ||||||
Naz... | 33,600 | 16 | Operational | ||||||
Net... | 16,000 | Operational | |||||||
Nid... | 62,900 | 37 | Operational | ||||||
Nid... | 27,200 | 16 | Operational | ||||||
Nim... | 64,000 | 32 | Operational | ||||||
Nim... | 36,000 | 18 | Operational | ||||||
Nim... | 100,000 | 50 | Operational | ||||||
Nim... | 100,000 | 50 | Operational | ||||||
Nip... | 36,000 | Operational | |||||||
Nip... | 40,000 | Operational | |||||||
Nip... | 20,000 | 10 | Operational | ||||||
Nip... | 20,000 | 10 | Operational | ||||||
Nip... | 18,000 | 9 | Operational | ||||||
Nir... | 60,000 | Operational | |||||||
Niv... | 21,000 | Operational | |||||||
Niv... | 4,800 | 6 | Operational | ||||||
Niv... | 15,400 | 44 | Operational | ||||||
Niw... | 21,000 | Operational | |||||||
Nuz... | 58,000 | Operational | |||||||
Oli... | 52,000 | Operational | |||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
ONG... | 500,000 | Planned | |||||||
ONG... | 10,000 | Planned | |||||||
ONG... | 1 | Planned | |||||||
Ood... | 9,350 | Operational | |||||||
Orc... | 67,000 | Operational | |||||||
Osh... | 3,200 | 4 | Operational | ||||||
Osi... | 33,000 | Operational | |||||||
Ott... | 50,000 | Operational | |||||||
Pal... | 25,000 | Operational | |||||||
Pal... | 63,000 | Operational | |||||||
Pal... | 25,500 | 15 | Operational | ||||||
Pal... | 6,000 | 10 | Operational | ||||||
Pal... | 29,700 | 18 | Operational | ||||||
Pal... | 22,500 | 15 | Operational | ||||||
Pal... | 10,800 | 18 | Operational | ||||||
Pan... | 3,750 | 5 | Operational | ||||||
Pan... | 34,500 | Operational | |||||||
Pan... | 36,000 | 24 | Operational | ||||||
Par... | 3,000 | 2 | Operational | ||||||
Pat... | 50,000 | 25 | Operational | ||||||
Pat... | 49,300 | Operational | |||||||
Pat... | 250,000 | Operational | |||||||
Pay... | 40,000 | Operational | |||||||
Paz... | 4,250 | 5 | Operational | ||||||
Paz... | 3,000 | 4 | Operational | ||||||
Per... | 99,000 | 66 | Operational | ||||||
Per... | 120,000 | 60 | Operational | ||||||
Per... | 20,000 | 10 | Operational | ||||||
Per... | 12,000 | Operational | |||||||
Pho... | 49,500 | 33 | Operational | ||||||
Pin... | 400,000 | Under construction | |||||||
Pit... | 21,000 | Operational | |||||||
Poh... | 9,800 | 28 | Operational | ||||||
Poh... | 15,000 | 25 | Operational | ||||||
Poh... | 12,500 | 10 | Operational | ||||||
Poh... | 7,500 | 6 | Operational | ||||||
Poh... | 3,850 | 11 | Operational | ||||||
Pok... | 7,500 | 6 | Operational | ||||||
Pok... | 3,850 | 11 | Operational | ||||||
Pol... | 24,000 | Operational | |||||||
Poo... | 10,000 | Operational | |||||||
Poo... | 10,500 | 35 | Operational | ||||||
Poo... | 100,000 | Operational | |||||||
Poo... | 17,000 | Operational | |||||||
Poo... | 200,000 | Operational | |||||||
Pot... | 23,000 | Operational | |||||||
Pot... | 44,000 | Operational | |||||||
Pot... | 21,000 | Operational | |||||||
Pra... | 62,000 | Operational | |||||||
Pra... | 62,000 | 31 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Pra... | 64,000 | 40 | Operational | ||||||
Pul... | 5,000 | 10 | Operational | ||||||
Pus... | 4,000 | 5 | Operational | ||||||
Pus... | 42,000 | Operational | |||||||
Put... | 20,000 | Operational | |||||||
Put... | 13,500 | 54 | Operational | ||||||
Rad... | 1,500 | 1 | Operational | ||||||
Rad... | 3,000 | 2 | Operational | ||||||
Rad... | 10,500 | 7 | Operational | ||||||
Rad... | 70,000 | Operational | |||||||
Rad... | 15,000 | 10 | Operational | ||||||
Rai... | 50,000 | Operational | |||||||
Rai... | 22,000 | Operational | |||||||
Rai... | 20,000 | Operational | |||||||
Raj... | 13,000 | Operational | |||||||
Raj... | 100,000 | Operational | |||||||
Raj... | 37,000 | Operational | |||||||
Raj... | 68,000 | Operational | |||||||
Raj... | 50,000 | 25 | Operational | ||||||
Raj... | 50,400 | 63 | Operational | ||||||
Raj... | 24,000 | 30 | Operational | ||||||
Raj... | 25,000 | Operational | |||||||
Raj... | 26,000 | Operational | |||||||
Raj... | 32,000 | Operational | |||||||
Raj... | 18,000 | Operational | |||||||
Raj... | 101,200 | 46 | Operational | ||||||
Raj... | 25,200 | 12 | Operational | ||||||
Raj... | 28,000 | 14 | Operational | ||||||
Raj... | 99,900 | 37 | Operational | ||||||
Raj... | 11,000 | Operational | |||||||
Raj... | 10,000 | Operational | |||||||
Raj... | 10,000 | Operational | |||||||
Raj... | 29,000 | Operational | |||||||
Ral... | 98,700 | 47 | Operational | ||||||
Ral... | 98,700 | 47 | Operational | ||||||
Ram... | 10,000 | Operational | |||||||
Ram... | 25,000 | 20 | Operational | ||||||
Ram... | 43,000 | Operational | |||||||
Ram... | 2,000 | Operational | |||||||
Ram... | 30,000 | Operational | |||||||
Rap... | 600 | 1 | Operational | ||||||
Ras... | 26,000 | Operational | |||||||
Ras... | 21,000 | Operational | |||||||
Ras... | 15,000 | Operational | |||||||
Ras... | 16,000 | Operational | |||||||
Ras... | 25,500 | Operational | |||||||
Ras... | 24,000 | Operational | |||||||
Ras... | 10,000 | Operational | |||||||
Rat... | 34,000 | Operational | |||||||
Rat... | 7,500 | 5 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Rat... | 600 | 1 | Operational | ||||||
Rat... | 34,000 | Operational | |||||||
Rat... | 24,000 | 30 | Operational | ||||||
Rat... | 16,000 | 20 | Operational | ||||||
Rat... | 15,000 | Operational | |||||||
Rat... | 14,000 | Operational | |||||||
Rat... | 12,000 | Operational | |||||||
Rat... | 50,000 | Operational | |||||||
Rat... | 170,000 | 85 | Operational | ||||||
Rat... | 100,000 | Under construction | |||||||
Rat... | 65,600 | 41 | Operational | ||||||
Rat... | 35,200 | 22 | Operational | ||||||
Ray... | 42,000 | Operational | |||||||
Ray... | 64,600 | 38 | Operational | ||||||
Ray... | 51,200 | 32 | Operational | ||||||
Ray... | 50,000 | 25 | Operational | ||||||
Ray... | 50,000 | 25 | Operational | ||||||
Ray... | 50,000 | 25 | Operational | ||||||
Ray... | 28,000 | 14 | Operational | ||||||
Roa... | 39,000 | Operational | |||||||
Roj... | 100,000 | 50 | Operational | ||||||
Roj... | 54,000 | 27 | Operational | ||||||
Roj... | 22,000 | Operational | |||||||
Roj... | 50,000 | 25 | Operational | ||||||
Roj... | 50,000 | 25 | Operational | ||||||
Roj... | 26,000 | 13 | Operational | ||||||
Roj... | 50,000 | 25 | Operational | ||||||
Roj... | 60,000 | Operational | |||||||
Ron... | 40,000 | 20 | Operational | ||||||
Ros... | 510,000 | Operational | |||||||
RRB... | 12,000 | Operational | |||||||
S12... | 2,100 | 1 | Operational | ||||||
Sad... | 18,000 | Operational | |||||||
Sad... | 170,000 | Operational | |||||||
Sad... | 61,250 | 49 | Operational | ||||||
Sad... | 13,200 | 22 | Operational | ||||||
Sad... | 12,000 | Operational | |||||||
Sad... | 18,000 | Operational | |||||||
Sad... | 24,000 | Operational | |||||||
Sad... | 50,000 | 25 | Operational | ||||||
Sad... | 48,000 | Operational | |||||||
Sad... | 15,000 | Operational | |||||||
Sad... | 15,000 | Operational | |||||||
Sag... | 200 | Operational | |||||||
Sai... | 14,000 | Operational | |||||||
Sai... | 15,000 | Operational | |||||||
Sai... | 14,000 | Operational | |||||||
Sai... | 105,000 | Operational | |||||||
Sal... | 8,000 | Operational | |||||||
Sam... | 88,800 | 111 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Sam... | 10,000 | Operational | |||||||
Sam... | 4,800 | 6 | Operational | ||||||
Sam... | 50,400 | 63 | Operational | ||||||
Sam... | 50,400 | 63 | Operational | ||||||
Sam... | 1,500 | 1 | Operational | ||||||
San... | 15,000 | Operational | |||||||
San... | 15,000 | Operational | |||||||
San... | 50,000 | Operational | |||||||
San... | 14,000 | Operational | |||||||
San... | 15,000 | Operational | |||||||
San... | 50,000 | Operational | |||||||
San... | 3,000 | 2 | Operational | ||||||
San... | 4,500 | 3 | Operational | ||||||
San... | 1,250 | 1 | Operational | ||||||
Sat... | 6,250 | 5 | Operational | ||||||
Sat... | 42,700 | 122 | Operational | ||||||
Sat... | 14,700 | 7 | Operational | ||||||
Sat... | 1,500 | Operational | |||||||
Sat... | 174,600 | 97 | Operational | ||||||
Sat... | 24,000 | 12 | Operational | ||||||
Sat... | 12,000 | 6 | Operational | ||||||
Sat... | 1,250 | 1 | Operational | ||||||
Sat... | 60,000 | 30 | Operational | ||||||
Sau... | 82,400 | 103 | Operational | ||||||
Sau... | 10,500 | 7 | Operational | ||||||
Sau... | 39,200 | 49 | Operational | ||||||
Sau... | 31,200 | 52 | Operational | ||||||
Sau... | 500 | 2 | Operational | ||||||
Sau... | 100,000 | 50 | Operational | ||||||
Sav... | 100,300 | 118 | Operational | ||||||
Sav... | 32,000 | 16 | Operational | ||||||
Sav... | 37,000 | Operational | |||||||
SCM... | 13,000 | Operational | |||||||
SEC... | 250,000 | Operational | |||||||
Ser... | 21,000 | Operational | |||||||
Sha... | 26,000 | Operational | |||||||
Sha... | 21,000 | Operational | |||||||
Shi... | 1,650 | 1 | Operational | ||||||
Shi... | 3,200 | 4 | Operational | ||||||
Shi... | 12,800 | 16 | Operational | ||||||
Shr... | 120,000 | Operational | |||||||
Sid... | 13,000 | Operational | |||||||
Sid... | 252,000 | 120 | Operational | ||||||
Sim... | 27,000 | 18 | Operational | ||||||
Sim... | 10,500 | 5 | Operational | ||||||
Sin... | 22,000 | Operational | |||||||
Sin... | 10,000 | Operational | |||||||
Sin... | 1,500 | 1 | Operational | ||||||
Sin... | 12,600 | 6 | Operational | ||||||
Sip... | 60,000 | Operational | |||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Sip... | 50,400 | 63 | Operational | ||||||
Sip... | 50,400 | 63 | Operational | ||||||
Sir... | 6,250 | 5 | Operational | ||||||
Sod... | 24,000 | 30 | Operational | ||||||
Sod... | 6,250 | 5 | Operational | ||||||
Sod... | 2,500 | 2 | Operational | ||||||
Sod... | 2,500 | 2 | Operational | ||||||
Sog... | 50,000 | Operational | |||||||
Sog... | 106,250 | Operational | |||||||
Sor... | 36,000 | Operational | |||||||
Sou... | 3,300 | 2 | Operational | ||||||
Sou... | 2,500 | 2 | Operational | ||||||
Sou... | 28,000 | Operational | |||||||
Suk... | 64,000 | Operational | |||||||
Suk... | 22,000 | Operational | |||||||
Suk... | 24,000 | Operational | |||||||
Sup... | 2,000 | 2 | Operational | ||||||
Sup... | 17,000 | Operational | |||||||
Sup... | 20,000 | 20 | Operational | ||||||
Sup... | 57,000 | Operational | |||||||
Sur... | 30,000 | Operational | |||||||
Sur... | 16,500 | 10 | Operational | ||||||
Sur... | 18,000 | 10 | Operational | ||||||
Sus... | 15,000 | Operational | |||||||
Sut... | 21,000 | Operational | |||||||
Sut... | 3,000 | 2 | Operational | ||||||
Sut... | 600 | 1 | Operational | ||||||
Sut... | 600 | 1 | Operational | ||||||
Sut... | 1,500 | 1 | Operational | ||||||
Sut... | 4,500 | 3 | Operational | ||||||
Tad... | 50,400 | 63 | Operational | ||||||
Tad... | 44,000 | 55 | Operational | ||||||
Tad... | 47,000 | Operational | |||||||
Tad... | 24,000 | Operational | |||||||
Tag... | 46,000 | 23 | Operational | ||||||
Tag... | 46,000 | 23 | Operational | ||||||
Tag... | 54,000 | 27 | Operational | ||||||
Tag... | 100,000 | 50 | Operational | ||||||
Tag... | 46,000 | 23 | Operational | ||||||
Tam... | 250,000 | Operational | |||||||
Tam... | 500,000 | Planned | |||||||
Tam... | Planned | ||||||||
Tam... | 500,000 | Planned | |||||||
Tam... | 500,000 | Planned | |||||||
Tam... | 200,000 | Planned | |||||||
Tan... | 60,000 | 30 | Operational | ||||||
Tan... | 60,000 | 30 | Operational | ||||||
Tar... | 100,000 | Operational | |||||||
Tat... | 161,000 | Operational | |||||||
Teb... | 24,000 | Operational | |||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
TEE... | 18,000 | Operational | |||||||
TEE... | 111,000 | Operational | |||||||
Tej... | 31,500 | 15 | Operational | ||||||
Tej... | 100,800 | 48 | Operational | ||||||
Tej... | 50,400 | 24 | Operational | ||||||
Tej... | 50,400 | 24 | Operational | ||||||
Tel... | 23,100 | 14 | Operational | ||||||
Ten... | 5,100 | 6 | Operational | ||||||
Ten... | 2,700 | 12 | Operational | ||||||
Tha... | 8,000 | 10 | Operational | ||||||
Tha... | 8,000 | 10 | Operational | ||||||
Tha... | 13,000 | Operational | |||||||
The... | 6,600 | 4 | Operational | ||||||
The... | 3,000 | 2 | Operational | ||||||
The... | 49,500 | 33 | Operational | ||||||
The... | 300,000 | Operational | |||||||
The... | 9,900 | 6 | Operational | ||||||
The... | 49,500 | 30 | Operational | ||||||
The... | 49,500 | 30 | Operational | ||||||
Thi... | 4,950 | 3 | Operational | ||||||
Thi... | 47,850 | 29 | Operational | ||||||
Thi... | 3,300 | 2 | Operational | ||||||
Thi... | 6,750 | 9 | Operational | ||||||
Thi... | 15,000 | 60 | Operational | ||||||
Thi... | 1,500 | 1 | Operational | ||||||
Tho... | 300,000 | Operational | |||||||
Tho... | 8,100 | 36 | Operational | ||||||
Tho... | 15,600 | 52 | Operational | ||||||
Tho... | 10,800 | 18 | Operational | ||||||
Tho... | 6,400 | 8 | Operational | ||||||
Tih... | 30,000 | Operational | |||||||
Tin... | 10,400 | Operational | |||||||
Tin... | 20,000 | 25 | Operational | ||||||
Tir... | 54,000 | 36 | Operational | ||||||
Tir... | 30,000 | Operational | |||||||
Tir... | 20,000 | Operational | |||||||
Tir... | 10,500 | 7 | Operational | ||||||
Tir... | 51,000 | 34 | Operational | ||||||
Tir... | 24,000 | Operational | |||||||
Tir... | 100,000 | Operational | |||||||
Tir... | 41,000 | Operational | |||||||
Tir... | 62,000 | Operational | |||||||
Tir... | 32,000 | Operational | |||||||
Tir... | 30,000 | Operational | |||||||
Tir... | 19,000 | Operational | |||||||
Tir... | 36,000 | Operational | |||||||
Tir... | 22,000 | Operational | |||||||
Tir... | 15,000 | Operational | |||||||
Tir... | 540,000 | Under construction | |||||||
Tir... | 147,000 | Operational | |||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Tir... | 153,000 | Operational | |||||||
Tit... | 21,250 | 17 | Operational | ||||||
Tiw... | 8,000 | 10 | Operational | ||||||
Tuk... | 18,000 | Operational | |||||||
Tul... | 56,000 | Operational | |||||||
Tum... | 68,800 | 86 | Operational | ||||||
Tup... | 56,100 | 34 | Operational | ||||||
Tut... | 165,000 | Operational | |||||||
Tut... | 32,000 | Under construction | |||||||
Tut... | 300,000 | Operational | |||||||
Tut... | 252,000 | Operational | |||||||
Tut... | 250,000 | Operational | |||||||
Tut... | 24,000 | Operational | |||||||
Uda... | 1,500 | 1 | Operational | ||||||
Uda... | 6,000 | 4 | Operational | ||||||
Udu... | 11,200 | 14 | Operational | ||||||
Udu... | 19,000 | Operational | |||||||
Udu... | 17,000 | Operational | |||||||
Udu... | 13,000 | Operational | |||||||
Ukk... | 2,500 | 2 | Operational | ||||||
Umr... | 24,800 | 31 | Operational | ||||||
Unc... | 25,000 | Operational | |||||||
Uru... | 3,000 | 2 | Operational | ||||||
Uth... | 700 | 1 | Operational | ||||||
Uth... | 7,500 | 6 | Operational | ||||||
Uth... | 10,000 | 8 | Operational | ||||||
Uth... | 28,000 | Operational | |||||||
V.K... | 9,900 | 6 | Operational | ||||||
Vad... | 4,200 | 1 | Operational | ||||||
Vad... | 2,550 | 3 | Operational | ||||||
Vag... | 100,500 | 67 | Operational | ||||||
Vag... | 21,000 | Operational | |||||||
Vai... | 12,000 | Operational | |||||||
Vai... | 24,000 | Operational | |||||||
Vaj... | 63,000 | 30 | Operational | ||||||
Vaj... | 27,300 | 13 | Operational | ||||||
Vaj... | 105,000 | 50 | Operational | ||||||
Van... | 56,000 | Operational | |||||||
Van... | 600 | 1 | Operational | ||||||
Van... | 600 | 1 | Operational | ||||||
Van... | 600 | 1 | Operational | ||||||
Van... | 7,000 | 7 | Operational | ||||||
Van... | 21,000 | 28 | Operational | ||||||
Van... | 5,700 | 19 | Operational | ||||||
Van... | 12,600 | 21 | Operational | ||||||
Van... | 750 | 3 | Operational | ||||||
Van... | 1,000 | 4 | Operational | ||||||
Van... | 225 | 1 | Operational | ||||||
Van... | 5,500 | 11 | Operational | ||||||
Van... | 21,750 | 29 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Van... | 189,000 | 540 | Operational | ||||||
Var... | 9,000 | 15 | Operational | ||||||
Var... | 4,000 | 5 | Operational | ||||||
Var... | 6,600 | 4 | Operational | ||||||
Var... | 15,000 | Operational | |||||||
Var... | 32,000 | Operational | |||||||
Vas... | 20,000 | Operational | |||||||
Vas... | 45,000 | Operational | |||||||
Vas... | 30,000 | Operational | |||||||
Vas... | 38,000 | Operational | |||||||
Vas... | 45,000 | 30 | Operational | ||||||
Vas... | 27,000 | 18 | Operational | ||||||
Vas... | 22,500 | 15 | Operational | ||||||
Vas... | 49,500 | 33 | Operational | ||||||
Vay... | 20,000 | Operational | |||||||
Vee... | 100,800 | Operational | |||||||
Vee... | 16,500 | 10 | Operational | ||||||
Vee... | 16,500 | 10 | Operational | ||||||
Vee... | 31,500 | 15 | Operational | ||||||
Vee... | 16,000 | Operational | |||||||
Vej... | 10,000 | Operational | |||||||
Vej... | 12,000 | Operational | |||||||
Vel... | 1,200 | 2 | Operational | ||||||
Vel... | 50,000 | Operational | |||||||
Vep... | 1,250 | 1 | Operational | ||||||
Ver... | 105,000 | Operational | |||||||
Ver... | 24,000 | 16 | Operational | ||||||
Vij... | 44,000 | Operational | |||||||
Vij... | 24,000 | Operational | |||||||
Vij... | 10,000 | Operational | |||||||
Vij... | 20,000 | Operational | |||||||
Vij... | 1,500 | 6 | Operational | ||||||
Vin... | 16,500 | 11 | Operational | ||||||
Vin... | 4,200 | 2 | Operational | ||||||
Vin... | 12,000 | Operational | |||||||
Vio... | 33,000 | Operational | |||||||
Vis... | 32,000 | Operational | |||||||
Vis... | 1,200 | 2 | Operational | ||||||
Vis... | 600 | 1 | Operational | ||||||
Vis... | 42,000 | Operational | |||||||
Vys... | 50,000 | 25 | Operational | ||||||
Vys... | 50,000 | 25 | Operational | ||||||
Wel... | 50,400 | 24 | Operational | ||||||
Wel... | 25,200 | 12 | Operational | ||||||
Yel... | 25,500 | 17 | Operational | ||||||
Yel... | 1,700 | 1 | Operational | ||||||
Yel... | 28,900 | 17 | Operational | ||||||
Yel... | 15,300 | 9 | Operational | ||||||
Yer... | 148,800 | 186 | Operational | ||||||
Zah... | 31,500 | 15 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Zai... | 60,000 | Operational | |||||||
|