|
General data | Wind farms |
By zones | Map | Media | IREC Index |
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Aische-en-Refail | 2,999 | 1 | Operational | ||||||
Albertdok Oost | 10,500 | 3 | Operational | ||||||
Albertdok Oost | 2,350 | 1 | Operational | ||||||
Amel | 10,000 | 5 | Operational | ||||||
Antwerpen | 6,400 | 2 | Operational | ||||||
Antwerpen | 3,200 | 1 | Operational | ||||||
Antwerpen | 3,200 | 1 | Operational | ||||||
Antwerpen BASF | 10,000 | 5 | Operational | ||||||
Antwerpen Haven | 4,000 | 2 | Operational | ||||||
Antwerpen Haven | 3,000 | 1 | Dismantled | ||||||
Antwerpen Haven | 8,000 | 4 | Operational | ||||||
Antwerpen Haven | 3,400 | 1 | Operational | ||||||
Antwerpen Haven | 7,050 | 3 | Operational | ||||||
Antwerpen Haven | 4,700 | 2 | Operational | ||||||
Antwerpen Haven | 9,000 | 3 | Operational | ||||||
Antwerpen Haven | 6,000 | 2 | Operational | ||||||
Antwerpen Haven | 15,000 | 5 | Operational | ||||||
Antwerpen Haven | 24,000 | 8 | Operational | ||||||
Antwerpen Haven | 1 | Operational | |||||||
Antwerpen Haven | 4,000 | 1 | Operational | ||||||
Antwerpen Haven Linkeroever | 23,000 | Operational | |||||||
Arendonk | 16,100 | 7 | Operational | ||||||
Arendonk | 2,300 | 1 | Operational | ||||||
Arlon-Messancy | 12,000 | 6 | Operational | ||||||
Asse-Mollem | 8,000 | 4 | Operational | ||||||
Assenede | 12,000 | 6 | Operational | ||||||
Assesse | 2,400 | 3 | Operational | ||||||
Autelbas | 2,000 | 1 | Operational | ||||||
Autover | 800 | 1 | Operational | ||||||
Avelgem | 6,900 | 3 | Operational | ||||||
B-Park | 4,600 | 2 | Operational | ||||||
Baileux | 10,000 | 4 | Operational | ||||||
Baileux | 5,000 | 2 | Operational | ||||||
Baileux | 8,250 | 3 | Operational | ||||||
Baileux | 2,350 | 1 | Operational | ||||||
Balen | 4,700 | 2 | Operational | ||||||
Bassenge | 17,850 | 9 | Operational | ||||||
Beersel | 2,050 | 1 | Operational | ||||||
Beersel | 2,000 | 1 | Operational | ||||||
Beersel - Sint-Pieters-Leeuw | 2,050 | 1 | Operational | ||||||
Beersel - Sint-Pieters-Leeuw | 4,200 | 2 | Operational | ||||||
Bekaert | 4,100 | 2 | Operational | ||||||
Bekaert | 2,050 | 1 | Operational | ||||||
Beloeil | 20,700 | 9 | Operational | ||||||
Beltanco | 2,300 | 1 | Operational | ||||||
Belwind Alstom Haliade Demonstration | 6,000 | 1 | Operational | ||||||
Belwind I | 165,000 | 55 | Operational | ||||||
Belwind II | 165,000 | 50 | Operational | ||||||
Beringen | 6,150 | 3 | Operational | ||||||
Beringen | 4,700 | 2 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Ber... | 4,600 | 2 | Operational | ||||||
Ber... | 2,000 | 1 | Operational | ||||||
Ber... | 2,000 | 1 | Operational | ||||||
Ber... | 4,000 | 2 | Operational | ||||||
Ber... | 9,200 | 4 | Operational | ||||||
Ber... | 6,000 | 3 | Operational | ||||||
Ber... | 7,500 | 3 | Operational | ||||||
Ber... | 10,000 | 4 | Operational | ||||||
Bev... | 3,000 | 1 | Operational | ||||||
Bev... | 2,300 | 1 | Operational | ||||||
Bev... | 3,200 | 1 | Operational | ||||||
Bev... | 9,600 | 3 | Operational | ||||||
Bev... | 6,000 | 2 | Operational | ||||||
Bev... | 9,000 | 3 | Operational | ||||||
Bev... | 6,400 | 2 | Operational | ||||||
Bev... | 3,200 | 1 | Operational | ||||||
Bev... | 3,600 | 1 | Operational | ||||||
Bev... | 4,000 | 2 | Operational | ||||||
Biè... | 14,000 | 7 | Operational | ||||||
Bil... | 2,300 | 1 | Operational | ||||||
Bob... | 660 | 1 | Operational | ||||||
Bon... | 16,000 | 8 | Operational | ||||||
Bon... | 2,000 | 1 | Operational | ||||||
Bor... | 4,600 | 2 | Operational | ||||||
Bre... | 3,000 | 1 | Operational | ||||||
Bre... | 4,100 | 2 | Operational | ||||||
Bre... | 2,050 | 1 | Operational | ||||||
Bru... | 12,600 | 7 | Operational | ||||||
Bru... | 1,600 | 4 | Operational | ||||||
Bru... | 7,200 | 12 | Dismantled | ||||||
Bru... | 11,500 | 5 | Operational | ||||||
Bru... | 6,000 | 2 | Operational | ||||||
Bru... | 6,000 | 2 | Operational | ||||||
Bru... | 2,300 | 1 | Operational | ||||||
Bru... | 9,200 | 4 | Operational | ||||||
Bul... | 8,000 | 4 | Operational | ||||||
Bul... | 12,000 | 6 | Operational | ||||||
Cel... | 8,000 | 4 | Operational | ||||||
Cen... | 4,600 | 2 | Operational | ||||||
Cer... | 22,000 | 11 | Operational | ||||||
Che... | 800 | 1 | Operational | ||||||
Cin... | 15,000 | 6 | Operational | ||||||
Cou... | 10,800 | 3 | Operational | ||||||
Cou... | 2,000 | 1 | Operational | ||||||
DEM... | 100 | 1 | Operational | ||||||
Den... | 2,000 | 1 | Operational | ||||||
Des... | 4,000 | 2 | Operational | ||||||
Dhu... | 14,000 | Operational | |||||||
Die... | 4,500 | 1 | Operational | ||||||
Dil... | 6,000 | 3 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Dil... | 6,600 | 3 | Operational | ||||||
Din... | 20,400 | 6 | Operational | ||||||
Din... | 3,200 | 1 | Operational | ||||||
Din... | 2,200 | 1 | Operational | ||||||
Dou... | 8,000 | 4 | Operational | ||||||
Dou... | 6,000 | 3 | Operational | ||||||
Dou... | 4,000 | 2 | Operational | ||||||
Dou... | 4,000 | 2 | Operational | ||||||
Dou... | 2,300 | 1 | Operational | ||||||
Dou... | 4,600 | 2 | Operational | ||||||
Dou... | 4,700 | 2 | Operational | ||||||
Dou... | 4,700 | 2 | Operational | ||||||
Eca... | 9,600 | 3 | Operational | ||||||
Eek... | 3,600 | 2 | Operational | ||||||
Eek... | 500 | 1 | Operational | ||||||
Eek... | 1,800 | 1 | Operational | ||||||
Eek... | 4,600 | 2 | Operational | ||||||
Eek... | 2,000 | 1 | Operational | ||||||
Eek... | 600 | 1 | Dismantled | ||||||
Eek... | 4,600 | 2 | Operational | ||||||
Eek... | 10,250 | 5 | Operational | ||||||
Eek... | 9,200 | 4 | Operational | ||||||
Eek... | 6,600 | 3 | Operational | ||||||
Eek... | 2,200 | 1 | Operational | ||||||
Eek... | 2,050 | 1 | Operational | ||||||
Ehe... | 15,000 | 5 | Operational | ||||||
Ere... | 3,450 | 1 | Operational | ||||||
Est... | 4,400 | 2 | Operational | ||||||
Est... | 6,600 | 3 | Operational | ||||||
Est... | 6,000 | 1 | Operational | ||||||
Est... | 45,000 | 6 | Operational | ||||||
Est... | 30,000 | 4 | Operational | ||||||
Eve... | 2,050 | 1 | Operational | ||||||
Fal... | 9,200 | 4 | Operational | ||||||
Fau... | 8,000 | 4 | Operational | ||||||
Fau... | 2,000 | 1 | Operational | ||||||
Fel... | 12,300 | 6 | Operational | ||||||
Fel... | 2,050 | 1 | Dismantled | ||||||
Fel... | 2,200 | 1 | Operational | ||||||
Fel... | 7,200 | 2 | Operational | ||||||
Fer... | 4,600 | 2 | Operational | ||||||
Fer... | 2,300 | 1 | Operational | ||||||
Fer... | 10,800 | 3 | Operational | ||||||
Fer... | 3,600 | 1 | Operational | ||||||
Flo... | 2,350 | 1 | Operational | ||||||
Flo... | 7,050 | 3 | Operational | ||||||
Flo... | 9,200 | 4 | Operational | ||||||
Flo... | 6,900 | 3 | Operational | ||||||
Fos... | 22,000 | 11 | Operational | ||||||
Fos... | 9,200 | 4 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Fra... | 2,050 | 1 | Operational | ||||||
Fra... | 2,000 | 1 | Operational | ||||||
Fra... | 2,050 | 1 | Operational | ||||||
Fra... | 2,000 | 1 | Operational | ||||||
Fro... | 25,000 | 10 | Operational | ||||||
Fro... | 12,000 | 6 | Operational | ||||||
Gee... | 6,000 | 3 | Operational | ||||||
Gee... | 6,000 | 3 | Operational | ||||||
Gee... | 6,600 | 3 | Operational | ||||||
Gee... | 3,800 | 1 | Operational | ||||||
Gee... | 3,800 | 1 | Operational | ||||||
Gee... | 3,800 | 1 | Operational | ||||||
Gem... | 7,050 | 3 | Operational | ||||||
Gem... | 7,050 | 3 | Operational | ||||||
Gen... | 4,000 | 2 | Operational | ||||||
Gen... | 2,000 | 1 | Operational | ||||||
Gen... | 6,000 | 3 | Operational | ||||||
Gen... | 8,000 | 4 | Operational | ||||||
Gen... | 2,000 | 1 | Operational | ||||||
Gen... | 2,000 | 1 | Operational | ||||||
Gen... | 2,000 | 1 | Operational | ||||||
Gen... | 2,000 | 1 | Operational | ||||||
Gen... | 6,000 | 3 | Operational | ||||||
Gen... | 2,000 | 1 | Operational | ||||||
Gen... | 2,300 | 1 | Dismantled | ||||||
Gen... | 8,000 | 4 | Operational | ||||||
Gen... | 3,400 | 1 | Operational | ||||||
Gen... | 13,600 | 4 | Operational | ||||||
Gen... | 10,200 | 3 | Operational | ||||||
Gen... | 10,500 | 3 | Operational | ||||||
Gen... | 6,900 | 2 | Operational | ||||||
Gen... | 7,200 | 2 | Operational | ||||||
Gen... | 4,000 | 2 | Operational | ||||||
Gen... | 6,000 | 3 | Operational | ||||||
Gen... | 6,150 | 3 | Operational | ||||||
Gen... | 4,000 | 2 | Operational | ||||||
Gen... | 2,000 | 1 | Operational | ||||||
Gen... | 6,150 | 3 | Operational | ||||||
Gen... | 17,250 | 5 | Operational | ||||||
Gen... | 7,050 | 3 | Operational | ||||||
Gen... | 9,600 | 3 | Operational | ||||||
Gen... | 22,000 | 11 | Operational | ||||||
Ger... | 4,200 | 1 | Operational | ||||||
Ges... | 16,000 | 5 | Operational | ||||||
Ges... | 3,200 | 1 | Operational | ||||||
Ghi... | 2,000 | 1 | Operational | ||||||
Ghl... | 2,000 | 1 | Operational | ||||||
Gib... | 1 | Under construction | |||||||
Gin... | 14,350 | 7 | Operational | ||||||
Gis... | 9,200 | 4 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Gis... | 4,600 | 2 | Operational | ||||||
Goe... | 5,000 | 2 | Operational | ||||||
Gou... | 11,500 | 5 | Operational | ||||||
Gou... | 6,000 | 2 | Operational | ||||||
Gou... | 3,000 | 1 | Operational | ||||||
Gou... | 6,000 | 2 | Operational | ||||||
Gou... | 18,000 | 6 | Operational | ||||||
Gra... | 10,000 | 4 | Operational | ||||||
Gre... | 4,000 | 2 | Operational | ||||||
Gre... | 4,000 | 2 | Operational | ||||||
Gre... | 6,000 | 3 | Operational | ||||||
Gre... | 4,000 | 2 | Operational | ||||||
Haa... | 9,200 | 4 | Operational | ||||||
Hal... | 11,500 | 5 | Operational | ||||||
Hal... | 11,500 | 5 | Operational | ||||||
Hal... | 3,400 | 1 | Operational | ||||||
Hal... | 1,750 | 1 | Dismantled | ||||||
Hal... | 3,400 | 1 | Operational | ||||||
Hal... | 8,800 | 3 | Operational | ||||||
Hal... | 4,000 | 2 | Operational | ||||||
Ham... | 10,400 | 3 | Operational | ||||||
Ham... | 2,150 | 1 | Operational | ||||||
Ham... | 4,000 | 2 | Operational | ||||||
Ham... | 4,100 | 2 | Operational | ||||||
Ham... | 4,200 | 1 | Operational | ||||||
Ham... | 4,600 | 2 | Operational | ||||||
Han... | 21,600 | 9 | Operational | ||||||
Has... | 400 | 1 | Dismantled | ||||||
Has... | 800 | 2 | Dismantled | ||||||
Has... | 4,000 | 2 | Operational | ||||||
Hau... | 3,000 | 1 | Operational | ||||||
Hér... | 7,500 | 3 | Operational | ||||||
Hér... | 10,500 | 3 | Operational | ||||||
Hoo... | 12,000 | 6 | Dismantled | ||||||
Hoo... | 9,600 | 3 | Operational | ||||||
Hoo... | 21,600 | 6 | Operational | ||||||
Hoo... | 9,200 | 4 | Operational | ||||||
Hoo... | 3,450 | 1 | Operational | ||||||
Hoo... | 3,450 | 1 | Operational | ||||||
Hou... | 2,300 | 1 | Operational | ||||||
Hou... | 600 | 1 | Operational | ||||||
Hou... | 800 | 1 | Operational | ||||||
Hou... | 800 | 1 | Operational | ||||||
ICO... | 44,000 | 11 | Operational | ||||||
Iep... | 20,700 | 9 | Operational | ||||||
Ize... | 4,000 | 2 | Operational | ||||||
Ize... | 4,000 | 2 | Operational | ||||||
Jup... | 17,000 | 5 | Operational | ||||||
Kal... | Dismantled | ||||||||
Kal... | 2,300 | 1 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Kal... | 2,050 | 1 | Operational | ||||||
Kal... | 6,150 | 3 | Operational | ||||||
Kap... | 1,200 | 3 | Dismantled | ||||||
Kap... | 4,400 | 2 | Operational | ||||||
Kat... | 19,200 | 6 | Operational | ||||||
Kor... | 8,000 | 4 | Operational | ||||||
Kru... | 6,000 | 3 | Operational | ||||||
Kru... | 4,000 | 2 | Operational | ||||||
Kru... | 2,300 | 1 | Operational | ||||||
La ... | 9,400 | 4 | Operational | ||||||
La ... | 3,000 | 1 | Operational | ||||||
Laa... | 4,500 | 3 | Operational | ||||||
Laa... | 4,500 | 3 | Operational | ||||||
Laa... | 3,600 | 1 | Operational | ||||||
Laa... | 4,700 | 2 | Operational | ||||||
Laa... | 2,300 | 1 | Operational | ||||||
Lam... | 19,200 | 6 | Operational | ||||||
Lan... | 4,500 | 1 | Operational | ||||||
Le ... | 9,200 | 4 | Operational | ||||||
Le ... | 2,300 | 1 | Operational | ||||||
Le ... | 2 | Under construction | |||||||
Leu... | 4,100 | 2 | Operational | ||||||
Leu... | 4,200 | 1 | Operational | ||||||
Leu... | 4,200 | 1 | Operational | ||||||
Leu... | 4,200 | 1 | Operational | ||||||
Leu... | 14,350 | 7 | Operational | ||||||
Leu... | 4,100 | 2 | Operational | ||||||
Leu... | 2,050 | 1 | Operational | ||||||
Leu... | 2,000 | 1 | Operational | ||||||
Lie... | 7,200 | 3 | Under construction | ||||||
Lie... | 7,200 | 3 | Under construction | ||||||
Loc... | 6,150 | 3 | Operational | ||||||
Lok... | 4,600 | 2 | Operational | ||||||
Lok... | 4,600 | 2 | Operational | ||||||
Lom... | 660 | 1 | Operational | ||||||
Lom... | 900 | 1 | Operational | ||||||
Lom... | 800 | 1 | Operational | ||||||
Lom... | 8,000 | 4 | Operational | ||||||
Lom... | 8,000 | 4 | Operational | ||||||
Lom... | 10,000 | 5 | Operational | ||||||
Lom... | 10,400 | 3 | Operational | ||||||
Lom... | 6,900 | 2 | Operational | ||||||
Lom... | 22,000 | Operational | |||||||
Lom... | 22,000 | Operational | |||||||
Lum... | 6,150 | 3 | Operational | ||||||
Lum... | 4,000 | 2 | Operational | ||||||
Lum... | 10,000 | 5 | Operational | ||||||
Maa... | 6,000 | 3 | Operational | ||||||
Maa... | 4,000 | 2 | Operational | ||||||
Maa... | 4,000 | 2 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Mal... | 16,100 | 7 | Operational | ||||||
Mal... | 2,350 | 1 | Operational | ||||||
Mal... | 4,400 | 2 | Operational | ||||||
Mal... | 3,600 | 1 | Operational | ||||||
Mar... | 16,000 | 8 | Operational | ||||||
Mar... | 6,000 | 3 | Operational | ||||||
Mee... | 9,600 | 3 | Operational | ||||||
Mee... | 10,200 | 3 | Operational | ||||||
Mel... | 6,900 | 3 | Operational | ||||||
Mel... | 6,000 | 3 | Operational | ||||||
Men... | 4,600 | 2 | Operational | ||||||
Mes... | 4,700 | 2 | Operational | ||||||
Mes... | 4,700 | 2 | Operational | ||||||
Min... | 3,000 | 1 | Operational | ||||||
Mod... | 12,800 | 4 | Operational | ||||||
Mod... | 3,200 | 1 | Operational | ||||||
Mol... | 9,600 | 3 | Operational | ||||||
Mol... | 2,000 | 1 | Operational | ||||||
Mol... | 8,000 | 4 | Operational | ||||||
Mol... | 5 | Under construction | |||||||
Mon... | 42,000 | 7 | Operational | ||||||
Mon... | 25,000 | 8 | Operational | ||||||
Mou... | 2,000 | 1 | Operational | ||||||
Mou... | 6,000 | 3 | Operational | ||||||
Nie... | 1,600 | 2 | Operational | ||||||
Niv... | 2,350 | 1 | Operational | ||||||
Nor... | 369,600 | 44 | Operational | ||||||
Nor... | 218,500 | 23 | Operational | ||||||
Nor... | 216,000 | 72 | Operational | ||||||
Oek... | 4,600 | 2 | Operational | ||||||
Oev... | 3,200 | 1 | Operational | ||||||
Ole... | 2,000 | 1 | Operational | ||||||
Ole... | 2,000 | 1 | Operational | ||||||
Ole... | 4,600 | 2 | Operational | ||||||
Ole... | 13,800 | 4 | Operational | ||||||
Ole... | 6,900 | 3 | Operational | ||||||
Ole... | 6,900 | 3 | Operational | ||||||
Oll... | 2,000 | 1 | Operational | ||||||
Ost... | 100 | 1 | Operational | ||||||
Pel... | 4,200 | 1 | Operational | ||||||
Per... | 4,500 | 3 | Dismantled | ||||||
Per... | 7,500 | 5 | Dismantled | ||||||
Per... | 600 | 1 | Dismantled | ||||||
Per... | 5,000 | 2 | Operational | ||||||
Per... | 6,000 | 3 | Operational | ||||||
Per... | 4,000 | 2 | Operational | ||||||
Per... | 2,500 | 1 | Operational | ||||||
Per... | 29,400 | 7 | Operational | ||||||
Per... | 7,200 | 2 | Operational | ||||||
Pla... | 17,500 | 7 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Pon... | 16,000 | 8 | Operational | ||||||
Pop... | 8,200 | 4 | Operational | ||||||
Por... | 42,000 | 14 | Operational | ||||||
Por... | 3,000 | 1 | Dismantled | ||||||
Puu... | 4,000 | 2 | Operational | ||||||
Puu... | 2,300 | 1 | Operational | ||||||
Puu... | 4,600 | 2 | Operational | ||||||
Qué... | 20,700 | 9 | Operational | ||||||
Reb... | 10,000 | Operational | |||||||
Rei... | 13,600 | 4 | Operational | ||||||
Rei... | 3,400 | 1 | Operational | ||||||
Ren... | 309,000 | 42 | Operational | ||||||
Ret... | 12,000 | 3 | Operational | ||||||
Rie... | 3,200 | 1 | Operational | ||||||
Rie... | 9,600 | 3 | Operational | ||||||
Rie... | 10,350 | 3 | Operational | ||||||
Rij... | 4,600 | 2 | Operational | ||||||
Rod... | 12,000 | Operational | |||||||
Roe... | 5,000 | 2 | Operational | ||||||
Roe... | 7,500 | 3 | Operational | ||||||
Sai... | 500 | 1 | Operational | ||||||
Sai... | 10,000 | 5 | Operational | ||||||
Sai... | 2,500 | 2 | Dismantled | ||||||
Sai... | 15,000 | 6 | Operational | ||||||
Sai... | 1,250 | 1 | Dismantled | ||||||
Sai... | 3,750 | 3 | Dismantled | ||||||
Sai... | 18,000 | Operational | |||||||
Sal... | 9,600 | 3 | Operational | ||||||
Sch... | 4,500 | 3 | Operational | ||||||
Sch... | 6,800 | 2 | Operational | ||||||
Sea... | 235,200 | 28 | Operational | ||||||
Sea... | 252,000 | 30 | Operational | ||||||
Sen... | 2,300 | 1 | Operational | ||||||
Sen... | 2,350 | 1 | Operational | ||||||
Sen... | 2,350 | 1 | Operational | ||||||
Sib... | 7,050 | 3 | Operational | ||||||
Sil... | 4,400 | 2 | Operational | ||||||
Sil... | 10,350 | 3 | Operational | ||||||
Sin... | 8,200 | 4 | Operational | ||||||
Sin... | 6,150 | 3 | Operational | ||||||
Sin... | 2,350 | 1 | Operational | ||||||
Sin... | 4,100 | 2 | Operational | ||||||
Siv... | 10,500 | 4 | Operational | ||||||
Soi... | 4,100 | 2 | Operational | ||||||
Som... | 6,000 | 4 | Operational | ||||||
Som... | 3,000 | 2 | Operational | ||||||
Spy... | 10,200 | 3 | Operational | ||||||
Spy... | 6,900 | 2 | Operational | ||||||
Spy... | 2,200 | 1 | Operational | ||||||
Ste... | 6,000 | 3 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Sto... | 13,500 | 3 | Operational | ||||||
Str... | 3,000 | 1 | Operational | ||||||
Tar... | 9,000 | 6 | Operational | ||||||
Tem... | 3,000 | 1 | Operational | ||||||
Ter... | 2,300 | 1 | Operational | ||||||
Ter... | 2,300 | 1 | Operational | ||||||
Ter... | 4,600 | 2 | Operational | ||||||
Ter... | 2,300 | 1 | Operational | ||||||
Tes... | 2,000 | 1 | Operational | ||||||
Tes... | 4,100 | 2 | Operational | ||||||
Tes... | 4,000 | 2 | Operational | ||||||
Tes... | 2,200 | 1 | Operational | ||||||
Tes... | 6,150 | 3 | Operational | ||||||
Tes... | 9,000 | 3 | Operational | ||||||
TGV... | 16,100 | 7 | Operational | ||||||
TGV... | 3 | Operational | |||||||
The... | 330 | 1 | Operational | ||||||
Tho... | 30,450 | 6 | Operational | ||||||
Tho... | 184,500 | 30 | Operational | ||||||
Tho... | 110,700 | 18 | Operational | ||||||
Tin... | 6,900 | 2 | Operational | ||||||
Tin... | 10,350 | 3 | Operational | ||||||
Ton... | 7,200 | 2 | Under construction | ||||||
Ton... | 18,000 | 4 | Operational | ||||||
Tou... | 18,000 | 5 | Operational | ||||||
Tou... | 16,000 | 8 | Operational | ||||||
Tur... | 4,400 | 2 | Operational | ||||||
Tur... | 2,300 | 1 | Operational | ||||||
Tur... | 2,300 | 1 | Operational | ||||||
Tur... | 2,300 | 1 | Operational | ||||||
Tur... | 2,300 | 1 | Operational | ||||||
Tur... | 2,300 | 1 | Operational | ||||||
Tur... | 3,600 | 1 | Operational | ||||||
Vau... | 12,000 | 6 | Operational | ||||||
Ven... | 13,600 | 4 | Operational | ||||||
Ver... | 10,000 | 5 | Operational | ||||||
Vil... | 9,000 | 6 | Operational | ||||||
Vil... | 3,000 | 2 | Operational | ||||||
Vil... | 44,850 | 13 | Operational | ||||||
Vyn... | 100 | 1 | Operational | ||||||
Wac... | 5,000 | 2 | Operational | ||||||
Wai... | 11,500 | 5 | Operational | ||||||
War... | 10,000 | 5 | Operational | ||||||
Wes... | 4,100 | 2 | Operational | ||||||
Wes... | 4,000 | 2 | Operational | ||||||
Wes... | 10,000 | Operational | |||||||
Wie... | 6,900 | 3 | Operational | ||||||
Wie... | 2,350 | 1 | Operational | ||||||
Wil... | 3,400 | 1 | Operational | ||||||
Win... | 4,000 | 2 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Won... | 23,625 | 9 | Operational | ||||||
Won... | 10,000 | Operational | |||||||
Wuu... | 8,000 | 4 | Operational | ||||||
Wuu... | 6,900 | 3 | Operational | ||||||
Wuu... | 7,000 | 2 | Operational | ||||||
Wuu... | 6,000 | 3 | Operational | ||||||
Yvo... | 8,000 | 4 | Operational | ||||||
Yvo... | 4,000 | 2 | Operational | ||||||
Zed... | 1,800 | 1 | Operational | ||||||
Zee... | 18,000 | Operational | |||||||
Zee... | 4,100 | 2 | Operational | ||||||
Zee... | 3,600 | 1 | Operational | ||||||
Zee... | 3,600 | 1 | Operational | ||||||
Zee... | 3,500 | 1 | Operational | ||||||
Zee... | 3,500 | 1 | Operational | ||||||
Zee... | 1,200 | 2 | Dismantled | ||||||
Zee... | 4,800 | 12 | Dismantled | ||||||
Zee... | 2,000 | 10 | Dismantled | ||||||
Zee... | 8,500 | 10 | Operational | ||||||
Zee... | 3,450 | 1 | Operational | ||||||
Zel... | 4,600 | 2 | Operational | ||||||
Zel... | 4,000 | 2 | Operational | ||||||
Zel... | 4,800 | 2 | Operational | ||||||
Zel... | 6,900 | 3 | Operational | ||||||
Zel... | 3,400 | 1 | Operational | ||||||
Zel... | 17,000 | Operational | |||||||
Zwe... | 6,150 | 3 | Operational | ||||||
|
Name Area |
Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
/ | ||||||
Aische-en-Refail |
2,999 | 1 | Operational | |||
Albertdok Oost |
10,500 | 3 | Operational | |||
Albertdok Oost |
2,350 | 1 | Operational | |||
Amel |
10,000 | 5 | Operational | |||
Antwerpen |
6,400 | 2 | Operational | |||
Antwerpen |
3,200 | 1 | Operational | |||
Antwerpen |
3,200 | 1 | Operational | |||
Antwerpen BASF |
10,000 | 5 | Operational | |||
Antwerpen Haven |
4,000 | 2 | Operational | |||
Antwerpen Haven |
3,000 | 1 | Dismantled | |||
Antwerpen Haven |
8,000 | 4 | Operational | |||
Antwerpen Haven |
3,400 | 1 | Operational | |||
Antwerpen Haven |
7,050 | 3 | Operational | |||
Antwerpen Haven |
4,700 | 2 | Operational | |||
Antwerpen Haven |
9,000 | 3 | Operational | |||
Antwerpen Haven |
6,000 | 2 | Operational | |||
Antwerpen Haven |
15,000 | 5 | Operational | |||
Antwerpen Haven |
24,000 | 8 | Operational | |||
Antwerpen Haven |