General data | Wind farms |
By zones | Map | Media | IREC Index |
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
25 Mile Creek | 250,000 | 60 | Operational | ||||||
3-D Metals | 100 | 1 | Operational | ||||||
6th Space Warning Squadron | 3,360 | 2 | Operational | ||||||
AB Tehachapi | 6,970 | 31 | Operational | ||||||
Adair | Dismantled | ||||||||
Adair | 174,800 | 76 | Operational | ||||||
Adams (Iowa) | 144,900 | 60 | Operational | ||||||
Adams (Iowa) | 9,384 | 4 | Operational | ||||||
Adams (Minnesota) | 14,000 | Operational | |||||||
Adams Community Wind | 20,040 | 12 | Operational | ||||||
Aeroman repower (2003) | 3,000 | 2 | Operational | ||||||
AeroTurbine | 4,680 | 39 | Operational | ||||||
AFCEE MMR Turbines | 3,000 | 2 | Operational | ||||||
Agassiz Beach | 1,980 | 3 | Operational | ||||||
Agriwind | 8,400 | 4 | Operational | ||||||
Aikido Demonstration | 2,000 | 1 | Planned | ||||||
Ainsworth | 59,400 | 36 | Operational | ||||||
Air Force | 2,000 | 1 | Operational | ||||||
Air Force Center for Engineering & the Environment | 1,500 | 1 | Operational | ||||||
Akron-Westfield School District | 600 | 1 | Operational | ||||||
Alaska Village Cooperative | 300 | 3 | Operational | ||||||
Alexander | 48,300 | 21 | Operational | ||||||
Alite | 24,000 | 8 | Operational | ||||||
Alle-Catt Wind Energy | 340,000 | 117 | Under construction | ||||||
Allegheny Ridge wind farm | 80,000 | 40 | Operational | ||||||
Allendorf | 1,200 | Operational | |||||||
Alta Farms | 200,000 | Operational | |||||||
Alta I | 150,000 | 100 | Operational | ||||||
Alta II (Vestas) | 150,000 | 50 | Operational | ||||||
Alta III | 150,000 | 50 | Operational | ||||||
Alta IV | 102,000 | 34 | Operational | ||||||
Alta IX | 132,000 | 44 | Operational | ||||||
Alta Mesa I | 18,720 | 117 | Dismantled | ||||||
Alta Mesa I | 39,000 | Under construction | |||||||
Alta Mesa II | 9,450 | 42 | Operational | ||||||
Alta V | 168,000 | 56 | Operational | ||||||
Alta VI | 150,000 | 50 | Operational | ||||||
Alta VII | 168,000 | 56 | Operational | ||||||
Alta VIII | 21,000 | 7 | Operational | ||||||
Alta VIII | 129,000 | 43 | Operational | ||||||
Altamont Pass | 11,000 | Dismantled | |||||||
Altech 3 (b) | 21,710 | 201 | Dismantled | ||||||
Amadeus | 214,320 | 76 | Operational | ||||||
Amadeus | 35,800 | 20 | Operational | ||||||
Amazon Wind Farm | 149,500 | 65 | Operational | ||||||
Amazon Wind Farm Texas | 253,000 | 110 | Operational | ||||||
Amazon Wind Farm US East | 208,000 | 104 | Operational | ||||||
American Windmill Museum | 660 | 1 | Operational | ||||||
AMP-Ohio-Green Mountain Energy Wind Farm | 1,800 | 1 | Operational | ||||||
AMP-Ohio-Green Mountain Energy Wind Farm | 1,800 | 1 | Operational | ||||||
Ana... | 99,000 | 55 | Operational | ||||||
And... | 9,000 | 5 | Operational | ||||||
And... | 6,000 | 3 | Operational | ||||||
Anh... | 1,850 | 1 | Operational | ||||||
Anh... | 1,500 | 1 | Operational | ||||||
Ant... | 28,800 | 9 | Operational | ||||||
Apo... | 300 | 3 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
App... | 100 | 1 | Operational | ||||||
App... | 174,840 | 62 | Operational | ||||||
App... | 100,050 | 29 | Operational | ||||||
App... | 2,500 | 1 | Operational | ||||||
Ara... | 90,000 | 90 | Dismantled | ||||||
Ara... | 90,000 | Operational | |||||||
Ara... | 145,000 | 53 | Operational | ||||||
Arb... | 250,000 | 125 | Operational | ||||||
Arb... | 8,000 | 4 | Operational | ||||||
Arb... | 50,400 | 12 | Operational | ||||||
Arb... | 100,000 | 50 | Operational | ||||||
Arc... | 750 | 1 | Operational | ||||||
Are... | 100 | 1 | Operational | ||||||
Ark... | 70,400 | 32 | Operational | ||||||
Ark... | 8,000 | 4 | Operational | ||||||
Arm... | 105,800 | 46 | Operational | ||||||
Arm... | 103,820 | 58 | Operational | ||||||
Arm... | 8,575 | 5 | Operational | ||||||
Arm... | 100,500 | 67 | Operational | ||||||
Arn... | 1,650 | 1 | Operational | ||||||
Ash... | 48,000 | 32 | Operational | ||||||
Ash... | 148,500 | 99 | Dismantled | ||||||
Ash... | 148,500 | 99 | Operational | ||||||
Ash... | 67,500 | 45 | Operational | ||||||
Ash... | 52,500 | 35 | Operational | ||||||
Ash... | 62,400 | 39 | Operational | ||||||
Atl... | 2,509,600 | Planned | |||||||
Atl... | 1,425,000 | Planned | |||||||
Atl... | 1,230,000 | Planned | |||||||
Atl... | 2,000,000 | Planned | |||||||
Att... | 1,710,000 | Planned | |||||||
Att... | 1,342,000 | Planned | |||||||
Aug... | 1,790 | 1 | Operational | ||||||
Aur... | 20,700 | 9 | Operational | ||||||
Aur... | 30,000 | 15 | Operational | ||||||
Aur... | 268,800 | 56 | Operational | ||||||
Aut... | 1,900 | Operational | |||||||
Auw... | 24,000 | 8 | Operational | ||||||
Avi... | 369,920 | 136 | Operational | ||||||
Avi... | 155,100 | 55 | Operational | ||||||
AVT... | 100 | 1 | Operational | ||||||
Azu... | 312,000 | 65 | Operational | ||||||
Azu... | 14,000 | 7 | Operational | ||||||
Azu... | 24,150 | 7 | Operational | ||||||
Bab... | 161,000 | Under construction | |||||||
Baf... | 202,000 | 101 | Operational | ||||||
Bal... | 102,400 | 654 | Dismantled | ||||||
Bal... | 102,400 | 64 | Operational | ||||||
Bal... | 1,650 | 1 | Operational | ||||||
Bal... | 299,700 | 162 | Operational | ||||||
Bal... | 108,000 | Operational | |||||||
Bar... | 200 | 2 | Operational | ||||||
Bar... | 121,800 | 32 | Operational | ||||||
Bar... | 250 | 1 | Dismantled | ||||||
Bar... | 160,000 | 80 | Operational | ||||||
Bar... | 120,000 | 60 | Operational | ||||||
Bay... | 1,500 | 1 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Bea... | 1,230,000 | Planned | |||||||
Bea... | 1,170,000 | Planned | |||||||
Bea... | 24,000 | 12 | Operational | ||||||
Bea... | 196,650 | 57 | Operational | ||||||
Bea... | 162,150 | 47 | Operational | ||||||
Bea... | 170,000 | 85 | Operational | ||||||
Bea... | 50,000 | Under construction | |||||||
Bea... | 60,000 | Under construction | |||||||
Bea... | 60,000 | Under construction | |||||||
Bea... | 50,000 | Under construction | |||||||
Bea... | 170,000 | 85 | Operational | ||||||
Bea... | 4,500 | 3 | Operational | ||||||
Bee... | 81,600 | 34 | Operational | ||||||
Bee... | 50,400 | 21 | Operational | ||||||
Bee... | 100,500 | 67 | Operational | ||||||
Bee... | 5,440 | 2 | Operational | ||||||
Bee... | 50,760 | 18 | Operational | ||||||
Bee... | 79,550 | 43 | Operational | ||||||
Bel... | 100 | 1 | Operational | ||||||
Ben... | 21,000 | 10 | Operational | ||||||
Ben... | 96,060 | 33 | Operational | ||||||
Ben... | 10,000 | 5 | Operational | ||||||
Ben... | 201,300 | 122 | Operational | ||||||
Ber... | 15,000 | 10 | Operational | ||||||
Ber... | 900 | 1 | Operational | ||||||
Ber... | 4,600 | 2 | Operational | ||||||
Bet... | 900 | 1 | Operational | ||||||
Bet... | 276,000 | 120 | Operational | ||||||
Big... | 36,000 | 18 | Operational | ||||||
Big... | 199,500 | 133 | Operational | ||||||
Big... | 50,000 | 25 | Operational | ||||||
Big... | 21,600 | 6 | Operational | ||||||
Big... | 68,400 | 19 | Operational | ||||||
Big... | 239,400 | 114 | Dismantled | ||||||
Big... | 228,800 | 104 | Operational | ||||||
Big... | 10,000 | 5 | Operational | ||||||
Big... | 132,000 | 66 | Operational | ||||||
Big... | 27,720 | 42 | Operational | ||||||
Big... | 7,000 | 4 | Dismantled | ||||||
Big... | 7,000 | 4 | Dismantled | ||||||
Big... | 25,060 | 14 | Operational | ||||||
Big... | 20,000 | 10 | Operational | ||||||
Big... | 29,400 | 14 | Operational | ||||||
Big... | 110 | 1 | Operational | ||||||
Big... | 125,400 | 76 | Operational | ||||||
Big... | 149,500 | 65 | Operational | ||||||
Big... | 174,800 | 76 | Operational | ||||||
Bin... | 15,000 | 12 | Operational | ||||||
Bin... | 184,800 | 56 | Operational | ||||||
Bir... | 1,790 | 1 | Operational | ||||||
Bis... | 156,800 | 98 | Operational | ||||||
Bis... | 52,500 | 35 | Operational | ||||||
Bis... | 81,000 | 50 | Operational | ||||||
Bis... | 132,500 | 53 | Operational | ||||||
Bis... | 36,800 | 16 | Operational | ||||||
Bis... | 204,800 | 64 | Operational | ||||||
Bis... | 105,000 | 35 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Bis... | 24,000 | 8 | Operational | ||||||
Bis... | 21,000 | 7 | Operational | ||||||
Bis... | 51,000 | 17 | Operational | ||||||
Bis... | 54,000 | 18 | Operational | ||||||
Bit... | 146,640 | 52 | Operational | ||||||
Bit... | 100 | 1 | Operational | ||||||
Bla... | 11,900 | 7 | Operational | ||||||
Bla... | 78,000 | 39 | Operational | ||||||
Bla... | 115,000 | 23 | Operational | ||||||
Bla... | 100 | 1 | Operational | ||||||
Bla... | 240,000 | 50 | Operational | ||||||
Bla... | 59,800 | 26 | Operational | ||||||
Bla... | 198,000 | 90 | Operational | ||||||
Bla... | 38,000 | 19 | Operational | ||||||
Bla... | 162,000 | 81 | Operational | ||||||
Blo... | 30,000 | 5 | Operational | ||||||
Blo... | 178,200 | 54 | Operational | ||||||
Blo... | 18,400 | 8 | Operational | ||||||
Blo... | 242,520 | 86 | Operational | ||||||
Blu... | 2,500 | 2 | Operational | ||||||
Blu... | 74,250 | 45 | Operational | ||||||
Blu... | 133,200 | 74 | Dismantled | ||||||
Blu... | 18,000 | 10 | Operational | ||||||
Blu... | 148,000 | 74 | Operational | ||||||
Blu... | 64,500 | 43 | Operational | ||||||
Blu... | 34,500 | 23 | Operational | ||||||
Blu... | 99,000 | 55 | Operational | ||||||
Blu... | 148,350 | 43 | Operational | ||||||
Blu... | 304,000 | 152 | Operational | ||||||
Blu... | 145,200 | 88 | Operational | ||||||
Blu... | 43,200 | 27 | Operational | ||||||
Blu... | 83,200 | 52 | Operational | ||||||
Blu... | 9,000 | 6 | Operational | ||||||
Blu... | 60,000 | 24 | Operational | ||||||
Blu... | 6,860 | 4 | Operational | ||||||
Blu... | 13,720 | 8 | Operational | ||||||
Blu... | 186,480 | 74 | Operational | ||||||
Blu... | 56,700 | 27 | Operational | ||||||
Blu... | 1,700,000 | Planned | |||||||
Blu... | 198,000 | 60 | Operational | ||||||
Blu... | 112,000 | Operational | |||||||
Blu... | 119,700 | 57 | Operational | ||||||
Bob... | 150,000 | 100 | Dismantled | ||||||
Bob... | 162,000 | 100 | Operational | ||||||
Boi... | 92,000 | 40 | Operational | ||||||
Boi... | 56,400 | 20 | Operational | ||||||
Bol... | 100 | 1 | Operational | ||||||
Bor... | 150,000 | 75 | Operational | ||||||
Bor... | 9,200 | 4 | Operational | ||||||
Bor... | 90,000 | 30 | Operational | ||||||
Bos... | 329,800 | Operational | |||||||
Bou... | 3,000 | 1 | Dismantled | ||||||
Bou... | 1,500 | 1 | Operational | ||||||
Bou... | 2,300 | 1 | Dismantled | ||||||
Bou... | 2,000 | 1 | Dismantled | ||||||
Bou... | 600 | 1 | Operational | ||||||
Bou... | 100 | 1 | Dismantled | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Bou... | 2,300 | 1 | Operational | ||||||
Bou... | 2,000 | 1 | Operational | ||||||
Bou... | 3,000 | 1 | Operational | ||||||
Bou... | 3,000 | 1 | Dismantled | ||||||
Bou... | 3,000 | 1 | Operational | ||||||
Boy... | 100 | 1 | Operational | ||||||
Bra... | 136,500 | 65 | Operational | ||||||
Bra... | 12,530 | 7 | Operational | ||||||
Bra... | 149,730 | 87 | Operational | ||||||
Bra... | 19,800 | 12 | Operational | ||||||
Bra... | 25,000 | 25 | Operational | ||||||
Bra... | 135,000 | 135 | Operational | ||||||
Bre... | 98,600 | 58 | Operational | ||||||
Bre... | 7,500 | 6 | Operational | ||||||
Bre... | 7,500 | 6 | Operational | ||||||
Bri... | 205,200 | 57 | Operational | ||||||
Bri... | 149,850 | 81 | Operational | ||||||
Bro... | 159,100 | 37 | Operational | ||||||
Bro... | 40,700 | 11 | Operational | ||||||
Bro... | 241,500 | 105 | Operational | ||||||
Bro... | 82,800 | 36 | Operational | ||||||
Bro... | 80,000 | 50 | Operational | ||||||
Bro... | 73,100 | 43 | Operational | ||||||
Bro... | 276,360 | 98 | Operational | ||||||
Bro... | 23,000 | 10 | Operational | ||||||
Bro... | 200,000 | 72 | Operational | ||||||
Bro... | 102,000 | 34 | Operational | ||||||
Bro... | 74,800 | 44 | Operational | ||||||
Bro... | 1,500 | 1 | Operational | ||||||
Bru... | 228,000 | 76 | Operational | ||||||
Bru... | 20,700 | 9 | Operational | ||||||
Buc... | 200,480 | 112 | Operational | ||||||
Buc... | 10,350 | 3 | Operational | ||||||
Buc... | 89,700 | 26 | Operational | ||||||
Bue... | 38,000 | 38 | Operational | ||||||
Bue... | 36,920 | 211 | Operational | ||||||
Buf... | 18,900 | 9 | Operational | ||||||
Buf... | 249,750 | 135 | Operational | ||||||
Buf... | 120,600 | 67 | Operational | ||||||
Buf... | 232,500 | 155 | Operational | ||||||
Buf... | 170,200 | 74 | Operational | ||||||
Buf... | 27,000 | 15 | Operational | ||||||
Buf... | 1,980 | 3 | Dismantled | ||||||
Buf... | 26,280 | 73 | Dismantled | ||||||
Buf... | 50,400 | 24 | Operational | ||||||
Buf... | 112,800 | 40 | Operational | ||||||
Buf... | 210,000 | 105 | Operational | ||||||
Bui... | 30,000 | 10 | Operational | ||||||
Bul... | 180,000 | 180 | Operational | ||||||
Bul... | 34,200 | 19 | Operational | ||||||
Bul... | 1,500 | 1 | Operational | ||||||
Bur... | 100 | 1 | Operational | ||||||
Bur... | 660 | 1 | Operational | ||||||
Bur... | 100 | 1 | Operational | ||||||
Bur... | 19,500 | 13 | Operational | ||||||
Bus... | 28,800 | 16 | Operational | ||||||
Bus... | 59,400 | 27 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
But... | 54,000 | 36 | Operational | ||||||
Bye... | 100 | 1 | Operational | ||||||
Cab... | 40,920 | 62 | Operational | ||||||
Cab... | 39,750 | 53 | Operational | ||||||
Cac... | 148,350 | 43 | Operational | ||||||
Cad... | 302,500 | 110 | Operational | ||||||
CAD... | 60,000 | Planned | |||||||
Caj... | 600,000 | Planned | |||||||
Cal... | 217,080 | 134 | Operational | ||||||
Cal... | 1,850 | 1 | Operational | ||||||
Cal... | 114,000 | 76 | Dismantled | ||||||
Cal... | 114,000 | 76 | Operational | ||||||
Cal... | 8,580 | 13 | Operational | ||||||
Cam... | 100 | 1 | Operational | ||||||
Cam... | 1,500 | 1 | Operational | ||||||
Cam... | 165,000 | 55 | Operational | ||||||
Cam... | 60,000 | 80 | Operational | ||||||
Cam... | 150,000 | 100 | Operational | ||||||
Cam... | 22,500 | 15 | Operational | ||||||
Cam... | 130,500 | 87 | Operational | ||||||
Cam... | 88,500 | 59 | Operational | ||||||
Cam... | 31,500 | 21 | Operational | ||||||
Cam... | 660 | 1 | Operational | ||||||
Cam... | 225 | 1 | Operational | ||||||
Cam... | 95,200 | 56 | Operational | ||||||
Cam... | 99,000 | 66 | Operational | ||||||
Can... | 200,100 | 87 | Operational | ||||||
Can... | 148,800 | 62 | Operational | ||||||
Can... | 149,650 | 73 | Operational | ||||||
Can... | 199,800 | 111 | Operational | ||||||
Can... | 291,000 | Under construction | |||||||
Can... | 900 | 1 | Operational | ||||||
Can... | 860 | 8 | Operational | ||||||
Can... | 12,600 | 28 | Operational | ||||||
Can... | 900 | 1 | Operational | ||||||
Can... | 1,600,000 | Planned | |||||||
Can... | 22,800 | 8 | Operational | ||||||
Cap... | 100 | 1 | Operational | ||||||
Cap... | 214,500 | 143 | Operational | ||||||
Cap... | 149,500 | 65 | Dismantled | ||||||
Cap... | 149,500 | 65 | Operational | ||||||
Cap... | 142,500 | 95 | Dismantled | ||||||
Cap... | 156,000 | 104 | Dismantled | ||||||
Cap... | 60,000 | 60 | Operational | ||||||
Cap... | 20,000 | 20 | Operational | ||||||
Car... | 150,000 | 60 | Operational | ||||||
Car... | 1,650 | 1 | Operational | ||||||
Car... | 1,600 | 1 | Operational | ||||||
Car... | 149,600 | 88 | Operational | ||||||
Car... | 150,000 | 100 | Dismantled | ||||||
Car... | 20,700 | 9 | Operational | ||||||
Car... | 36,000 | 24 | Operational | ||||||
Car... | 123,120 | 76 | Operational | ||||||
Car... | 110 | 1 | Operational | ||||||
Cas... | 47,500 | 19 | Operational | ||||||
Cas... | 3,400 | 2 | Operational | ||||||
Cas... | 2,000,000 | Planned | |||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Cas... | 1,000 | 1 | Operational | ||||||
Cas... | 225 | 1 | Operational | ||||||
Cas... | 100 | 1 | Operational | ||||||
Cas... | 5,000 | 2 | Operational | ||||||
Cas... | 16,500 | 11 | Operational | ||||||
Cas... | 99,225 | 27 | Operational | ||||||
Cas... | 26,250 | 10 | Operational | ||||||
Cas... | 34,500 | 23 | Operational | ||||||
Cas... | 29,400 | 14 | Operational | ||||||
Cas... | 197,000 | Operational | |||||||
CCC... | 1,700 | 1 | Operational | ||||||
CED... | 5,600 | 2 | Operational | ||||||
CED... | 8,400 | 3 | Operational | ||||||
Ced... | 188,700 | 111 | Operational | ||||||
Ced... | 221,000 | 221 | Operational | ||||||
Ced... | 79,500 | 53 | Operational | ||||||
Ced... | 152,000 | Operational | |||||||
Ced... | 94,500 | 63 | Operational | ||||||
Ced... | 150,000 | 60 | Operational | ||||||
Ced... | 19,500 | 13 | Operational | ||||||
Ced... | 250,200 | 139 | Operational | ||||||
Ced... | 67,650 | 41 | Operational | ||||||
Ced... | 183,300 | 65 | Operational | ||||||
Ced... | 16,100 | 7 | Operational | ||||||
Ced... | 186,120 | 66 | Operational | ||||||
Ced... | 16,100 | 7 | Operational | ||||||
Ced... | 124,080 | 44 | Operational | ||||||
Ced... | 9,200 | 4 | Operational | ||||||
Ced... | 150,000 | 100 | Operational | ||||||
Cem... | 3,600 | 2 | Operational | ||||||
Cen... | 60,000 | 40 | Operational | ||||||
Cen... | 60,000 | 40 | Operational | ||||||
Cen... | 99,000 | 33 | Operational | ||||||
Cen... | 150,000 | 100 | Operational | ||||||
Cen... | 35,000 | 35 | Operational | ||||||
Cen... | 12,000 | 8 | Operational | ||||||
Cen... | 3,000 | 2 | Operational | ||||||
Cer... | 41,250 | 55 | Dismantled | ||||||
Cer... | 36,800 | 16 | Operational | ||||||
Cha... | 2,600 | 2 | Operational | ||||||
Cha... | 1,980 | 3 | Operational | ||||||
Cha... | 85,500 | 57 | Dismantled | ||||||
Cha... | 1,980 | 3 | Operational | ||||||
Cha... | 249,075 | 81 | Operational | ||||||
Cha... | 57,000 | 38 | Operational | ||||||
Cha... | 18,000 | 12 | Operational | ||||||
Cha... | 1,500 | 1 | Operational | ||||||
Che... | 34,000 | 17 | Operational | ||||||
Che... | 4,000 | 2 | Operational | ||||||
Che... | 46,000 | 23 | Operational | ||||||
Che... | 400 | 4 | Operational | ||||||
Che... | 238,000 | Operational | |||||||
Che... | 216,000 | 48 | Under construction | ||||||
Che... | 444,400 | 202 | Operational | ||||||
Che... | 52,000 | 26 | Operational | ||||||
Chi... | 169,200 | Under construction | |||||||
Chi... | 235,200 | 140 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Chi... | 64,800 | 27 | Operational | ||||||
Cho... | 750,000 | Under construction | |||||||
Cho... | 750,000 | Under construction | |||||||
Cho... | 500,000 | Under construction | |||||||
Cho... | 500,000 | Under construction | |||||||
Cho... | 500,000 | Under construction | |||||||
Cho... | 8,950 | 5 | Operational | ||||||
Cho... | 6,860 | 4 | Operational | ||||||
Cho... | 1,790 | 1 | Operational | ||||||
Cim... | 200,000 | 100 | Operational | ||||||
Cim... | 200,000 | 100 | Operational | ||||||
Cim... | 174,840 | 62 | Operational | ||||||
Cim... | 24,000 | 12 | Operational | ||||||
Cim... | 165,600 | 72 | Operational | ||||||
Cim... | 131,100 | 57 | Operational | ||||||
Cir... | 61,200 | 17 | Operational | ||||||
Cis... | 8,400 | 4 | Operational | ||||||
Cit... | 100 | 1 | Operational | ||||||
Cit... | 1,700 | 1 | Operational | ||||||
Cit... | 1,850 | 1 | Operational | ||||||
Cla... | 900 | 1 | Operational | ||||||
Cla... | 100 | 1 | Operational | ||||||
Cla... | 900 | 1 | Operational | ||||||
Cle... | 750,000 | 131 | Operational | ||||||
Cle... | 14,100 | 5 | Operational | ||||||
Cli... | 324,800 | 116 | Operational | ||||||
Clo... | 100 | 1 | Operational | ||||||
Clo... | 100 | 1 | Operational | ||||||
Clo... | 300 | 3 | Operational | ||||||
Clo... | 660 | 1 | Operational | ||||||
Coa... | 46,800 | 13 | Operational | ||||||
Coa... | 13,800 | 4 | Operational | ||||||
Coa... | 1,500 | 1 | Operational | ||||||
Coa... | 4,500 | 3 | Operational | ||||||
Coh... | 57,500 | 23 | Operational | ||||||
Coh... | 67,500 | 27 | Operational | ||||||
Coh... | 67,500 | 27 | Dismantled | ||||||
Col... | 5,700 | 2 | Operational | ||||||
Col... | 150,000 | 100 | Dismantled | ||||||
Col... | 144,000 | 90 | Operational | ||||||
Col... | 12,000 | 8 | Operational | ||||||
Col... | 67,200 | 42 | Operational | ||||||
Col... | 23,800 | 14 | Operational | ||||||
Com... | 41,000 | 41 | Operational | ||||||
Com... | 63,000 | 63 | Operational | ||||||
Com... | 1,200,000 | Planned | |||||||
Com... | 2,610,000 | Planned | |||||||
Com... | 1,314,000 | Planned | |||||||
Com... | 30,000 | 12 | Dismantled | ||||||
Com... | 24,000 | 12 | Operational | ||||||
Com... | 30,750 | 15 | Operational | ||||||
Con... | 50,400 | 24 | Operational | ||||||
Con... | 24,600 | 41 | Operational | ||||||
Con... | 25,200 | 42 | Operational | ||||||
Con... | 600 | 1 | Dismantled | ||||||
Con... | 600 | 1 | Operational | ||||||
Con... | 400 | 1 | Dismantled | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Con... | 11,500 | 5 | Operational | ||||||
Con... | 84,600 | 30 | Operational | ||||||
Con... | 16,320 | 6 | Operational | ||||||
Coo... | 4,500 | 3 | Operational | ||||||
Cop... | 80,000 | 40 | Operational | ||||||
Cor... | 10,500 | 7 | Operational | ||||||
Cor... | 4,500 | 3 | Operational | ||||||
Cor... | 4,200 | 2 | Operational | ||||||
Cor... | 1,700 | 1 | Operational | ||||||
Cor... | 59,220 | 21 | Operational | ||||||
Cot... | 50,400 | 21 | Operational | ||||||
Cot... | 5,145 | 3 | Operational | ||||||
Cot... | 85,100 | 37 | Operational | ||||||
Cou... | 200,000 | 100 | Operational | ||||||
Cow... | 50,400 | 24 | Operational | ||||||
Coy... | 6,900 | 3 | Operational | ||||||
Coy... | 87,500 | 35 | Operational | ||||||
Coy... | 216,000 | 42 | Operational | ||||||
Coy... | 26,565 | 11 | Operational | ||||||
CR ... | 100 | 1 | Operational | ||||||
Cra... | 99,000 | 66 | Operational | ||||||
Cra... | 220,000 | 100 | Operational | ||||||
Cre... | 54,450 | 33 | Dismantled | ||||||
Cre... | 61,600 | 28 | Operational | ||||||
Cre... | 13,800 | 6 | Operational | ||||||
Cre... | 146,800 | 54 | Operational | ||||||
Cre... | 6,800 | 4 | Operational | ||||||
Cre... | 6,900 | 3 | Operational | ||||||
Cri... | 750 | 1 | Operational | ||||||
Cri... | 70,000 | 28 | Dismantled | ||||||
Cri... | Under construction | ||||||||
Cro... | 209,440 | 77 | Operational | ||||||
Cro... | 36,000 | 20 | Operational | ||||||
Cro... | 6,000 | 2 | Operational | ||||||
Cro... | 105,400 | 62 | Operational | ||||||
Cro... | 43,700 | 19 | Operational | ||||||
Cro... | 75,900 | 33 | Operational | ||||||
Cro... | 86,000 | 20 | Operational | ||||||
Cro... | 18,000 | 5 | Operational | ||||||
Cro... | 195,500 | 85 | Operational | ||||||
Cro... | 9,000 | 3 | Operational | ||||||
Cro... | 23,000 | 10 | Operational | ||||||
Cro... | 21,000 | 10 | Operational | ||||||
Cro... | 160,500 | 107 | Operational | ||||||
Cro... | 1,500 | 1 | Operational | ||||||
Cro... | 200,100 | 87 | Operational | ||||||
Cro... | 181,700 | 79 | Operational | ||||||
Cro... | 18,900 | 9 | Operational | ||||||
Cry... | 162,000 | Operational | |||||||
Cry... | 190,000 | 76 | Dismantled | ||||||
Cry... | 10,000 | 4 | Operational | ||||||
Cry... | 190,000 | 76 | Operational | ||||||
Cry... | 150,000 | 100 | Dismantled | ||||||
Cry... | 66,000 | 44 | Operational | ||||||
Cum... | 1,600 | 1 | Operational | ||||||
Cuy... | 500 | 1 | Operational | ||||||
CVO... | 2,600,000 | Planned | |||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Dak... | 2,200 | 1 | Operational | ||||||
Dak... | 153,600 | 32 | Operational | ||||||
Dak... | 275,200 | 64 | Operational | ||||||
Dak... | 26,600 | 7 | Operational | ||||||
Dan... | 20,040 | 12 | Operational | ||||||
Dan... | 55,000 | Under construction | |||||||
Day... | 99,000 | 66 | Dismantled | ||||||
Day... | 105,600 | 66 | Operational | ||||||
Day... | 106,000 | Operational | |||||||
Dee... | 150,000 | 72 | Operational | ||||||
Dee... | 112,000 | Operational | |||||||
Dee... | Dismantled | ||||||||
Dee... | 30,000 | 15 | Operational | ||||||
Del... | 28,500 | 38 | Dismantled | ||||||
Del... | 185,000 | Under construction | |||||||
Del... | 100 | 1 | Operational | ||||||
Del... | 900 | 1 | Operational | ||||||
Del... | 900 | 1 | Operational | ||||||
Dep... | 3,300 | 2 | Operational | ||||||
Des... | 160,500 | 107 | Dismantled | ||||||
Des... | 5,100 | 3 | Operational | ||||||
Des... | 29,600 | 16 | Operational | ||||||
Des... | 108,000 | 72 | Operational | ||||||
Deu... | 307,380 | 109 | Operational | ||||||
DeW... | 2,000 | 1 | Operational | ||||||
DH ... | 100 | 1 | Operational | ||||||
Dia... | 20,460 | 31 | Operational | ||||||
Dia... | 273,540 | 97 | Operational | ||||||
Dia... | 23,000 | 10 | Operational | ||||||
Dia... | 14,100 | 5 | Operational | ||||||
Dia... | 137,600 | 32 | Operational | ||||||
Dia... | 11,000 | 5 | Operational | ||||||
Dia... | 16,000 | 8 | Operational | ||||||
Dia... | 4,200 | 1 | Operational | ||||||
Dia... | 13,200 | 6 | Operational | ||||||
Dia... | 70,500 | 25 | Operational | ||||||
Dia... | 299,250 | 95 | Operational | ||||||
Dia... | 10,500 | 7 | Operational | ||||||
Dia... | 1,500 | 1 | Operational | ||||||
Dia... | 18,000 | 12 | Operational | ||||||
Dif... | 7,344 | 56 | Operational | ||||||
Dif... | 3,024 | 16 | Operational | ||||||
Dif... | 8,360 | 76 | Operational | ||||||
Dif... | 14,550 | 97 | Operational | ||||||
Dif... | 3,000 | 25 | Operational | ||||||
Dif... | 11,772 | 81 | Dismantled | ||||||
Dif... | 27,000 | 199 | Operational | ||||||
Dif... | 22,680 | 189 | Dismantled | ||||||
Dif... | 15,000 | 100 | Dismantled | ||||||
Dil... | 45,000 | 45 | Operational | ||||||
Din... | 16,905 | 161 | Operational | ||||||
Doe... | 250 | 1 | Operational | ||||||
Dol... | 5,640 | 2 | Operational | ||||||
Don... | 950 | 1 | Operational | ||||||
DOW... | 100,000 | Planned | |||||||
Dow... | 126,000 | 30 | Under construction | ||||||
Dri... | 108,000 | 54 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Dry... | 63,000 | 30 | Operational | ||||||
Dry... | 65,100 | 31 | Operational | ||||||
Dun... | 275 | 1 | Operational | ||||||
Dun... | 111,000 | 74 | Dismantled | ||||||
Dun... | 136,900 | 74 | Operational | ||||||
Dur... | 106,400 | 38 | Operational | ||||||
Dur... | 10,000 | 5 | Operational | ||||||
Dut... | 68,000 | Operational | |||||||
Dut... | 10,000 | 20 | Dismantled | ||||||
Dye... | 6,000 | 3 | Operational | ||||||
Dyn... | 100 | 1 | Operational | ||||||
Eas... | 195,840 | 72 | Operational | ||||||
Eas... | 198,000 | 90 | Operational | ||||||
Eas... | 2,000 | 1 | Operational | ||||||
Eas... | 3,750 | 3 | Operational | ||||||
Eas... | 6,250 | 5 | Operational | ||||||
Eas... | 4,165 | 7 | Operational | ||||||
Ech... | 29,700 | 18 | Operational | ||||||
Ech... | 14,850 | 9 | Operational | ||||||
Ech... | 20,500 | 10 | Operational | ||||||
Ech... | 112,000 | 70 | Operational | ||||||
Ecl... | 200,100 | 87 | Operational | ||||||
Eco... | 100,500 | 67 | Operational | ||||||
Ede... | 275 | 1 | Operational | ||||||
Edo... | 11,000 | Dismantled | |||||||
Edo... | 20,000 | 8 | Operational | ||||||
Eig... | 111,800 | 25 | Operational | ||||||
Eko... | 23,000 | 10 | Operational | ||||||
Eko... | 227,900 | 53 | Operational | ||||||
El ... | 171,600 | 78 | Operational | ||||||
El ... | 28,600 | 13 | Operational | ||||||
El ... | 298,200 | 142 | Operational | ||||||
El ... | 34,000 | 17 | Operational | ||||||
El ... | 7,200 | 2 | Operational | ||||||
El ... | 201,600 | 48 | Operational | ||||||
El ... | 1,000 | 1 | Operational | ||||||
El ... | 301,500 | 67 | Operational | ||||||
Elb... | 121,900 | 53 | Dismantled | ||||||
Elb... | 121,900 | 53 | Operational | ||||||
Eld... | 750 | 1 | Operational | ||||||
Ele... | 230,000 | 100 | Operational | ||||||
Elk... | 42,500 | 17 | Operational | ||||||
Elk... | 98,900 | 43 | Operational | ||||||
Elk... | 72,000 | 48 | Dismantled | ||||||
Elk... | 27,000 | 18 | Dismantled | ||||||
Elk... | 29,160 | 18 | Operational | ||||||
Elk... | 72,000 | 48 | Operational | ||||||
Elk... | 150,000 | 100 | Operational | ||||||
Elk... | 81,000 | 27 | Operational | ||||||
Elk... | 3,300 | 2 | Operational | ||||||
Elk... | 97,350 | 59 | Operational | ||||||
Elm... | 99,000 | 66 | Operational | ||||||
Elm... | 148,800 | 62 | Operational | ||||||
Emm... | 400 | 4 | Operational | ||||||
Emm... | 104,920 | 61 | Operational | ||||||
Emm... | 111,520 | 41 | Operational | ||||||
Emp... | 816,000 | 80 | Approved | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Emp... | 1,260,000 | Planned | |||||||
End... | 25,000 | 10 | Dismantled | ||||||
End... | 12,500 | 5 | Dismantled | ||||||
End... | 62,500 | 25 | Dismantled | ||||||
End... | 11,500 | 5 | Operational | ||||||
End... | 87,500 | 35 | Operational | ||||||
End... | 50,000 | 20 | Dismantled | ||||||
End... | 45,000 | 18 | Operational | ||||||
End... | 4,600 | 2 | Operational | ||||||
Ene... | 10,000 | 10 | Operational | ||||||
Eng... | 145,000 | 58 | Operational | ||||||
Eng... | 25,300 | 11 | Operational | ||||||
Ens... | 98,900 | 43 | Operational | ||||||
Eol... | 2,500 | 1 | Operational | ||||||
Equ... | 4,000 | 2 | Operational | ||||||
Eri... | 1,200 | 1 | Operational | ||||||
Eri... | 900 | 1 | Operational | ||||||
Esc... | 252,000 | 45 | Operational | ||||||
Esc... | 84,000 | 20 | Operational | ||||||
Esw... | 225 | 1 | Operational | ||||||
Eui... | 26,000 | Dismantled | |||||||
Eva... | 24,600 | 12 | Operational | ||||||
Eva... | 100 | 1 | Operational | ||||||
Eve... | 2,500 | 1 | Operational | ||||||
Eve... | 2,000,000 | Planned | |||||||
Ewi... | 21,000 | 10 | Operational | ||||||
Exc... | 1,314,000 | Planned | |||||||
F.E... | 1,320 | 2 | Operational | ||||||
Fai... | 30,000 | 12 | Operational | ||||||
Fai... | 6,000 | 3 | Dismantled | ||||||
Fai... | 72,450 | 21 | Operational | ||||||
Fai... | 10,080 | 6 | Operational | ||||||
Fai... | 3,000 | 2 | Operational | ||||||
Fal... | 1,650 | 1 | Operational | ||||||
Fal... | 3,300 | 2 | Dismantled | ||||||
Fal... | 163,200 | 68 | Operational | ||||||
Far... | 146,000 | 73 | Operational | ||||||
Far... | 5,700 | 6 | Operational | ||||||
Fed... | 2,100 | 1 | Operational | ||||||
Fen... | 30,000 | 20 | Operational | ||||||
Fen... | 1,500 | 1 | Operational | ||||||
Fen... | 205,500 | 137 | Operational | ||||||
FHS... | 4,000 | 2 | Operational | ||||||
Fie... | 4,500 | 3 | Operational | ||||||
Fin... | 3,000 | 2 | Operational | ||||||
Fir... | 17,600 | 11 | Operational | ||||||
Fir... | 301,740 | 107 | Operational | ||||||
Fir... | 360,960 | 128 | Operational | ||||||
Fir... | 211,500 | 75 | Operational | ||||||
Fla... | 50,000 | 20 | Dismantled | ||||||
Fla... | 40,000 | 20 | Dismantled | ||||||
Fla... | 38,000 | 19 | Operational | ||||||
Fla... | 470,400 | 294 | Operational | ||||||
Fla... | 88,000 | 44 | Operational | ||||||
Fla... | 39,600 | 18 | Operational | ||||||
Fla... | 200,000 | 100 | Operational | ||||||
Fla... | 60,000 | 40 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Flu... | 155,400 | 74 | Operational | ||||||
Fly... | 43,500 | 29 | Operational | ||||||
Foa... | 350,280 | 139 | Operational | ||||||
Foo... | 66,000 | Operational | |||||||
Foo... | 41,400 | 69 | Operational | ||||||
Foo... | 1,800 | 3 | Dismantled | ||||||
Foo... | 24,750 | 33 | Dismantled | ||||||
Foo... | 16,800 | 28 | Dismantled | ||||||
For... | 600 | 1 | Operational | ||||||
For... | 120,400 | 43 | Operational | ||||||
For... | 600 | 1 | Operational | ||||||
For... | 87,400 | 38 | Operational | ||||||
For... | 36,800 | 16 | Operational | ||||||
For... | 4,000 | 2 | Operational | ||||||
For... | 1,000 | 1 | Dismantled | ||||||
For... | 100 | 1 | Operational | ||||||
For... | 29,400 | 14 | Operational | ||||||
For... | 1,600 | 1 | Operational | ||||||
For... | 1,600 | 1 | Operational | ||||||
For... | 99,000 | 66 | Operational | ||||||
For... | 30,000 | 20 | Operational | ||||||
Fos... | 10,500 | 7 | Operational | ||||||
Fou... | 40,000 | 16 | Operational | ||||||
Fow... | 100,000 | 40 | Operational | ||||||
Fow... | 300,300 | 182 | Operational | ||||||
Fow... | 199,500 | 133 | Operational | ||||||
Fox... | 4,500 | 3 | Operational | ||||||
Fox... | 136,000 | 68 | Operational | ||||||
Fox... | 14,000 | 7 | Operational | ||||||
Fra... | 99,000 | 60 | Operational | ||||||
Fre... | 138,000 | 69 | Operational | ||||||
Fre... | 14,000 | 7 | Operational | ||||||
Fre... | 46,000 | 23 | Operational | ||||||
Fri... | 20,000 | 10 | Operational | ||||||
Fro... | 184,800 | 56 | Operational | ||||||
Fro... | 15,000 | 5 | Operational | ||||||
Fro... | 355,200 | 74 | Operational | ||||||
Fut... | 8,000 | 4 | Operational | ||||||
Gai... | 2,000 | 1 | Operational | ||||||
Gal... | 4,950 | 3 | Operational | ||||||
Gal... | 4,950 | 3 | Operational | ||||||
Gam... | 300 | 3 | Operational | ||||||
Gar... | 680,000 | Planned | |||||||
Gar... | 6,500 | 13 | Operational | ||||||
GE ... | 2,000 | Operational | |||||||
GE ... | 2,000 | Operational | |||||||
Gen... | 3,000 | 2 | Operational | ||||||
Geo... | 10,000 | 4 | Operational | ||||||
GL ... | 5,000 | 2 | Operational | ||||||
Gla... | 162,000 | 90 | Operational | ||||||
Gla... | 106,500 | 71 | Operational | ||||||
Gla... | 103,500 | 69 | Operational | ||||||
Gla... | 184,900 | 43 | Operational | ||||||
Gla... | 34,500 | 15 | Operational | ||||||
Gla... | 81,780 | 29 | Operational | ||||||
Gla... | 95,760 | 38 | Operational | ||||||
Gla... | 116,100 | 27 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Gla... | 2,000 | 1 | Operational | ||||||
Gle... | 97,500 | 39 | Operational | ||||||
Gle... | 9,200 | 4 | Operational | ||||||
Gle... | 99,000 | 66 | Dismantled | ||||||
Gle... | 122,100 | 66 | Operational | ||||||
Gle... | 99,000 | 66 | Dismantled | ||||||
Gle... | 39,000 | 26 | Dismantled | ||||||
Gle... | 48,100 | 26 | Operational | ||||||
Goa... | 80,000 | 80 | Operational | ||||||
Goa... | 69,600 | 29 | Operational | ||||||
Gob... | 900 | 1 | Operational | ||||||
Gol... | 176,300 | 41 | Operational | ||||||
Gol... | 25,000 | 10 | Operational | ||||||
Gol... | 1,850 | 1 | Operational | ||||||
Gol... | 81,600 | 48 | Operational | ||||||
Gol... | 86,700 | 51 | Operational | ||||||
Gol... | 71,300 | 31 | Operational | ||||||
Gol... | 128,520 | 51 | Operational | ||||||
Gol... | 78,200 | 34 | Operational | ||||||
Gol... | 2,000,000 | Planned | |||||||
Gol... | 12,000 | 8 | Operational | ||||||
Gol... | 246,500 | 145 | Operational | ||||||
Gol... | 7,500 | 3 | Operational | ||||||
Gol... | 141,100 | 83 | Operational | ||||||
Goo... | 130,500 | 87 | Operational | ||||||
Goo... | 248,400 | 69 | Under construction | ||||||
Goo... | 252,000 | 70 | Operational | ||||||
Goo... | 70,000 | 35 | Dismantled | ||||||
Goo... | 103,000 | Operational | |||||||
Goo... | 24,000 | 12 | Dismantled | ||||||
Goo... | 56,000 | 28 | Operational | ||||||
Goo... | 144,000 | 72 | Operational | ||||||
Gop... | 158,000 | 79 | Operational | ||||||
Gor... | 9,000 | 6 | Operational | ||||||
Gos... | 124,500 | 83 | Operational | ||||||
Gra... | 220,500 | 84 | Operational | ||||||
Gra... | 100,500 | 67 | Operational | ||||||
Gra... | 99,000 | 66 | Operational | ||||||
Gra... | 51,000 | 34 | Operational | ||||||
Gra... | 30,000 | 20 | Operational | ||||||
Gra... | 30,000 | 20 | Operational | ||||||
Gra... | 400,000 | 200 | Operational | ||||||
Gra... | 105,610 | 59 | Operational | ||||||
Gra... | 105,610 | 59 | Operational | ||||||
Gra... | 200,480 | 112 | Operational | ||||||
Gra... | 99,000 | 33 | Operational | ||||||
Gra... | 21,000 | 10 | Operational | ||||||
Gra... | 147,200 | 64 | Operational | ||||||
Gra... | 151,800 | 66 | Operational | ||||||
Gra... | 128,520 | 51 | Operational | ||||||
Gra... | 16,100 | 7 | Operational | ||||||
Gra... | 110,400 | 69 | Operational | ||||||
Gra... | 102,400 | 64 | Operational | ||||||
Gra... | 112,200 | 170 | Operational | ||||||
Gre... | 225 | 1 | Operational | ||||||
Gre... | 222,400 | Operational | |||||||
Gre... | 210,000 | Operational | |||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Gre... | 299,000 | Operational | |||||||
Gre... | 358,000 | Operational | |||||||
Gre... | 50,760 | 18 | Operational | ||||||
Gre... | 225 | 1 | Operational | ||||||
Gre... | 99,000 | 30 | Operational | ||||||
Gre... | 126,000 | 63 | Operational | ||||||
Gre... | 1,790 | 1 | Operational | ||||||
Gre... | 500 | 1 | Operational | ||||||
Gre... | 5,500 | 11 | Operational | ||||||
Gre... | 10,400 | 8 | Dismantled | ||||||
Gre... | 150,000 | 50 | Operational | ||||||
Gre... | 150,000 | 50 | Operational | ||||||
Gre... | 12,300 | 41 | Operational | ||||||
Gre... | 134,300 | 1,343 | Operational | ||||||
Gre... | 194,250 | 74 | Operational | ||||||
Gre... | 32,500 | 13 | Operational | ||||||
Gre... | 1,600 | 1 | Operational | ||||||
Gre... | 12,500 | 10 | Operational | ||||||
Gre... | 4,500 | 3 | Operational | ||||||
Gri... | 225,600 | 80 | Operational | ||||||
Gro... | 48,000 | 24 | Operational | ||||||
Gru... | 155,100 | 55 | Operational | ||||||
GSA... | 200 | 2 | Operational | ||||||
GSG... | 80,000 | 40 | Dismantled | ||||||
GSG... | 80,000 | 26 | Operational | ||||||
Gul... | 283,200 | 118 | Dismantled | ||||||
Gul... | 271,400 | 118 | Operational | ||||||
Gun... | 119,930 | 67 | Operational | ||||||
Gut... | 100 | 1 | Operational | ||||||
GWE... | 4,000 | 2 | Operational | ||||||
GWE... | 4,000 | 2 | Operational | ||||||
Hac... | 165,600 | 72 | Operational | ||||||
Hal... | 432,000 | 216 | Operational | ||||||
Hal... | 46,000 | 23 | Operational | ||||||
Hal... | 100 | 1 | Operational | ||||||
Han... | 56,100 | 17 | Operational | ||||||
Han... | 97,680 | 148 | Operational | ||||||
Hap... | 29,400 | 14 | Operational | ||||||
Har... | 250 | 1 | Operational | ||||||
Har... | 850 | 1 | Operational | ||||||
Har... | 9,000 | 6 | Operational | ||||||
Har... | 14,700 | 7 | Operational | ||||||
Har... | 74,000 | 37 | Operational | ||||||
Har... | 1,500 | 1 | Operational | ||||||
Har... | 202,000 | Operational | |||||||
Har... | 52,800 | 32 | Operational | ||||||
Har... | 59,400 | 33 | Operational | ||||||
Har... | 98,900 | 43 | Operational | ||||||
Has... | 100 | 1 | Operational | ||||||
Hat... | 101,200 | 44 | Operational | ||||||
Hav... | 4,500 | 3 | Operational | ||||||
Haw... | 10,560 | 16 | Operational | ||||||
Haw... | 36,000 | 15 | Operational | ||||||
Hay... | 100,800 | 48 | Operational | ||||||
Hay... | 43,200 | 18 | Operational | ||||||
Hay... | 225,000 | 45 | Operational | ||||||
Hea... | 200,000 | 100 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Hea... | 151,200 | 36 | Operational | ||||||
Hea... | 46,800 | 13 | Operational | ||||||
Hea... | 169,200 | 60 | Operational | ||||||
Hea... | 2,520 | 1 | Operational | ||||||
Hea... | 8,160 | 3 | Operational | ||||||
Hea... | 1,650 | 1 | Operational | ||||||
Hea... | 6,800 | 4 | Operational | ||||||
Hea... | 80,000 | 32 | Operational | ||||||
Hea... | 199,400 | 72 | Operational | ||||||
Hea... | 201,000 | 72 | Operational | ||||||
Hel... | 268,000 | 66 | Operational | ||||||
Hel... | 6,000 | 8 | Operational | ||||||
Hel... | 16,500 | 22 | Operational | ||||||
Her... | 99,900 | 54 | Operational | ||||||
Her... | 100,000 | 50 | Operational | ||||||
Her... | 100 | 1 | Operational | ||||||
Her... | 28,000 | 14 | Operational | ||||||
Hid... | 50,400 | 14 | Operational | ||||||
Hig... | 643,000 | Under construction | |||||||
Hig... | 100,000 | 40 | Dismantled | ||||||
Hig... | 100,000 | 40 | Operational | ||||||
Hig... | 135,135 | 39 | Operational | ||||||
Hig... | 147,000 | 49 | Operational | ||||||
Hig... | 50,600 | 22 | Operational | ||||||
Hig... | 107,100 | 34 | Operational | ||||||
Hig... | 41,400 | 18 | Operational | ||||||
Hig... | 50,600 | 22 | Operational | ||||||
Hig... | 39,900 | 19 | Operational | ||||||
Hig... | 99,000 | 66 | Dismantled | ||||||
Hig... | 122,100 | 66 | Operational | ||||||
Hig... | 100 | 1 | Operational | ||||||
Hig... | 358,600 | 163 | Operational | ||||||
Hig... | 41,400 | 12 | Operational | ||||||
Hig... | 112,500 | 75 | Operational | ||||||
Hig... | 162,000 | 90 | Operational | ||||||
Hig... | 495,006 | 211 | Operational | ||||||
Hig... | 7,038 | 3 | Operational | ||||||
Hig... | 72,500 | 29 | Operational | ||||||
Hig... | 2,500 | 1 | Operational | ||||||
Hig... | 62,500 | 25 | Operational | ||||||
Hig... | 40,500 | 27 | Operational | ||||||
Hil... | 2,000 | 1 | Operational | ||||||
Hil... | 185,000 | 74 | Operational | ||||||
Hod... | 250 | 1 | Operational | ||||||
Hog... | 66,000 | 30 | Operational | ||||||
Hol... | 4,500 | 3 | Operational | ||||||
Hol... | 5,000 | 2 | Operational | ||||||
Hol... | 600 | 1 | Operational | ||||||
Hom... | 160 | 1 | Operational | ||||||
Hom... | 160 | 1 | Operational | ||||||
Hom... | 160 | 1 | Operational | ||||||
Hom... | 160 | 1 | Operational | ||||||
Hom... | 160 | 1 | Operational | ||||||
Hom... | 160 | 1 | Operational | ||||||
Hom... | 160 | 1 | Operational | ||||||
Hom... | 160 | 1 | Operational | ||||||
Hom... | 160 | 1 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Hom... | 160 | 1 | Operational | ||||||
Hon... | 3,400 | 2 | Operational | ||||||
Hoo... | 300 | 3 | Operational | ||||||
Hoo... | 98,000 | 49 | Operational | ||||||
Hoo... | 31,350 | 19 | Operational | ||||||
Hoo... | 108,650 | 53 | Operational | ||||||
Hop... | 149,400 | 83 | Operational | ||||||
Hop... | 7,200 | 4 | Operational | ||||||
Hor... | 202,000 | 34 | Operational | ||||||
Hor... | 57,600 | 32 | Operational | ||||||
Hor... | 230,000 | 100 | Operational | ||||||
Hor... | 3,000 | 2 | Operational | ||||||
Hor... | 210,000 | 140 | Operational | ||||||
Hor... | 299,000 | 130 | Dismantled | ||||||
Hor... | 299,000 | 130 | Operational | ||||||
Hor... | 223,500 | 149 | Dismantled | ||||||
Hor... | 224,000 | Operational | |||||||
Hor... | 9,000 | 6 | Operational | ||||||
Hot... | 21,000 | 10 | Operational | ||||||
How... | 51,250 | 25 | Operational | ||||||
How... | 4,100 | 2 | Operational | ||||||
How... | 220 | 2 | Operational | ||||||
Hub... | 25,000 | 10 | Operational | ||||||
Hub... | 276,360 | 98 | Operational | ||||||
Hud... | 1,635,000 | Planned | |||||||
Hue... | 1,320 | 2 | Dismantled | ||||||
Hue... | 8,000 | 4 | Operational | ||||||
Hul... | 660 | 1 | Operational | ||||||
Hul... | 1,800 | 1 | Operational | ||||||
Hum... | 1,000,000 | Planned | |||||||
Hur... | 100 | 1 | Operational | ||||||
Hya... | 100 | 1 | Operational | ||||||
IBE... | 100 | 1 | Operational | ||||||
Ice... | 20,700 | 6 | Approved | ||||||
Ida... | 276,000 | 120 | Operational | ||||||
Ida... | 25,060 | 14 | Operational | ||||||
Ida... | 18,400 | 8 | Operational | ||||||
Ida... | 183,960 | 73 | Operational | ||||||
IDW... | 2,250 | 3 | Operational | ||||||
Ill... | 1,650 | 1 | Operational | ||||||
Ind... | 56,400 | 20 | Operational | ||||||
Ind... | 4,600 | 2 | Operational | ||||||
Ind... | 3,000 | 1 | Operational | ||||||
Ind... | 82,500 | 125 | Dismantled | ||||||
Ind... | 82,000 | Operational | |||||||
Ind... | 302,400 | 72 | Operational | ||||||
Ind... | 202,000 | Under construction | |||||||
Ine... | 33,600 | 12 | Operational | ||||||
Ine... | 38,000 | 19 | Operational | ||||||
Ine... | 320,000 | 64 | Operational | ||||||
Inl... | 1,000 | 1 | Operational | ||||||
Int... | 160,500 | 107 | Dismantled | ||||||
Int... | 160,500 | 107 | Operational | ||||||
Int... | 15,000 | 15 | Operational | ||||||
Iow... | 10,500 | 7 | Operational | ||||||
Iow... | 1,650 | 1 | Operational | ||||||
Iow... | 10,500 | 7 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Iow... | 660 | 1 | Operational | ||||||
Ips... | 1,600 | 1 | Operational | ||||||
Ips... | 2,000 | 1 | Operational | ||||||
Iri... | 301,660 | 108 | Operational | ||||||
Iro... | 297,600 | 62 | Operational | ||||||
Iro... | 167,900 | 73 | Operational | ||||||
Isa... | 341,220 | 121 | Operational | ||||||
Isa... | 42,300 | 15 | Operational | ||||||
Ive... | 12,075 | 5 | Operational | ||||||
Ive... | 78,750 | 30 | Operational | ||||||
Jav... | 19,690 | 11 | Operational | ||||||
Jav... | 230,000 | 115 | Operational | ||||||
Jav... | 200,000 | 100 | Operational | ||||||
Jaw... | 80,000 | 38 | Under construction | ||||||
Jay... | 197,400 | 70 | Operational | ||||||
JD ... | 10,000 | 8 | Operational | ||||||
JD ... | 10,000 | 8 | Operational | ||||||
JD ... | 10,000 | 8 | Operational | ||||||
JD ... | 10,000 | 8 | Dismantled | ||||||
JD ... | 10,000 | 8 | Dismantled | ||||||
JD ... | 79,800 | 38 | Operational | ||||||
JD ... | 10,000 | 8 | Operational | ||||||
JD ... | 10,000 | 8 | Operational | ||||||
JD ... | 10,000 | 8 | Operational | ||||||
JD ... | 10,000 | 8 | Operational | ||||||
JD ... | 10,000 | 8 | Operational | ||||||
Jef... | 50,000 | 20 | Dismantled | ||||||
Jef... | 44,000 | 20 | Operational | ||||||
Jer... | 14,250 | 5 | Operational | ||||||
Jer... | 77,700 | 37 | Operational | ||||||
Jer... | 7,500 | 5 | Operational | ||||||
Jet... | 10,000 | 5 | Operational | ||||||
Jim... | 1,500 | 1 | Operational | ||||||
JJN... | 1,500 | 1 | Operational | ||||||
Joh... | 100 | 1 | Operational | ||||||
Jor... | 226,800 | 90 | Operational | ||||||
Jor... | 113,400 | 45 | Operational | ||||||
Jor... | 32,200 | 14 | Operational | ||||||
Jud... | 135,000 | 90 | Operational | ||||||
Jum... | 160,740 | 57 | Operational | ||||||
Jum... | 299,700 | 162 | Operational | ||||||
Jun... | 8,000 | 5 | Operational | ||||||
Jun... | 151,200 | 63 | Operational | ||||||
Kah... | 30,000 | 20 | Operational | ||||||
Kah... | 21,000 | 14 | Operational | ||||||
Kah... | 30,000 | 12 | Operational | ||||||
Kam... | 9,250 | 37 | Dismantled | ||||||
Kan... | 100 | 1 | Operational | ||||||
Kar... | 50,600 | 22 | Operational | ||||||
Kar... | 234,360 | 93 | Operational | ||||||
Kar... | 22,500 | 9 | Operational | ||||||
Kar... | 3,000 | 6 | Operational | ||||||
Kar... | 4,500 | 3 | Operational | ||||||
Kas... | 1,500 | 2 | Operational | ||||||
Kas... | 300 | 3 | Operational | ||||||
Kaw... | 69,000 | 30 | Operational | ||||||
Kay... | 299,000 | 130 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Kee... | 110,000 | 55 | Operational | ||||||
Kee... | 151,800 | 66 | Operational | ||||||
Kel... | 184,000 | 92 | Operational | ||||||
Ken... | 30,300 | 101 | Operational | ||||||
Ken... | 750 | 1 | Operational | ||||||
Keu... | 125 | 1 | Dismantled | ||||||
Kib... | 66,000 | 22 | Operational | ||||||
Kib... | 66,000 | 22 | Operational | ||||||
Kim... | 10,500 | 7 | Dismantled | ||||||
Kim... | 30,000 | 12 | Operational | ||||||
Kin... | 209,000 | Operational | |||||||
Kin... | 184,000 | Operational | |||||||
Kin... | 3,000 | 1 | Operational | ||||||
Kin... | 76,700 | 59 | Operational | ||||||
Kin... | 2,600 | 2 | Operational | ||||||
Kin... | 198,900 | 153 | Operational | ||||||
Kin... | 248,160 | 88 | Operational | ||||||
Kin... | 63,000 | 21 | Operational | ||||||
Kin... | 118,000 | 59 | Operational | ||||||
Kin... | 180,000 | 90 | Operational | ||||||
Kin... | 10,000 | 5 | Operational | ||||||
Kin... | 17,900 | 10 | Operational | ||||||
Kin... | 188,650 | 110 | Operational | ||||||
Kin... | 125,400 | 57 | Operational | ||||||
Kin... | 24,000 | 12 | Operational | ||||||
Kin... | 2,000 | 1 | Dismantled | ||||||
Kir... | 2,500 | 1 | Operational | ||||||
Kit... | 51,000 | 34 | Operational | ||||||
Kit... | 100,800 | 48 | Operational | ||||||
Kit... | 1,000,000 | Planned | |||||||
Kit... | 2,500,000 | Planned | |||||||
Klo... | 24,000 | 16 | Operational | ||||||
Klo... | 75,000 | 50 | Dismantled | ||||||
Klo... | 80,000 | 50 | Operational | ||||||
Klo... | 2,400 | 1 | Operational | ||||||
Klo... | 101,200 | 44 | Operational | ||||||
Klo... | 120,000 | 80 | Operational | ||||||
Klo... | 76,500 | 51 | Operational | ||||||
KOD... | 80,000 | 40 | Dismantled | ||||||
KOD... | 4,000 | 20 | Dismantled | ||||||
Kod... | 4,500 | 3 | Operational | ||||||
Kos... | 126,900 | 45 | Operational | ||||||
Kos... | 25,300 | 11 | Operational | ||||||
Kos... | 7,560 | 3 | Operational | ||||||
Kos... | 62,040 | 22 | Operational | ||||||
Kot... | 100 | 1 | Operational | ||||||
Kot... | 1,800 | 2 | Operational | ||||||
Kum... | 50,000 | 25 | Operational | ||||||
La ... | 198,450 | 63 | Operational | ||||||
La ... | 306,000 | 111 | Operational | ||||||
Lac... | 230 | 1 | Operational | ||||||
Lac... | 304,560 | 108 | Operational | ||||||
Laf... | 300 | 3 | Operational | ||||||
Lak... | 106,500 | 142 | Operational | ||||||
Lak... | 103,500 | 138 | Dismantled | ||||||
Lak... | 89,700 | 39 | Operational | ||||||
Lak... | 2,100 | 1 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Lak... | 8,400 | 4 | Operational | ||||||
Lak... | 1,244,000 | Planned | |||||||
Lak... | 950 | 1 | Operational | ||||||
Lak... | 1,600 | 1 | Operational | ||||||
Lak... | 100,800 | 56 | Operational | ||||||
Lak... | 205,500 | 137 | Operational | ||||||
Lak... | 48,000 | 32 | Operational | ||||||
Lak... | 900 | 1 | Operational | ||||||
Lak... | 8,250 | 11 | Operational | ||||||
Lak... | 2,640 | 4 | Operational | ||||||
Lak... | 1,900 | 2 | Operational | ||||||
Lal... | 3,300 | 5 | Operational | ||||||
Lam... | 1,500 | 1 | Operational | ||||||
Lam... | 1,500 | 1 | Operational | ||||||
Lam... | 4,500 | 3 | Operational | ||||||
Lan... | 19,500 | 13 | Dismantled | ||||||
Lan... | 59,940 | 37 | Dismantled | ||||||
Lan... | 46,980 | 29 | Dismantled | ||||||
Lan... | 59,940 | 37 | Operational | ||||||
Lan... | 19,500 | 13 | Operational | ||||||
Lan... | 46,980 | 29 | Operational | ||||||
Lan... | 40,500 | 27 | Dismantled | ||||||
Lan... | 40,500 | 27 | Operational | ||||||
Lan... | 43,740 | 27 | Operational | ||||||
Lan... | 150,000 | 100 | Dismantled | ||||||
Lan... | 160,000 | 100 | Operational | ||||||
Lar... | 81,000 | 54 | Operational | ||||||
Las... | 21,000 | 5 | Operational | ||||||
Las... | 180,600 | 43 | Operational | ||||||
Las... | 259,600 | 118 | Operational | ||||||
Las... | 14,000 | 7 | Operational | ||||||
Lat... | 62,100 | 27 | Operational | ||||||
Lau... | 69,000 | 30 | Operational | ||||||
Lau... | 97,600 | 61 | Operational | ||||||
Lau... | 119,600 | 52 | Operational | ||||||
Lea... | 1,725,000 | Planned | |||||||
Lea... | 100,500 | 67 | Dismantled | ||||||
Lea... | 90,300 | 43 | Operational | ||||||
Lea... | 111,000 | 74 | Operational | ||||||
Lea... | 109,000 | Operational | |||||||
Led... | 207,000 | 46 | Operational | ||||||
Lem... | 24,000 | 12 | Operational | ||||||
Len... | 750 | 1 | Operational | ||||||
Leo... | 1,500 | 1 | Operational | ||||||
Leo... | 3,000 | Operational | |||||||
Lew... | 300 | 3 | Dismantled | ||||||
Lim... | 1,500 | 3 | Operational | ||||||
Lim... | 1,500 | 3 | Operational | ||||||
Lim... | 295,800 | 87 | Operational | ||||||
Lim... | 200,000 | 125 | Operational | ||||||
Lim... | 200,000 | 125 | Operational | ||||||
Lim... | 205,700 | 121 | Operational | ||||||
Lin... | 900 | 1 | Operational | ||||||
Lin... | 2,500 | 1 | Operational | ||||||
Lin... | 301,740 | 107 | Operational | ||||||
Lin... | 150,000 | 75 | Operational | ||||||
Lin... | 8,200 | 4 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Lin... | 43,050 | 21 | Operational | ||||||
Lit... | 250,000 | 100 | Operational | ||||||
Lit... | 1,500 | 1 | Operational | ||||||
Lit... | 74,000 | 37 | Operational | ||||||
Lit... | 10,000 | 5 | Operational | ||||||
Lit... | 10,000 | 5 | Operational | ||||||
Liv... | 199,500 | 76 | Operational | ||||||
Lla... | 80,000 | 80 | Operational | ||||||
Lla... | 1,320 | 2 | Operational | ||||||
Lla... | 660 | 1 | Operational | ||||||
LLC... | 200 | 2 | Operational | ||||||
Loc... | 183,750 | 75 | Operational | ||||||
Loc... | 26,000 | 13 | Operational | ||||||
Loc... | 102,000 | 51 | Operational | ||||||
Loe... | 5,000 | 4 | Operational | ||||||
Log... | 201,000 | 134 | Operational | ||||||
Log... | 200,100 | 87 | Operational | ||||||
Lon... | 41,000 | Operational | |||||||
Lon... | 18,000 | 9 | Operational | ||||||
Lon... | 72,000 | 36 | Operational | ||||||
Lon... | 110,000 | 55 | Operational | ||||||
Lon... | 104,000 | 52 | Operational | ||||||
Lon... | 52,000 | 26 | Operational | ||||||
Lon... | 44,000 | 22 | Operational | ||||||
Lon... | 81,200 | 29 | Operational | ||||||
Lon... | 6,900 | 3 | Operational | ||||||
Lon... | 200,000 | 100 | Operational | ||||||
Loo... | 37,800 | 18 | Operational | ||||||
Lor... | 100,500 | 67 | Operational | ||||||
Lor... | 49,500 | 33 | Operational | ||||||
Lor... | 1,400 | 4 | Operational | ||||||
Lor... | 69,000 | 30 | Operational | ||||||
Lor... | 6,860 | 4 | Operational | ||||||
Los... | 150,000 | 75 | Operational | ||||||
Los... | 100,000 | 50 | Operational | ||||||
Los... | 200,100 | 87 | Operational | ||||||
Los... | 201,600 | 84 | Operational | ||||||
Los... | 200,000 | 100 | Operational | ||||||
Los... | 200,000 | 100 | Operational | ||||||
Los... | 110,000 | 55 | Operational | ||||||
Los... | 150,000 | 100 | Operational | ||||||
Los... | 100,650 | 61 | Operational | ||||||
Low... | 216,200 | 94 | Operational | ||||||
Low... | 126,500 | 55 | Operational | ||||||
Lub... | 7,500 | 3 | Operational | ||||||
Lun... | 251,022 | 107 | Operational | ||||||
Lut... | 1,600 | 1 | Operational | ||||||
Luv... | 49,500 | 33 | Operational | ||||||
LWS... | 600 | 1 | Operational | ||||||
Mac... | 50,400 | 28 | Operational | ||||||
Mac... | 1,800 | 2 | Operational | ||||||
Mac... | 119,646 | 51 | Operational | ||||||
Mad... | 11,550 | 7 | Operational | ||||||
Mag... | 203,280 | 112 | Operational | ||||||
Mai... | 8,250 | 5 | Operational | ||||||
Mai... | 144,000 | Planned | |||||||
Maj... | 80,000 | Dismantled | |||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Maj... | 32,000 | 20 | Operational | ||||||
Maj... | 49,600 | 31 | Operational | ||||||
Maj... | 84,800 | 53 | Operational | ||||||
Mam... | 198,900 | 117 | Operational | ||||||
Man... | 1,790 | 1 | Operational | ||||||
Man... | 189,000 | 126 | Operational | ||||||
Map... | 33,000 | 20 | Operational | ||||||
Map... | 61,050 | 37 | Operational | ||||||
Map... | 136,950 | 83 | Operational | ||||||
Map... | 90,750 | 55 | Operational | ||||||
Mar... | 215,250 | 70 | Operational | ||||||
Mar... | 140,400 | 78 | Dismantled | ||||||
Mar... | 156,000 | 78 | Operational | ||||||
Mar... | 70,200 | 39 | Dismantled | ||||||
Mar... | 78,000 | 39 | Operational | ||||||
Mar... | 100 | 1 | Operational | ||||||
Mar... | 230,400 | 96 | Operational | ||||||
Mar... | 4,500 | 3 | Operational | ||||||
Mar... | 600 | 1 | Operational | ||||||
Mar... | 33,000 | 22 | Operational | ||||||
Mar... | 9,000 | 6 | Operational | ||||||
Mar... | 16,200 | 10 | Operational | ||||||
Mar... | 72,000 | 36 | Operational | ||||||
Mar... | 18,900 | 9 | Operational | ||||||
Mar... | 110 | 1 | Operational | ||||||
Mar... | 2,000 | 8 | Operational | ||||||
Mar... | 182,400 | 38 | Operational | ||||||
Mas... | 4,000 | 2 | Operational | ||||||
Mas... | 6,000 | 3 | Operational | ||||||
Mas... | 2,300 | 1 | Operational | ||||||
Mas... | 5,640 | 2 | Operational | ||||||
Mas... | 6,000 | 3 | Operational | ||||||
Mas... | 660 | 1 | Operational | ||||||
Mav... | 306,600 | 73 | Operational | ||||||
Mav... | 76,800 | 16 | Operational | ||||||
Mav... | 20,000 | 10 | Operational | ||||||
Mav... | 22,000 | 10 | Operational | ||||||
Mav... | 59,200 | 16 | Operational | ||||||
Mav... | 288,400 | 103 | Operational | ||||||
McA... | 150,000 | 100 | Operational | ||||||
McE... | 225 | 1 | Operational | ||||||
McF... | 28,000 | Dismantled | |||||||
McF... | 35,150 | 19 | Operational | ||||||
McK... | 14,400 | 9 | Operational | ||||||
McN... | 9,900 | 6 | Operational | ||||||
McN... | 13,500 | 9 | Operational | ||||||
McN... | 9,000 | 6 | Operational | ||||||
McN... | 1,650 | 1 | Operational | ||||||
McN... | 9,000 | 10 | Operational | ||||||
Mea... | 119,700 | 57 | Operational | ||||||
Mea... | 199,650 | 121 | Operational | ||||||
Mea... | 91,500 | 61 | Operational | ||||||
Mea... | 7,500 | 5 | Operational | ||||||
Mea... | 103,500 | 69 | Operational | ||||||
Mea... | 98,700 | 47 | Operational | ||||||
Mea... | 100,000 | 50 | Operational | ||||||
Mea... | 24,000 | 12 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Mea... | 176,400 | 49 | Operational | ||||||
Mea... | 1,600 | 1 | Operational | ||||||
Med... | 1,420 | 2 | Operational | ||||||
Med... | 3,550 | 5 | Operational | ||||||
Med... | 1,420 | 2 | Operational | ||||||
Med... | 2,500 | 1 | Dismantled | ||||||
Meh... | 104,000 | 65 | Operational | ||||||
Meh... | 36,800 | 23 | Operational | ||||||
Men... | 53,550 | 63 | Dismantled | ||||||
Men... | 76,130 | 29 | Operational | ||||||
Mer... | 7,400 | 74 | Operational | ||||||
Mer... | 150 | 1 | Operational | ||||||
Mer... | 105,000 | 35 | Operational | ||||||
Mer... | 96,000 | 32 | Operational | ||||||
Mer... | 225,000 | 77 | Operational | ||||||
Mer... | 150,000 | 75 | Operational | ||||||
Mes... | 1,500 | 1 | Operational | ||||||
Mes... | 211,220 | 118 | Operational | ||||||
Mes... | 345,000 | 69 | Operational | ||||||
Mes... | 418,900 | 118 | Operational | ||||||
Mes... | 201,600 | 56 | Operational | ||||||
Met... | 600 | 1 | Operational | ||||||
Met... | 660 | 1 | Operational | ||||||
Mey... | 30,000 | 20 | Operational | ||||||
Mia... | 288,600 | 156 | Operational | ||||||
Mic... | 3,000 | Operational | |||||||
Mic... | 69,000 | 46 | Operational | ||||||
Mic... | 90,000 | 50 | Operational | ||||||
Mid... | 106,000 | Under construction | |||||||
Mid... | 162,855 | 47 | Operational | ||||||
Mil... | 145,000 | 58 | Operational | ||||||
Mil... | 58,500 | 39 | Operational | ||||||
Mil... | 102,000 | 68 | Operational | ||||||
Mil... | 15,000 | 10 | Operational | ||||||
Mil... | 66,000 | 33 | Operational | ||||||
Mil... | 99,000 | 36 | Operational | ||||||
Mil... | 135,000 | 30 | Operational | ||||||
Mil... | 19,500 | 13 | Operational | ||||||
Mil... | 50,000 | 25 | Operational | ||||||
Min... | 99,200 | 62 | Dismantled | ||||||
Min... | 99,000 | Operational | |||||||
Min... | 98,000 | Operational | |||||||
Min... | 100,800 | 63 | Dismantled | ||||||
Min... | 111,000 | Operational | |||||||
Min... | 100,800 | 63 | Dismantled | ||||||
Min... | 25,000 | 10 | Operational | ||||||
Min... | 66,700 | 29 | Operational | ||||||
Min... | 10,140 | 6 | Operational | ||||||
Min... | 24,010 | 14 | Operational | ||||||
Min... | 1,140 | 1 | Operational | ||||||
Min... | 32,000 | Operational | |||||||
Min... | 32,000 | 20 | Operational | ||||||
Min... | 96,000 | 64 | Operational | ||||||
Min... | 54,000 | 36 | Operational | ||||||
Min... | 5,400 | 3 | Operational | ||||||
Min... | 200,000 | 100 | Operational | ||||||
Min... | 3,800 | 4 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Min... | 11,550 | 7 | Operational | ||||||
Mis... | 1,900 | 2 | Operational | ||||||
Mis... | 1,800 | 2 | Operational | ||||||
Mog... | 4,000 | 8 | Operational | ||||||
Moj... | 18,000 | 30 | Operational | ||||||
Moj... | 66,750 | 267 | Operational | ||||||
Moj... | 50,600 | 184 | Operational | ||||||
Moj... | 31,900 | 116 | Operational | ||||||
Moj... | 35,400 | 59 | Operational | ||||||
Mom... | 808,500 | Planned | |||||||
Mon... | 183,600 | 51 | Operational | ||||||
Mon... | 17,250 | 5 | Operational | ||||||
Mon... | 36,800 | 16 | Operational | ||||||
Mon... | 78,200 | 34 | Operational | ||||||
Mon... | 30,000 | 20 | Operational | ||||||
Moo... | 750 | 1 | Operational | ||||||
Moo... | 750 | 1 | Operational | ||||||
Mor... | 51,000 | 34 | Operational | ||||||
Mor... | 49,500 | 33 | Operational | ||||||
Mor... | 170,000 | Under construction | |||||||
Mor... | 101,200 | 44 | Operational | ||||||
Mou... | 100 | 1 | Operational | ||||||
Mou... | 164,000 | 82 | Operational | ||||||
Mou... | 100,000 | 50 | Operational | ||||||
Mou... | 3,000 | 2 | Operational | ||||||
Mou... | 3,300 | 2 | Operational | ||||||
Mou... | 23,000 | 10 | Operational | ||||||
Mou... | 23,000 | 10 | Operational | ||||||
Mou... | 23,000 | 10 | Operational | ||||||
Mou... | 23,000 | 10 | Operational | ||||||
Mou... | 23,000 | 10 | Operational | ||||||
Mou... | 23,000 | 10 | Operational | ||||||
Mou... | 155,100 | 55 | Operational | ||||||
Mou... | 13,800 | 6 | Operational | ||||||
Mou... | 42,000 | 20 | Operational | ||||||
Mou... | 15,000 | 12 | Operational | ||||||
Mou... | 100 | 1 | Operational | ||||||
Mou... | 100 | 1 | Operational | ||||||
Mou... | 44,400 | 74 | Dismantled | ||||||
Mou... | 22,200 | 37 | Operational | ||||||
Mou... | 22,440 | 34 | Operational | ||||||
Mou... | 49,000 | 49 | Operational | ||||||
Mou... | 55,900 | 13 | Operational | ||||||
Mou... | 10,800 | 3 | Operational | ||||||
Mou... | 60,900 | 29 | Operational | ||||||
Mou... | 79,800 | 38 | Operational | ||||||
Mou... | 66,000 | 44 | Operational | ||||||
Mow... | 98,900 | 43 | Dismantled | ||||||
Mow... | 99,000 | Operational | |||||||
Moz... | 30,000 | 12 | Operational | ||||||
Mun... | 34,500 | 23 | Operational | ||||||
Mus... | 10,500 | 7 | Operational | ||||||
Mus... | 10,500 | 7 | Operational | ||||||
MUT... | 100 | 1 | Operational | ||||||
MWR... | 1,200 | 2 | Operational | ||||||
Na ... | 27,600 | 8 | Operational | ||||||
Nan... | 100 | 1 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Nat... | 100 | 1 | Operational | ||||||
Neo... | 253,000 | 115 | Operational | ||||||
Neo... | 52,800 | 24 | Operational | ||||||
Nep... | 1,500 | 1 | Operational | ||||||
Nes... | 1,850 | 1 | Operational | ||||||
Nev... | 500 | 2 | Operational | ||||||
New... | 8,000 | 4 | Operational | ||||||
New... | 94,500 | 45 | Operational | ||||||
New... | 12,000 | Planned | |||||||
New... | 100 | 1 | Operational | ||||||
New... | 100,050 | 29 | Operational | ||||||
New... | 100,000 | 50 | Operational | ||||||
New... | 1,500 | 1 | Operational | ||||||
New... | 204,000 | 136 | Operational | ||||||
New... | 100 | 1 | Operational | ||||||
NEX... | 100 | 1 | Operational | ||||||
Nex... | 217,500 | 145 | Operational | ||||||
Nin... | 48,100 | 37 | Operational | ||||||
Nin... | 15,600 | 12 | Operational | ||||||
Nin... | 32,200 | 14 | Operational | ||||||
Nin... | 17,900 | 10 | Operational | ||||||
Nin... | 190,365 | 111 | Operational | ||||||
Niy... | 203,040 | 72 | Operational | ||||||
No ... | 6,000 | 3 | Operational | ||||||
Nob... | 97,500 | 65 | Operational | ||||||
Nob... | 100,500 | 67 | Operational | ||||||
Nob... | 106,500 | 71 | Operational | ||||||
Nob... | 100,500 | 67 | Operational | ||||||
Nob... | 81,000 | 54 | Operational | ||||||
Nob... | 114,000 | 76 | Operational | ||||||
Nob... | 126,000 | 84 | Operational | ||||||
Nob... | 201,000 | 134 | Operational | ||||||
Nob... | 2,100 | 1 | Operational | ||||||
Nob... | 230,400 | 64 | Operational | ||||||
Nob... | 20,000 | 10 | Operational | ||||||
Nom... | 1,800 | 2 | Operational | ||||||
Nor... | 10,000 | 10 | Operational | ||||||
NOR... | 100 | 1 | Operational | ||||||
Nor... | 8,750 | 7 | Operational | ||||||
Nor... | 70,000 | 35 | Operational | ||||||
Nor... | 40,500 | 27 | Operational | ||||||
Nor... | 21,000 | 14 | Operational | ||||||
Nor... | 200,000 | 100 | Operational | ||||||
Nor... | 140,000 | 70 | Operational | ||||||
Nor... | 125,400 | 57 | Operational | ||||||
Nor... | 24,000 | 12 | Operational | ||||||
Nor... | 1,500 | 1 | Operational | ||||||
Nor... | 900 | 1 | Operational | ||||||
Nor... | 11,880 | 18 | Operational | ||||||
Nor... | 162,000 | 100 | Operational | ||||||
Nor... | 22,500 | 15 | Dismantled | ||||||
Nor... | 24,000 | 15 | Operational | ||||||
Nor... | 151,800 | 66 | Dismantled | ||||||
Nor... | 151,800 | 66 | Operational | ||||||
Nor... | 179,250 | 66 | Operational | ||||||
Nor... | 13,720 | 8 | Operational | ||||||
Nor... | 100,000 | Operational | |||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Nor... | 100 | 1 | Operational | ||||||
Nor... | 105,000 | 42 | Operational | ||||||
Nor... | 1,400 | 2 | Operational | ||||||
Nor... | 900 | 1 | Operational | ||||||
Not... | 90,750 | 55 | Operational | ||||||
Not... | 60,000 | 40 | Operational | ||||||
Not... | 1,800 | 1 | Operational | ||||||
Num... | 105,800 | 27 | Operational | ||||||
Oak... | 1,600 | 2 | Operational | ||||||
Oak... | 23,100 | 33 | Operational | ||||||
Oak... | 800 | 1 | Operational | ||||||
Oak... | 1,350 | 1 | Operational | ||||||
Oak... | 4,200 | 7 | Operational | ||||||
Oak... | 43,200 | 24 | Operational | ||||||
Oak... | 20,350 | 11 | Operational | ||||||
Oak... | 147,600 | 48 | Operational | ||||||
Oas... | 60,000 | 60 | Dismantled | ||||||
Oas... | 54,000 | 15 | Operational | ||||||
Oas... | 18,000 | 6 | Operational | ||||||
Oce... | 1,100,000 | Approved | |||||||
Oce... | 1,148,000 | Planned | |||||||
Oco... | 41,400 | 18 | Operational | ||||||
Oco... | 222,780 | 94 | Operational | ||||||
Oco... | 58,800 | 28 | Operational | ||||||
OCS... | 650,000 | Planned | |||||||
OCS... | 650,000 | Planned | |||||||
Ode... | 200,000 | 100 | Operational | ||||||
Odi... | 21,000 | 10 | Operational | ||||||
Ohi... | 1,600 | 4 | Operational | ||||||
Okl... | 51,000 | 34 | Dismantled | ||||||
Okl... | 51,000 | 34 | Dismantled | ||||||
Okl... | 102,000 | Operational | |||||||
Old... | 151,200 | 63 | Operational | ||||||
Oli... | 50,600 | 22 | Dismantled | ||||||
Oli... | 51,000 | Operational | |||||||
Oli... | 48,000 | 32 | Dismantled | ||||||
Oli... | 51,200 | 32 | Operational | ||||||
Oli... | 8,950 | 5 | Operational | ||||||
Oli... | 86,100 | 41 | Operational | ||||||
Ols... | 1,500 | 2 | Operational | ||||||
Oly... | 2,000,000 | Planned | |||||||
Oma... | 660 | 1 | Operational | ||||||
Ora... | 84,240 | 52 | Operational | ||||||
Ora... | 9,720 | 6 | Operational | ||||||
Orc... | 40,000 | 16 | Operational | ||||||
Ore... | 13,500 | 9 | Operational | ||||||
Ori... | 102,000 | 51 | Operational | ||||||
Ori... | 258,000 | 129 | Operational | ||||||
Ori... | 140,800 | 64 | Operational | ||||||
Ori... | 150,000 | 75 | Operational | ||||||
Osa... | 150,360 | 84 | Operational | ||||||
Osa... | 1,500 | 1 | Operational | ||||||
Osb... | 147,000 | 70 | Operational | ||||||
Osb... | 8,950 | 5 | Operational | ||||||
Oso... | 216,000 | 48 | Operational | ||||||
Oso... | 31,395 | 13 | Operational | ||||||
Oth... | 500 | 1 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Oti... | 1,500 | 1 | Operational | ||||||
Ott... | 1,500 | 1 | Operational | ||||||
Ott... | 13,800 | 4 | Operational | ||||||
Ott... | 144,400 | 38 | Operational | ||||||
OU ... | 101,200 | 44 | Operational | ||||||
Out... | 36,000 | 18 | Operational | ||||||
Out... | 48,400 | 22 | Operational | ||||||
Out... | 214,200 | 51 | Operational | ||||||
O’B... | 250,260 | 104 | Operational | ||||||
Pac... | 46,860 | 71 | Operational | ||||||
Pac... | 2,100 | 3 | Operational | ||||||
Pac... | 143,500 | 70 | Operational | ||||||
Pai... | 39,000 | 13 | Operational | ||||||
Pai... | 19,000 | Dismantled | |||||||
Pak... | 21,000 | 14 | Operational | ||||||
Pal... | 144,900 | 46 | Operational | ||||||
Pal... | 37,500 | 15 | Operational | ||||||
Pal... | 4,600 | 2 | Operational | ||||||
Pal... | 250,000 | 125 | Operational | ||||||
Pal... | 90,000 | 45 | Operational | ||||||
Pal... | 249,900 | 147 | Operational | ||||||
Pal... | 104,400 | 58 | Operational | ||||||
Pan... | 218,300 | 118 | Operational | ||||||
Pan... | 181,700 | 79 | Operational | ||||||
Pan... | 145,200 | 66 | Operational | ||||||
Pan... | 11,500 | 5 | Operational | ||||||
Pan... | 142,500 | 99 | Dismantled | ||||||
Pan... | 115,500 | 77 | Dismantled | ||||||
Pan... | 199,500 | 133 | Dismantled | ||||||
Pan... | 105,600 | 66 | Operational | ||||||
Pan... | 107,200 | 67 | Operational | ||||||
Pan... | 258,000 | Operational | |||||||
Pap... | 179,850 | 109 | Operational | ||||||
Pap... | 200,100 | 87 | Operational | ||||||
Par... | 1,500,000 | Planned | |||||||
Pas... | 42,900 | 13 | Operational | ||||||
Pat... | 17,250 | 5 | Operational | ||||||
Pat... | 208,800 | 58 | Operational | ||||||
Pat... | 13,000 | Dismantled | |||||||
Pat... | 6,000 | 3 | Operational | ||||||
Pat... | 24,000 | 12 | Operational | ||||||
Pat... | 9,000 | 6 | Operational | ||||||
Pay... | 21,000 | 14 | Operational | ||||||
Pea... | 60,860 | 34 | Operational | ||||||
Peb... | 98,700 | 47 | Operational | ||||||
Pee... | 199,500 | 133 | Dismantled | ||||||
Pee... | 29,700 | 33 | Operational | ||||||
Pee... | 212,800 | 133 | Operational | ||||||
Peg... | 15,120 | 6 | Operational | ||||||
Peg... | 9,200 | 4 | Operational | ||||||
Peg... | 24,480 | 9 | Operational | ||||||
Peg... | 102,500 | 41 | Operational | ||||||
Pem... | 1,000 | 1 | Operational | ||||||
Pen... | 201,600 | 84 | Operational | ||||||
Pen... | 201,600 | 84 | Operational | ||||||
Per... | 6,900 | 3 | Operational | ||||||
Per... | 99,200 | 62 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Per... | 16,100 | 7 | Operational | ||||||
Per... | 182,500 | 73 | Operational | ||||||
Pet... | 900 | 1 | Operational | ||||||
Pet... | 40,500 | 27 | Operational | ||||||
Pet... | 750 | 1 | Operational | ||||||
Pey... | 151,200 | 48 | Operational | ||||||
Phe... | 74,800 | 44 | Operational | ||||||
Phi... | 2,000 | 1 | Operational | ||||||
Pho... | 100 | 1 | Operational | ||||||
Pic... | 100 | 1 | Operational | ||||||
Pig... | 900 | 1 | Operational | ||||||
Pil... | 10,500 | 7 | Operational | ||||||
Pil... | 4,500 | 3 | Operational | ||||||
Pil... | 175,100 | 103 | Operational | ||||||
Pil... | 200 | 2 | Operational | ||||||
Pin... | 100 | 1 | Operational | ||||||
Pin... | 13,800 | 6 | Operational | ||||||
Pin... | 147,500 | 59 | Operational | ||||||
Pin... | 120,000 | 80 | Operational | ||||||
Pin... | 15,000 | 10 | Operational | ||||||
Pin... | 36,000 | 15 | Dismantled | ||||||
Pin... | 55,000 | Operational | |||||||
Pin... | 19,200 | 8 | Dismantled | ||||||
Pin... | 51,000 | 30 | Operational | ||||||
Pio... | 85,100 | 46 | Operational | ||||||
Pio... | 3,000 | 1 | Operational | ||||||
Pio... | 3,000 | 1 | Operational | ||||||
Pio... | 191,400 | 116 | Operational | ||||||
Pio... | 6,600 | 4 | Operational | ||||||
Pio... | 31,350 | 19 | Operational | ||||||
Pio... | 70,950 | 43 | Operational | ||||||
Pio... | 150,400 | 94 | Operational | ||||||
Pip... | 750 | 1 | Operational | ||||||
Pis... | 9,100 | 5 | Operational | ||||||
Ple... | 22,000 | 11 | Operational | ||||||
Ple... | 200,000 | 100 | Operational | ||||||
Plu... | 229,600 | 82 | Operational | ||||||
Ply... | 16,100 | 7 | Operational | ||||||
Ply... | 186,120 | 66 | Operational | ||||||
Poc... | 80,000 | 40 | Dismantled | ||||||
Poc... | 48,000 | 24 | Operational | ||||||
Poc... | 35,200 | 16 | Operational | ||||||
Poi... | 57,600 | 16 | Operational | ||||||
Pol... | 152,500 | 61 | Operational | ||||||
Pol... | 16,100 | 7 | Operational | ||||||
Pol... | 2,500 | 1 | Operational | ||||||
Pom... | 123,000 | 82 | Dismantled | ||||||
Pom... | 1,500 | 1 | Dismantled | ||||||
Pom... | 73,500 | 49 | Dismantled | ||||||
Pom... | 58,500 | 39 | Dismantled | ||||||
Pom... | 19,500 | 13 | Operational | ||||||
Pom... | 265,000 | Operational | |||||||
Pon... | 82,320 | 48 | Operational | ||||||
Pon... | 83,160 | 33 | Operational | ||||||
Pon... | 9,200 | 4 | Operational | ||||||
Pon... | 9,200 | 4 | Operational | ||||||
Pon... | 19,690 | 11 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Pon... | 16,500 | 22 | Dismantled | ||||||
Pon... | 9,900 | 15 | Operational | ||||||
Pon... | 4,500 | 6 | Dismantled | ||||||
Pon... | 600 | 1 | Dismantled | ||||||
Por... | 100 | 1 | Operational | ||||||
Por... | 600 | 1 | Operational | ||||||
Por... | 1,500 | 1 | Operational | ||||||
Por... | 660 | 1 | Operational | ||||||
Pos... | 201,000 | 134 | Operational | ||||||
Pow... | 27,500 | 11 | Operational | ||||||
Pow... | 17,500 | 7 | Operational | ||||||
Pra... | 164,000 | 82 | Operational | ||||||
Pra... | 4,000 | 2 | Operational | ||||||
Pra... | 200,600 | 118 | Operational | ||||||
Pra... | 73,500 | 41 | Operational | ||||||
Pra... | 35,800 | 20 | Operational | ||||||
Pra... | 300,000 | 100 | Operational | ||||||
Pra... | 28,875 | 11 | Operational | ||||||
Pra... | 170,400 | 48 | Operational | ||||||
Pra... | 199,920 | 119 | Operational | ||||||
Pra... | 1,650 | 1 | Operational | ||||||
Pra... | 99,000 | 60 | Operational | ||||||
Pra... | 163,000 | Operational | |||||||
Pra... | 2,600 | 2 | Dismantled | ||||||
Pra... | 4,500 | 3 | Operational | ||||||
Pra... | 115,500 | 77 | Operational | ||||||
Pra... | 225,400 | 98 | Operational | ||||||
Pra... | 18,400 | 8 | Operational | ||||||
Pre... | 600 | 1 | Operational | ||||||
Pre... | 216,600 | 57 | Operational | ||||||
Pri... | 302,400 | 63 | Operational | ||||||
Pri... | 3,000 | 2 | Operational | ||||||
Pro... | 10,000 | 5 | Operational | ||||||
Pro... | 72,000 | 36 | Operational | ||||||
Pry... | 108,000 | 54 | Operational | ||||||
Pry... | 116,600 | 53 | Operational | ||||||
Pry... | 9,200 | 4 | Operational | ||||||
Pue... | 1,800 | 1 | Operational | ||||||
PYC... | 10,000 | 10 | Operational | ||||||
Qui... | 98,000 | 49 | Operational | ||||||
Qui... | 300 | 3 | Operational | ||||||
Rad... | 305,800 | 139 | Operational | ||||||
Rai... | 100,500 | 67 | Operational | ||||||
Ral... | 10,000 | 5 | Operational | ||||||
Ran... | 300,000 | 120 | Operational | ||||||
Ran... | 263,000 | Operational | |||||||
Ran... | 1,000 | 1 | Operational | ||||||
Rat... | 211,220 | 118 | Operational | ||||||
Rat... | 318,150 | 101 | Operational | ||||||
Rat... | 23,000 | 10 | Operational | ||||||
Rat... | 126,900 | 47 | Operational | ||||||
Rat... | 102,900 | 49 | Operational | ||||||
Rat... | 160,000 | 64 | Operational | ||||||
Rea... | 166,320 | 48 | Operational | ||||||
Rea... | 33,810 | 14 | Operational | ||||||
Rec... | 50,600 | 22 | Operational | ||||||
Red... | 81,600 | 24 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Red... | 10,000 | 4 | Operational | ||||||
Red... | 84,000 | 56 | Dismantled | ||||||
Red... | 84,000 | 56 | Operational | ||||||
Red... | 350,000 | 125 | Operational | ||||||
Red... | 299,250 | 95 | Operational | ||||||
Red... | 123,000 | 82 | Operational | ||||||
Red... | 30,000 | 15 | Operational | ||||||
Red... | 4,600 | 2 | Operational | ||||||
Red... | 102,400 | 64 | Operational | ||||||
Red... | 100,000 | 50 | Operational | ||||||
Red... | 100,000 | 50 | Operational | ||||||
Red... | 34,000 | 17 | Operational | ||||||
Red... | 65,100 | 31 | Operational | ||||||
Ree... | 2,000 | 1 | Operational | ||||||
Ree... | 1,670 | 1 | Operational | ||||||
Ree... | 2,300 | 1 | Operational | ||||||
Ree... | 2,700 | 1 | Operational | ||||||
REG... | 2,500 | 1 | Operational | ||||||
Rel... | 138,600 | 40 | Operational | ||||||
Rel... | 51,000 | 17 | Operational | ||||||
Rel... | 18,000 | 6 | Operational | ||||||
Rev... | 704,000 | Under construction | |||||||
Rev... | 884,000 | Planned | |||||||
Ric... | 130 | 1 | Operational | ||||||
Ric... | 27,600 | 12 | Operational | ||||||
Ric... | 103,320 | 41 | Operational | ||||||
Ric... | 100 | 1 | Operational | ||||||
Rid... | 250 | 1 | Operational | ||||||
Rid... | 1,300 | 12 | Operational | ||||||
Rid... | 14,000 | 28 | Operational | ||||||
Rid... | 25,300 | 11 | Operational | ||||||
Rim... | 189,000 | 126 | Operational | ||||||
Rin... | 39,900 | 14 | Operational | ||||||
Rio... | 237,600 | 66 | Operational | ||||||
Rip... | 275 | 1 | Operational | ||||||
Rip... | 50,000 | 20 | Operational | ||||||
Ris... | 99,000 | 33 | Operational | ||||||
Ris... | 99,000 | 30 | Operational | ||||||
Roa... | 13,125 | 5 | Operational | ||||||
Roa... | 67,500 | 15 | Operational | ||||||
Roc... | 10,800 | 4 | Operational | ||||||
Roc... | 8,460 | 3 | Operational | ||||||
Roc... | 2,500 | 1 | Operational | ||||||
Roc... | 5,000 | 2 | Operational | ||||||
Roc... | 300,000 | 150 | Operational | ||||||
Roc... | 133,875 | 51 | Operational | ||||||
Roc... | 20,700 | 9 | Operational | ||||||
Roc... | 100 | 1 | Operational | ||||||
Roc... | 50,000 | 50 | Operational | ||||||
Roc... | 46,200 | 21 | Operational | ||||||
Roc... | 24,200 | 11 | Operational | ||||||
Roc... | 33,600 | 8 | Operational | ||||||
Roc... | 32,000 | 8 | Operational | ||||||
Roc... | 79,200 | 44 | Operational | ||||||
Roc... | 121,900 | 53 | Operational | ||||||
Roc... | 27,520 | 16 | Operational | ||||||
Roc... | 75,000 | Under construction | |||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Roc... | 148,800 | 93 | Operational | ||||||
Roe... | 1,500 | 1 | Operational | ||||||
Rol... | 443,900 | 193 | Dismantled | ||||||
Rol... | 116 | Operational | |||||||
Rol... | 60,000 | 40 | Operational | ||||||
Roo... | 250,000 | 125 | Operational | ||||||
Ros... | 126,500 | 55 | Operational | ||||||
Ros... | 209,000 | 209 | Operational | ||||||
Ros... | 197,000 | 197 | Operational | ||||||
Ros... | 249,000 | 166 | Operational | ||||||
Ros... | 750 | 1 | Operational | ||||||
Ros... | 1,790 | 1 | Operational | ||||||
Ros... | 84,000 | 20 | Operational | ||||||
Ros... | 18,000 | 5 | Operational | ||||||
Ros... | 11,220 | 17 | Operational | ||||||
Rot... | 50,000 | 20 | Operational | ||||||
Rou... | 100,000 | 24 | Under construction | ||||||
Rou... | 205,860 | 73 | Operational | ||||||
Rou... | 20,700 | 9 | Operational | ||||||
Rou... | 150,000 | 75 | Operational | ||||||
Rox... | 15,200 | 4 | Operational | ||||||
Rug... | 149,100 | 71 | Operational | ||||||
Rus... | 400,000 | 200 | Operational | ||||||
Rus... | 200,000 | 100 | Operational | ||||||
Rus... | 249,000 | 120 | Operational | ||||||
Rut... | 15,840 | 24 | Operational | ||||||
S.C... | 3,000 | 2 | Operational | ||||||
Sac... | 39,100 | 17 | Operational | ||||||
Sac... | 33,840 | 12 | Operational | ||||||
Sac... | 1,260 | 2 | Operational | ||||||
Sac... | 200 | 2 | Operational | ||||||
Sad... | 8,550 | 3 | Operational | ||||||
Sad... | 25,650 | 9 | Operational | ||||||
Sag... | 470,800 | 214 | Operational | ||||||
Sag... | 52,000 | 26 | Operational | ||||||
Sag... | 338,400 | 120 | Operational | ||||||
Sal... | 1,700 | 1 | Operational | ||||||
Sal... | 21,000 | 14 | Operational | ||||||
Sal... | 174,000 | 87 | Operational | ||||||
Sal... | 660 | 1 | Operational | ||||||
Sal... | 660 | 1 | Operational | ||||||
San... | 675 | 3 | Operational | ||||||
San... | 26,000 | 222 | Operational | ||||||
San... | 2,000 | 4 | Operational | ||||||
San... | 5,000 | 10 | Operational | ||||||
San... | 8,000 | 16 | Operational | ||||||
San... | 1,000 | 2 | Operational | ||||||
San... | 5,000 | 50 | Operational | ||||||
San... | 120,000 | 120 | Dismantled | ||||||
San... | 90,000 | Operational | |||||||
San... | 93,000 | 31 | Operational | ||||||
San... | 90,000 | 45 | Operational | ||||||
San... | 1,000 | 2 | Operational | ||||||
San... | 600 | 1 | Operational | ||||||
San... | 400 | 1 | Operational | ||||||
San... | 50,000 | 25 | Operational | ||||||
San... | 87,600 | Operational | |||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
San... | 275 | 1 | Operational | ||||||
San... | 18,000 | Dismantled | |||||||
San... | 300,000 | 120 | Operational | ||||||
San... | 302,400 | 120 | Operational | ||||||
Sap... | 260,000 | Operational | |||||||
Sar... | 66,000 | 33 | Operational | ||||||
Sav... | 200 | 2 | Operational | ||||||
Saw... | 22,400 | 14 | Operational | ||||||
Sch... | 1,850 | 1 | Operational | ||||||
Sci... | 218,295 | 63 | Operational | ||||||
Sci... | 23,625 | 9 | Operational | ||||||
Sci... | 1,500 | 1 | Operational | ||||||
Sei... | 198,900 | 117 | Operational | ||||||
Sei... | 100,300 | 59 | Operational | ||||||
Sen... | 150,000 | 75 | Operational | ||||||
Sen... | 78,000 | 39 | Operational | ||||||
Sen... | 1,500 | 1 | Operational | ||||||
Set... | 150,400 | 94 | Operational | ||||||
Sev... | 300,000 | 107 | Under construction | ||||||
Sev... | 99,000 | 66 | Dismantled | ||||||
Sev... | 19,500 | 13 | Dismantled | ||||||
Sev... | 146,000 | Operational | |||||||
Sey... | 30,240 | 12 | Operational | ||||||
Sha... | 102,000 | 68 | Operational | ||||||
Sha... | 7,500 | 3 | Operational | ||||||
Sha... | 108,000 | 22 | Operational | ||||||
Sha... | 1,500 | 1 | Operational | ||||||
Sha... | 200 | 2 | Operational | ||||||
Sha... | 100 | 1 | Operational | ||||||
Sha... | 224,000 | Under construction | |||||||
Sha... | 2,100 | 1 | Operational | ||||||
Sha... | 202,300 | 119 | Operational | ||||||
Sha... | 1,700 | 2 | Operational | ||||||
Sha... | 11,880 | 18 | Operational | ||||||
She... | 40,000 | 16 | Operational | ||||||
She... | 900 | 1 | Operational | ||||||
She... | 207,500 | 83 | Operational | ||||||
She... | 195,000 | 78 | Operational | ||||||
She... | 125,000 | 50 | Operational | ||||||
She... | 60,000 | 24 | Operational | ||||||
She... | 247,500 | 99 | Operational | ||||||
She... | 10,000 | 4 | Operational | ||||||
She... | 1,000 | 4 | Dismantled | ||||||
She... | 150,000 | 50 | Operational | ||||||
She... | 150,000 | 60 | Dismantled | ||||||
She... | 120,000 | 60 | Operational | ||||||
She... | 660 | 1 | Operational | ||||||
Shi... | 115,500 | 77 | Operational | ||||||
Shi... | 34,500 | 23 | Operational | ||||||
Shi... | 66,000 | 33 | Operational | ||||||
Shi... | 84,000 | 42 | Operational | ||||||
Shi... | 8,200 | 4 | Operational | ||||||
Shi... | 94,300 | 46 | Operational | ||||||
Shi... | 92,250 | 45 | Operational | ||||||
Shi... | 10,250 | 5 | Operational | ||||||
Shi... | 20,000 | 8 | Operational | ||||||
Sho... | 10,320 | 6 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Sho... | 147,200 | 64 | Operational | ||||||
Sho... | 2,500 | 1 | Operational | ||||||
Sho... | 104,000 | 65 | Operational | ||||||
Sib... | 660 | 1 | Operational | ||||||
Sib... | 1,200 | 2 | Operational | ||||||
Sig... | 64,000 | 40 | Operational | ||||||
Sil... | 275 | 1 | Operational | ||||||
Sil... | 20,000 | 5 | Operational | ||||||
Sil... | 42,000 | 20 | Operational | ||||||
Sil... | 60,000 | 24 | Dismantled | ||||||
Sil... | 48,000 | Operational | |||||||
Ske... | 225,600 | 80 | Operational | ||||||
Ske... | 30,800 | 11 | Operational | ||||||
Ski... | 120,000 | 10 | Planned | ||||||
Ski... | 760,000 | Planned | |||||||
Sko... | 136,800 | 38 | Operational | ||||||
Sky... | 72,450 | 322 | Dismantled | ||||||
Sky... | 56,400 | 20 | Operational | ||||||
Sky... | 6,900 | 3 | Operational | ||||||
Sky... | 1,600 | 1 | Operational | ||||||
Sla... | 150,000 | 75 | Operational | ||||||
Sle... | 94,500 | 45 | Operational | ||||||
Smo... | 148,500 | 99 | Dismantled | ||||||
Smo... | 88,200 | 49 | Operational | ||||||
Smo... | 14,000 | 7 | Operational | ||||||
Smo... | 108,000 | 56 | Dismantled | ||||||
Smo... | 80,000 | 50 | Operational | ||||||
SMU... | 660 | 1 | Operational | ||||||
Sny... | 63,000 | 21 | Dismantled | ||||||
Sol... | 63,000 | 21 | Operational | ||||||
Sol... | 60,000 | 600 | Operational | ||||||
Sol... | 10,560 | 16 | Operational | ||||||
Sol... | 4,620 | 7 | Operational | ||||||
Sol... | 24,000 | 8 | Operational | ||||||
Sol... | 55,800 | 31 | Operational | ||||||
Sol... | 72,000 | 24 | Operational | ||||||
Sol... | 85,500 | 19 | Operational | ||||||
Sol... | 135,700 | 59 | Operational | ||||||
Sol... | 157,760 | 58 | Operational | ||||||
Sol... | 7,500 | 3 | Operational | ||||||
Sol... | 275,625 | 105 | Operational | ||||||
Som... | 9,000 | 6 | Operational | ||||||
Sou... | 10,500 | 7 | Operational | ||||||
Sou... | 132,000 | Operational | |||||||
Sou... | 13,800 | 6 | Operational | ||||||
Sou... | 6,900 | 3 | Operational | ||||||
Sou... | 70,500 | 25 | Operational | ||||||
Sou... | 2,500 | 1 | Operational | ||||||
Sou... | 200,000 | 100 | Operational | ||||||
Sou... | 300,300 | 91 | Operational | ||||||
Sou... | 101,200 | 44 | Operational | ||||||
Sou... | 1,209,000 | Planned | |||||||
Sou... | 1,200,000 | Planned | |||||||
Sou... | 8,800 | 4 | Operational | ||||||
Sou... | 155,100 | 25 | Operational | ||||||
Sou... | 19,800 | 9 | Operational | ||||||
Sou... | 4,400 | 2 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Sou... | 4,000 | 2 | Operational | ||||||
Sou... | 100,800 | 21 | Operational | ||||||
Sou... | 3,300 | 2 | Operational | ||||||
Sou... | 3,300 | 2 | Operational | ||||||
Sou... | 80,250 | 107 | Dismantled | ||||||
Spa... | 18,900 | 9 | Operational | ||||||
Spe... | 100,500 | 67 | Operational | ||||||
Spe... | 100,800 | 63 | Operational | ||||||
Spe... | 48,000 | 30 | Operational | ||||||
Spi... | 80,500 | 35 | Operational | ||||||
Spi... | 80,500 | 35 | Operational | ||||||
Spi... | 160,950 | 87 | Operational | ||||||
Spi... | 194,000 | 97 | Operational | ||||||
Spi... | 40,000 | 25 | Operational | ||||||
Spi... | 250 | 1 | Operational | ||||||
Spi... | 750 | 1 | Operational | ||||||
Spr... | 60,000 | 40 | Operational | ||||||
Spr... | 34,010 | 19 | Operational | ||||||
Spr... | 28,640 | 16 | Operational | ||||||
Spr... | 151,800 | 66 | Operational | ||||||
Spr... | 3,000 | 2 | Operational | ||||||
Spr... | 20,000 | 10 | Operational | ||||||
St.... | 600 | 1 | Operational | ||||||
St.... | 1,400 | 2 | Operational | ||||||
St.... | 900 | 1 | Operational | ||||||
St.... | 1,650 | 1 | Operational | ||||||
St.... | 225 | 1 | Operational | ||||||
St.... | 225 | 1 | Operational | ||||||
St.... | 225 | 1 | Operational | ||||||
Sta... | 850 | 1 | Operational | ||||||
Sta... | 120,000 | 80 | Operational | ||||||
Sta... | 98,700 | 47 | Operational | ||||||
Sta... | 83,160 | 126 | Operational | ||||||
Sta... | 39,600 | 60 | Operational | ||||||
Sta... | 176,880 | 268 | Operational | ||||||
Ste... | 20,000 | 8 | Operational | ||||||
Ste... | 15,000 | 6 | Operational | ||||||
Ste... | 74,800 | 44 | Operational | ||||||
Ste... | 201,000 | 67 | Operational | ||||||
Ste... | 211,220 | 118 | Operational | ||||||
Ste... | 164,680 | 92 | Operational | ||||||
Ste... | 16,100 | 7 | Operational | ||||||
Ste... | 13,800 | 6 | Operational | ||||||
Ste... | 57,000 | 38 | Operational | ||||||
Ste... | 25,500 | 17 | Operational | ||||||
Sti... | 11,500 | 5 | Operational | ||||||
Sti... | 68,250 | 26 | Operational | ||||||
Sto... | 34,125 | 13 | Operational | ||||||
Sto... | 55,125 | 21 | Operational | ||||||
Sto... | 11,500 | 5 | Operational | ||||||
Sto... | 2,050 | 1 | Operational | ||||||
Sto... | 18,450 | 9 | Operational | ||||||
Sto... | 2,200 | 1 | Operational | ||||||
Sto... | 18,450 | 9 | Operational | ||||||
Sto... | 5,000 | 2 | Operational | ||||||
Sto... | 14,350 | 7 | Operational | ||||||
Sto... | 52,500 | 35 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Sto... | 108,750 | 145 | Operational | ||||||
Sto... | 79,500 | 106 | Operational | ||||||
Sto... | 900 | 1 | Operational | ||||||
Sto... | 1,500 | 1 | Operational | ||||||
Sto... | 225 | 1 | Operational | ||||||
Sto... | 150,000 | 100 | Dismantled | ||||||
Sto... | 75,000 | 50 | Operational | ||||||
Sto... | 75,000 | 50 | Operational | ||||||
Sto... | 150,000 | 100 | Operational | ||||||
Str... | 98,800 | 26 | Under construction | ||||||
Str... | 300,000 | 150 | Operational | ||||||
Stu... | 660 | 1 | Operational | ||||||
Sug... | 34,000 | 17 | Operational | ||||||
Sug... | 168,000 | 40 | Operational | ||||||
Sum... | 62,100 | 23 | Operational | ||||||
Sun... | 2,300 | 1 | Operational | ||||||
Sun... | 121,260 | 43 | Operational | ||||||
Sun... | 26,000 | Operational | |||||||
Sun... | 201,000 | Under construction | |||||||
Sun... | 104,000 | 52 | Operational | ||||||
Sun... | 100 | 1 | Operational | ||||||
Sun... | 10,500 | 7 | Operational | ||||||
Sun... | 39,000 | 26 | Operational | ||||||
Sun... | 924,000 | Under construction | |||||||
Sun... | 100,000 | Planned | |||||||
Sus... | 2,500 | 1 | Operational | ||||||
Suz... | 2,100 | 1 | Operational | ||||||
Suz... | 2,100 | 1 | Operational | ||||||
Swa... | 6,400 | 4 | Operational | ||||||
Swa... | 3,200 | 2 | Operational | ||||||
Swa... | 4,250 | 5 | Operational | ||||||
Swe... | 200,000 | Under construction | |||||||
Swe... | 37,500 | 25 | Dismantled | ||||||
Swe... | 136,000 | Operational | |||||||
Swe... | 91,500 | 61 | Dismantled | ||||||
Swe... | 135,000 | 90 | Dismantled | ||||||
Swe... | 144,000 | 90 | Operational | ||||||
Swe... | 135,000 | 135 | Operational | ||||||
Swe... | 105,800 | 46 | Operational | ||||||
Swe... | 80,500 | 35 | Operational | ||||||
T-O... | 300 | 1 | Operational | ||||||
Tac... | 25,000 | 10 | Operational | ||||||
Tah... | 300,000 | 120 | Operational | ||||||
Tal... | 300 | 3 | Operational | ||||||
Tal... | 129,600 | 54 | Operational | ||||||
Tat... | 140,000 | 50 | Operational | ||||||
Tat... | 13,800 | 6 | Operational | ||||||
Tat... | 91,500 | 61 | Operational | ||||||
Tat... | 88,500 | 59 | Operational | ||||||
Tay... | 1,850 | 1 | Operational | ||||||
TB ... | 56,000 | 28 | Operational | ||||||
TB ... | 202,100 | 47 | Operational | ||||||
TB ... | 245,100 | 57 | Operational | ||||||
Tec... | 271,600 | 97 | Operational | ||||||
Teh... | 1,600 | 1 | Operational | ||||||
Teh... | 46,000 | Operational | |||||||
Teh... | 16,000 | Under construction | |||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Tei... | 1,500 | 1 | Operational | ||||||
Tem... | 1,800 | 1 | Operational | ||||||
Ten... | 22,000 | 11 | Operational | ||||||
Ten... | 220,000 | 100 | Operational | ||||||
Tes... | 750 | 1 | Operational | ||||||
Tho... | 13,200 | 8 | Operational | ||||||
Tho... | 12,000 | 8 | Operational | ||||||
Thr... | 9,900 | 6 | Operational | ||||||
Thu... | 25,300 | 11 | Operational | ||||||
Thu... | 272,500 | 109 | Operational | ||||||
Thu... | 107,500 | 43 | Operational | ||||||
Thu... | 48,000 | 16 | Operational | ||||||
Thu... | 23,000 | 10 | Operational | ||||||
Thu... | 276,360 | 98 | Operational | ||||||
Tim... | 100,800 | 48 | Operational | ||||||
Tim... | 45,375 | 25 | Operational | ||||||
Tim... | 54,450 | 30 | Operational | ||||||
Tim... | 100,800 | 24 | Operational | ||||||
Tim... | 25,200 | 7 | Operational | ||||||
Tim... | 189,000 | Under construction | |||||||
Tin... | 225 | 1 | Operational | ||||||
Tip... | 900 | 1 | Operational | ||||||
Tit... | 25,000 | 10 | Operational | ||||||
TJ ... | 100 | 1 | Operational | ||||||
Tja... | 450 | 1 | Operational | ||||||
Tok... | 300 | 3 | Operational | ||||||
Tok... | 100 | 1 | Operational | ||||||
Too... | 1,500 | 1 | Operational | ||||||
Too... | 1,790 | 1 | Operational | ||||||
Top... | 43,500 | 29 | Operational | ||||||
Top... | 58,500 | 39 | Operational | ||||||
Top... | 187,500 | 125 | Operational | ||||||
Top... | 10,500 | 7 | Operational | ||||||
Top... | 80,100 | 89 | Operational | ||||||
Top... | 80,000 | 40 | Operational | ||||||
Top... | 29,700 | 18 | Operational | ||||||
Top... | 99,000 | 66 | Operational | ||||||
Top... | 101,200 | 44 | Operational | ||||||
Tor... | 300,000 | 120 | Operational | ||||||
Tow... | 1,500 | 1 | Operational | ||||||
Tow... | 100 | 1 | Operational | ||||||
Tra... | 1,500 | 1 | Operational | ||||||
Tra... | 600 | 1 | Operational | ||||||
Tra... | 30,000 | 12 | Operational | ||||||
Tra... | 877,020 | 311 | Operational | ||||||
Tre... | 150,000 | 100 | Dismantled | ||||||
Tre... | 156,000 | Operational | |||||||
Tre... | 27,200 | 16 | Operational | ||||||
Tre... | 18,150 | 55 | Operational | ||||||
Tre... | 750 | 1 | Operational | ||||||
Tre... | 28,050 | 85 | Operational | ||||||
Tre... | 750 | 1 | Operational | ||||||
Tri... | 100,500 | 67 | Dismantled | ||||||
Tri... | 107,200 | 67 | Operational | ||||||
Tri... | 225,000 | 900 | Dismantled | ||||||
Tri... | 198,000 | 90 | Operational | ||||||
Tri... | 250,240 | 92 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Tro... | 2,300 | 1 | Operational | ||||||
Tua... | 10,500 | 7 | Operational | ||||||
Tua... | 16,800 | 8 | Operational | ||||||
Tuc... | 266,800 | 116 | Operational | ||||||
Tul... | 131,100 | 57 | Operational | ||||||
Tul... | 71,000 | Operational | |||||||
Tur... | 3,200 | 2 | Operational | ||||||
Tur... | 169,500 | 113 | Operational | ||||||
Tur... | 144,000 | 40 | Operational | ||||||
Tur... | 55,200 | 16 | Operational | ||||||
Tur... | 100 | 1 | Operational | ||||||
Tur... | 660 | 1 | Operational | ||||||
Tus... | 120,000 | 75 | Operational | ||||||
Tus... | 100,300 | 59 | Operational | ||||||
Twi... | 75,000 | 50 | Operational | ||||||
Twi... | 75,600 | 36 | Operational | ||||||
Twi... | 198,000 | 120 | Operational | ||||||
Twi... | 36,300 | 22 | Operational | ||||||
Twi... | 161,700 | 98 | Operational | ||||||
Twi... | 75,850 | 37 | Dismantled | ||||||
Twi... | 63,550 | 31 | Dismantled | ||||||
Twi... | 139,400 | 68 | Under construction | ||||||
Two... | 9,720 | 6 | Operational | ||||||
Two... | 280,000 | Under construction | |||||||
Tyl... | 125,580 | 52 | Operational | ||||||
Uil... | 4,500 | 3 | Operational | ||||||
UL ... | 3,570 | 1 | Operational | ||||||
Una... | 600 | 6 | Operational | ||||||
Uni... | 1,000 | 1 | Operational | ||||||
Uni... | 600 | 1 | Operational | ||||||
Uni... | 1,650 | 1 | Operational | ||||||
Uni... | 1,650 | 1 | Operational | ||||||
Uni... | 2,000 | 1 | Operational | ||||||
Upl... | 36,800 | 16 | Operational | ||||||
Upl... | 252,500 | 101 | Operational | ||||||
Upp... | 200 | 2 | Operational | ||||||
Ups... | 202,500 | 81 | Operational | ||||||
US ... | 268,000 | Planned | |||||||
US ... | 268,000 | 32 | Planned | ||||||
US ... | 1,200,000 | Planned | |||||||
Val... | 1,850 | 1 | Operational | ||||||
Val... | 3,000 | 2 | Operational | ||||||
Val... | 900 | 1 | Operational | ||||||
Val... | 10,000 | 5 | Operational | ||||||
Van... | 25,080 | 38 | Operational | ||||||
Van... | 98,900 | 43 | Operational | ||||||
Van... | 90,000 | 60 | Operational | ||||||
Vas... | 78,200 | 34 | Operational | ||||||
Vel... | 11,880 | 18 | Operational | ||||||
Ven... | 1,200 | 12 | Operational | ||||||
Vic... | 750 | 1 | Operational | ||||||
Vic... | 660 | 1 | Operational | ||||||
Vic... | 21,150 | 94 | Dismantled | ||||||
Vic... | 1,320 | 2 | Operational | ||||||
Vic... | 1,000 | 2 | Operational | ||||||
Vic... | 99,000 | 66 | Dismantled | ||||||
Vic... | 104,000 | Operational | |||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Vie... | 103,500 | 45 | Operational | ||||||
Vie... | 43,700 | 19 | Operational | ||||||
Vik... | 12,000 | 8 | Dismantled | ||||||
Vin... | 870,000 | Planned | |||||||
Vin... | 2,500,000 | Planned | |||||||
Vin... | 806,000 | 62 | Under construction | ||||||
Vir... | 880,000 | Approved | |||||||
Vir... | 880,000 | Approved | |||||||
Vir... | 880,000 | Approved | |||||||
Vir... | 12,000 | 2 | Operational | ||||||
Voy... | 131,100 | 38 | Operational | ||||||
Voy... | 172,800 | 48 | Operational | ||||||
Voy... | 20,700 | 6 | Operational | ||||||
Wak... | 257,250 | 150 | Operational | ||||||
Wal... | 660 | 1 | Operational | ||||||
Wal... | 101,520 | 36 | Operational | ||||||
Wal... | 9,200 | 4 | Operational | ||||||
Wal... | 1,500 | 1 | Operational | ||||||
Wal... | 212,000 | 106 | Operational | ||||||
Wal... | 153,000 | 102 | Dismantled | ||||||
Wal... | 165,240 | 102 | Operational | ||||||
Wap... | 100,500 | 67 | Operational | ||||||
Wau... | 100 | 1 | Operational | ||||||
Wav... | 1,500 | 2 | Operational | ||||||
Wav... | 189,000 | 90 | Operational | ||||||
Wav... | 10,000 | 5 | Operational | ||||||
Wav... | 900 | 1 | Operational | ||||||
Way... | 64,500 | 43 | Operational | ||||||
We ... | 1,320 | 2 | Operational | ||||||
Wea... | 106,500 | 71 | Dismantled | ||||||
Wea... | 113,600 | 71 | Operational | ||||||
Wea... | 40,500 | 27 | Dismantled | ||||||
Wea... | 43,200 | 27 | Operational | ||||||
Wea... | 72,600 | 22 | Operational | ||||||
WED... | 1,500 | 1 | Operational | ||||||
WED... | 4,500 | 3 | Operational | ||||||
WED... | 1,500 | 1 | Operational | ||||||
WED... | 1,500 | 1 | Operational | ||||||
WED... | 4,500 | 3 | Operational | ||||||
WED... | 1,500 | 1 | Operational | ||||||
WED... | 3,000 | 1 | Operational | ||||||
WED... | 3,000 | 1 | Operational | ||||||
WED... | 3,000 | 1 | Operational | ||||||
WED... | 3,000 | 1 | Operational | ||||||
WED... | 1,500 | 1 | Operational | ||||||
WED... | 1,500 | 1 | Operational | ||||||
WED... | 1,500 | 1 | Operational | ||||||
WED... | 3,000 | 1 | Operational | ||||||
WED... | 3,000 | 1 | Operational | ||||||
WED... | 3,000 | 1 | Operational | ||||||
Weg... | 10,000 | 8 | Dismantled | ||||||
Wel... | 140,760 | 60 | Operational | ||||||
Wes... | 51,000 | 34 | Operational | ||||||
Wes... | 900 | 1 | Operational | ||||||
Wes... | 202,400 | 92 | Operational | ||||||
Wes... | 32,000 | 16 | Operational | ||||||
Wes... | 43,400 | 62 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Wes... | 280,600 | 122 | Operational | ||||||
Wes... | 2,720 | 1 | Operational | ||||||
Wes... | 366,600 | 130 | Operational | ||||||
Wes... | 275 | 1 | Operational | ||||||
Wes... | 17,100 | 18 | Operational | ||||||
Wes... | 1,500 | 2 | Operational | ||||||
Wet... | 6,600 | 10 | Dismantled | ||||||
Whe... | 96,600 | 46 | Operational | ||||||
Whe... | 269,640 | 107 | Operational | ||||||
Whe... | 29,900 | 13 | Operational | ||||||
Whi... | 59,800 | 26 | Operational | ||||||
Whi... | 199,650 | 121 | Operational | ||||||
Whi... | 171,360 | 68 | Operational | ||||||
Whi... | 29,900 | 13 | Operational | ||||||
Whi... | 214,500 | 78 | Operational | ||||||
Whi... | 22,000 | 11 | Operational | ||||||
Whi... | 204,700 | 89 | Operational | ||||||
Whi... | 750 | 1 | Operational | ||||||
Whi... | 25,300 | 11 | Operational | ||||||
Whi... | 324,300 | 115 | Operational | ||||||
Whi... | 507,600 | 180 | Operational | ||||||
Whi... | 150,000 | 100 | Operational | ||||||
Whi... | 100,000 | 14 | Operational | ||||||
Whi... | 200,000 | 34 | Operational | ||||||
Whi... | 91,200 | 57 | Operational | ||||||
Whi... | 4,500 | 3 | Operational | ||||||
Whi... | 61,500 | 41 | Operational | ||||||
Whi... | 65,280 | 24 | Operational | ||||||
Wil... | 228,600 | 127 | Operational | ||||||
Wil... | 39,600 | 22 | Operational | ||||||
Wil... | 140,300 | 61 | Operational | ||||||
Wil... | 10,290 | 6 | Operational | ||||||
Wil... | 200,000 | 125 | Operational | ||||||
Wil... | 27,300 | 13 | Operational | ||||||
Wil... | 100,800 | 21 | Operational | ||||||
Wil... | 8,400 | 4 | Operational | ||||||
Wil... | 70,875 | 27 | Operational | ||||||
Wil... | 100,050 | 29 | Operational | ||||||
Wil... | 161,000 | 70 | Dismantled | ||||||
Wil... | 161,000 | Operational | |||||||
Wil... | 600 | 1 | Operational | ||||||
Wil... | 4,000 | 2 | Operational | ||||||
Wil... | 72,000 | 48 | Operational | ||||||
Wil... | 106,400 | 38 | Operational | ||||||
Wil... | 10,000 | 5 | Operational | ||||||
Wil... | 250,000 | 100 | Operational | ||||||
Wil... | 1,500 | 1 | Operational | ||||||
Wil... | 18,000 | 12 | Dismantled | ||||||
Wil... | 24,000 | 16 | Dismantled | ||||||
Wil... | 19,200 | 12 | Operational | ||||||
Wil... | 7,500 | 5 | Operational | ||||||
Wil... | 25,600 | 16 | Operational | ||||||
Wil... | 49,500 | 33 | Operational | ||||||
Win... | 850 | 1 | Operational | ||||||
Win... | 1,850 | 1 | Operational | ||||||
Win... | 96,700 | 967 | Operational | ||||||
Win... | 38,150 | 109 | Dismantled | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Win... | 500 | 1 | Operational | ||||||
Win... | 900 | 1 | Operational | ||||||
Win... | 1,600 | 1 | Operational | ||||||
Win... | 46,500 | 13 | Operational | ||||||
Win... | 14,300 | 111 | Dismantled | ||||||
Win... | 120,000 | 60 | Operational | ||||||
Win... | 64,400 | 28 | Operational | ||||||
Win... | 250 | 1 | Operational | ||||||
Win... | 32,000 | 16 | Operational | ||||||
Win... | 8,000 | 4 | Operational | ||||||
Win... | 96,600 | 42 | Operational | ||||||
Win... | 172,500 | 75 | Operational | ||||||
Win... | 29,900 | 13 | Operational | ||||||
Win... | 59,800 | 26 | Operational | ||||||
Win... | 2,500 | 1 | Operational | ||||||
Win... | 20,000 | 10 | Operational | ||||||
Win... | 1,500 | 2 | Operational | ||||||
Wio... | 1,600 | 1 | Operational | ||||||
Wol... | 112,500 | 75 | Dismantled | ||||||
Wol... | 120,000 | 75 | Operational | ||||||
Wol... | 6,250 | 5 | Operational | ||||||
Wol... | 1,500 | 1 | Operational | ||||||
Wol... | 64,500 | 43 | Operational | ||||||
Woo... | 100 | 1 | Operational | ||||||
Woo... | 10,200 | 17 | Dismantled | ||||||
Woo... | 9,200 | 4 | Operational | ||||||
Woo... | 750 | 1 | Operational | ||||||
Woo... | 159,720 | 242 | Operational | ||||||
WPS... | 9,240 | 14 | Operational | ||||||
Wra... | 900 | 1 | Operational | ||||||
Wyn... | 200 | 2 | Operational | ||||||
Wyo... | 144,000 | 80 | Operational | ||||||
Yah... | 21,000 | 14 | Operational | ||||||
You... | 500,000 | 117 | Operational | ||||||
You... | 169,200 | 60 | Operational | ||||||
Zac... | 2,000 | 1 | Operational | ||||||
Zac... | 2,000 | 1 | Operational | ||||||
Zep... | 4,500 | 3 | Operational | ||||||
Zep... | 4,500 | 3 | Operational | ||||||
Zir... | 1,200 | 2 | Dismantled | ||||||
Zot... | 3,300 | 2 | Operational | ||||||
|
Name Area |
Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
/ | ||||||
25 Mile Creek |
250,000 | 60 | Operational | |||
3-D Metals |
100 | 1 | Operational | |||
6th Space Warning Squadron |
3,360 | 2 | Operational | |||
AB Tehachapi |
6,970 | 31 | Operational | |||
Adair |